GROWATT APX 5.0-30.0P-S2 Battery Module Installation Guide
- June 13, 2024
- Growatt
Table of Contents
GROWATT APX 5.0-30.0P-S2 Battery Module
Product Information
The product is the APX 5.0~30.0P-S2, manufactured by ShenZhen Growatt New Energy Co.,Ltd. It consists of the following components:
- APX 98034-P2 (Power Module)
- APX 5.0P-B1 (Battery Module)
The product has the following specifications:
- Environmental conditions: Max. temperature of +50°C and Min. temperature of -10°C, RH.+5%~+95% humidity
- Installation tools required: M6 screws, M4x9 stainless steel screws
Product Usage Instructions
Floor Installation with Base:
- Ensure the installation location meets the requirements specified in the manual.
- Install the connecting pieces on both sides of the battery module and tighten the two screws.
- Install the anti-tipping plate on both sides of the battery module and tighten the two screws.
- Keep the battery module level and make a mark on the wall to punch holes for installation.
- Fix the battery module to the wall using M6 explosive screws.
- Secure the module on both sides to the wall.
Wall-Mounted Installation:
- Ensure the installation location meets the requirements specified in the manual.
- Loosen two screws and move up the handle on both sides of the battery module.
- Tighten the two screws to fix the battery and power modules.
- Install the connecting pieces on both sides and tighten the two screws.
- Secure the module on both sides to the wall.
Please note that the number of wall-mount installations should not exceed five, and the weight capacity of the wall should exceed 280kg.
Quick Installation Manual
APX 5.0~30.0P-S2
ShenZhen Growatt New Energy Co.,Ltd.
1
Environmental conditions
Max.+50
Installation tools
System size
Min.-10 M6
APX 98034-P2 (Power Module)
APX 5.0P-B1 (Battery Module)
RH.+5%~+95%
Left trim-cover*1 1-2 Check APX 5.0P-B1 List
Unit:mm
APX 5.0P-B1BM)
Right trim-cover1
}to Battery Module
Parallel cable 1
Trim-cover *2 1-3 Check accessories
Warranty card *1
A
B
C
A Anti tipping plate 2
B M6 explosive screw 2 C M4x9 stainless steel screws *3
1.Check
1- 1 Check APX 98034-P2 List
Please note the following accessories
}to PCS
APX 98034-P2 (PM)
to PCS to PE
}to Battery Module
System cable
C
Install-location card
D
A
B
A Operation Manual 1 B Quick installation manual 1 C Warranty Card 1
D Install-location card 1
A
B
C DE
A Protective rubber ring 4 B Anti tipping plate 2 C M6 explosive screw 2 D M6x12 stainless steel screws 1 E M4x9 stainