EBECO 170921a Quick Board User Guide
- June 12, 2024
- EBECO
Table of Contents
170921a Quick Board
User Guide
170921a Quick Board
Thank you for choosing Ebeco. We wish you well with your snow melting system.
We hope that you will use it and enjoy it for many years to come. For the
guarantee to be valid, the product must be installed and operated as indicated
in this manual. This means it is extremely important that you read the manual.
Complete information on installation of the snow melting heating cable/mat can
be found in the manual that is supplied with the heating solution package. The
heating cable/mat must be installed and handled as outlined in the manual. If
you have any questions, you are always more than welcome to contact Ebeco.
Call +46 (0) 317 07 75 50 or send an e-mail to support@ebeco.se. Feel free to
visit ebeco.com for more information.
Important
The insulation sheet is intended for use in normally-trafficked home
environments and similar locations. Please contact our planning department if
you require a system that can cope with environments that are heavily
trafficked on a regular basis.
Installing Ebeco Quick Board
Total build-up height for snow melting system including Quick Board
is approx. 7 cm. The preparation steps for the surface are the same for any
standard surface coating without a snow melting system. Comply with current
industry regulations.
(Dig out the ground if it has not been drained. The hole must be 10 cm larger
than the insulation sheet (X) on each side for additional working space. The
exact depth depends on local ground conditions. We recommend asking for advice
where you purchase the paving stones. Lay the fibre cloth (A) under the
drainage material. Fill with the draining support layer (B). To get the
correct height, base it on the final surface level after compaction. Discount
the thickness of the surface material (G), the insulation sheet (D), the
heating cable/mat (F) and the layer of sand between them (E). Fill with
support material up to this level.
Compact the bed. Fill then with sand or crushed stone (C) to adjust the
height. Compact to an even, hard surface, preferably with a ground
compactor.Make sure that
the insulation sheets (D, Figure 2) are fully in contact with the substrate
and do not sag. Fill the space around the sides of the sheets so that they lie
still.Place timbers on
the sheets to keep them in place. Important. To spread the heat there must be at least
a 2 cm deep layer of sand (E, Figure 2) between the insulation sheet and the
heating cable/mat. If they are in direct contact, the sheets may melt and
destroy the cable. When the entire surface is covered with sand the
heating cable/mat can be installed. Follow the installation instructions that
are supplied with the product.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>