GROWATT APX 5.0-30.0P-S2 Battery Module Installation Guide

June 13, 2024
Growatt

GROWATT

GROWATT APX 5.0-30.0P-S2 Battery Module

Product Information

The product is the APX 5.0~30.0P-S2, manufactured by ShenZhen Growatt New Energy Co.,Ltd. It consists of the following components:

  • APX 98034-P2 (Power Module)
  • APX 5.0P-B1 (Battery Module)

The product has the following specifications:

  • Environmental conditions: Max. temperature of +50°C and Min. temperature of -10°C, RH.+5%~+95% humidity
  • Installation tools required: M6 screws, M4x9 stainless steel screws

Product Usage Instructions

Floor Installation with Base:

  1. Ensure the installation location meets the requirements specified in the manual.
  2. Install the connecting pieces on both sides of the battery module and tighten the two screws.
  3. Install the anti-tipping plate on both sides of the battery module and tighten the two screws.
  4. Keep the battery module level and make a mark on the wall to punch holes for installation.
  5. Fix the battery module to the wall using M6 explosive screws.
  6. Secure the module on both sides to the wall.

Wall-Mounted Installation:

  1. Ensure the installation location meets the requirements specified in the manual.
  2. Loosen two screws and move up the handle on both sides of the battery module.
  3. Tighten the two screws to fix the battery and power modules.
  4. Install the connecting pieces on both sides and tighten the two screws.
  5. Secure the module on both sides to the wall.

Please note that the number of wall-mount installations should not exceed five, and the weight capacity of the wall should exceed 280kg.

Quick Installation Manual

APX 5.0~30.0P-S2
ShenZhen Growatt New Energy Co.,Ltd.
1

Environmental conditions

Max.+50
Installation tools
System size

Min.-10 M6

APX 98034-P2 (Power Module)

APX 5.0P-B1 (Battery Module)

RH.+5%~+95%

Left trim-cover*1 1-2 Check APX 5.0P-B1 List

Unit:mm

APX 5.0P-B1BM)

Right trim-cover1
}to Battery Module
Parallel cable
1

Trim-cover *2 1-3 Check accessories

Warranty card *1

A

B

C

A Anti tipping plate 2
B M6 explosive screw
2 C M4x9 stainless steel screws *3

1.Check
1- 1 Check APX 98034-P2 List

Please note the following accessories

}to PCS

APX 98034-P2 (PM)

to PCS to PE
}to Battery Module
System cable

C

Install-location card

D

A

B

A Operation Manual 1 B Quick installation manual 1 C Warranty Card 1
D Install-location card
1

A

B

C DE

A Protective rubber ring 4 B Anti tipping plate 2 C M6 explosive screw 2 D M6x12 stainless steel screws 1 E M4x9 stainless steel screws *3

2

APX 98034-P2 A
}2.5 meters
APX 5.0P-B1 Parallel extension cable
D

APX 5.0P-B1 B
*2
APX 5.0P-B1 Base E

*8

*6

*4

Wall bracket

C

2.5 meters
Cascading cable F

Battery Capacity 5kWh
10kWh 15kWh 20kWh 25kWh 30kWh 40kWh 50kWh 60kWh

Floor Installation Compound Mode
A+B+E A+B2+E A+B3+E A+B4+E
A+B
5+E2+D A+B6+E2+D
A
2+B8+E2+F A2+B10+E4+D2+F A2+B12+E4+D2+F

Wall-Mounted Installation Compound Mode
A+B+C A+B2+C A+B3+C A+B4+C
A+B
5+C2+D A+B6+C2+D
A
2+B8+C2+F A2+B10+C4+D2+F A2+B12+C4+D2+F

3

Install Environment

4. Wall-Mounted Installation Process

1

4-1 Installation Location Requirements

marking pen

300mm

4

5

Level

300mm

300mm

100mm 100mm

Note: Build sun&rain shade for modules to avoid the direct exposure of sunlight and rain.
3.Floor installation with base
3-1 Installation Location Requirements
Wall
~

Ground

Ground

Note: For floor installation with base, the maximum stack number of the battery is six. But if the battery number is greater than four, we recommend stacking them in two lines .

3-2 Installation Procedure Mounting Hole Dimensions

Unit:mm
20kWh

15kWh

10kWh 5kWh

Left
4

Right

1

12

Install the connecting pieces on both sides and tighten the two screws .

4

Install the anti tipping plate on both sides and tighten the two screws .

2

3

3 Keep the level of Battery Module

5

make a mark on wall to punch then fix the module

2

4

5

M6 explosive screw

Dia 8.0mm

Install-location

card

90°

1

Deep45~50mm 2

3

1 Install-location card ensures alignment marks on the wall. 2 3 4 5 fix the M6 explosive screw in the wall.

3

3 Install the connecting pieces on both sides

and tighten the two screws .

3

4

4

secure the module on both sides to

the wall.

Ground

Ground

Note: The number of wall-mount installations should not exceed five. Please make sure that the weight capacity of wall should exceed 280kg.

34-2 Installation Procedure

Mounting Hole Dimensions

Unit:mm

20kWh

15kWh

10kWh

5kWh

1

2

1 Loosen two screw, move up handle on both sides.

2 Tighten the two screws, fix the two battery modules.

4

1

3

Install the connecting pieces on both sides

and tighten the two

screws .

3

4

4

secure the module on both sides to

the wall.

1

2

1 Loosen two screw, move up handle on both sides.

2 Tighten the two screws, fix the battery and the power modules.

5

Left

Right

install the wall bracket
6

2

Dia 8.0mm

1

2

90°
Deep45~50mm 3

Level

Marking pen

1 Keep the level of Battery Module. 2 make a mark on wall to mounting holes fixing module. 3 mounting eight hole.

Install the anti tipping plate on both sides and tighten the two screws.

Loosen two screws, move up handle on both sides. Tighten the two screws, fix the battery and the power modules.
APX 98034-P2 Connection end face introduction

MOD 3-10KTL3-XH

MOD 3-10KTL3-XH

MOD 3-10KTL3-XH

2.5KW/5KWh
MOD 3-10KTL3-XH

5KW/10KWh
MOD 3-10KTL3-XH

7.5KW/15KWh
MOD 3-10KTL3-XH

fix the bracket on the wall. fix the battery module on the bracket.
Install-location card ensures alignment marks on the wall. Fix the M6 explosive screw in the wall.
Loosen two screws, move up handle on both sides. Tighten the two screws, fix the two battery modules.

Battery negative terminal to PCS
Battery neutral terminal to PCS
Battery positive terminal to PCS
Inverter communication to PCS
Battery module communication to battery(Link-in)module Battery module positive terminal to battery(B+) module Battery module negative terminal to battery(B-) module

5-2 APX 5.0P-B1 Connection end face introduction

76

B+

B-

Link-in

1

Link-in communication to another 1 Link-in battery(Link-out) or power
module(BMU)

2

Link-out

Link-out communication to another battery(Link-in) module

3

B+

Battery positive terminal to another battery(B+) module

4

B-

Battery negative terminal to another battery (B-) module

5 USB USB terminal

Battery negative terminal to

2

6

B-

another battery(B-) or power

Link-out

B+

B-

module (Module-) Battery positive terminal to

USB
5

7

B+ another battery(B+) or power

module (Module+)

34

10KW/20KWh
MID 11-30KTL3-XH

12.5KW/25KWh

15KW/30KWh
MID 11-30KTL3-XH

15KW/30KWh (A)
MID 11-30KTL3-XH

20KW/40KWh (A+B)

25KW/50KWh A+B)
MID 11-30KTL3-XH

30KW/60KWh (A+B)

APX 98034-P2 Left trim-cover

APX 98034-P2 Right trim-cover

APX 5.0-30.0P-S2

MOD 3-10KTL3-XH

Silk screen

Terminal serial number

Definition

1

WAKE-(W-)

Silk screen

Terminal serial number
10

Definition BAT.EN-

INV

2

WAKE+(W+)

COM

7

RS485_B(B)

9

BAT.EN+

8

RS485B2

8

RS485_A(A)

7

RS485A2

MID 11-30KTL3-XH

Silk screen
COM

Terminal serial number

A

B

10

30

9

29

8

28

Definition
BAT.ENBAT.EN+ RS485B2

7

27

RS485A2

PE

MOD3-10KTL3-XH

MID11-30KTL3-XH

Connector

Connector

1.Turn on DC Switch 2.Press the start key
more than 5S
Turn off DC Switch (waiting more than 90S)
Note: When multiple battery systems are used in parallel connection, you only need to press the start key of and module to start the system.

Shenzhen Growatt New Energy Co., Ltd 4-13/F,Building A,Sino-German(Europe) Industrial Park, Hangcheng Ave,Bao’an District, Shenzhen, China

+86 755 2747 1942

[email protected]

W: www.ginverter.com

Download Manual

12

Growatt New Energy
GR-UM-289-A-00

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Growatt User Manuals

Related Manuals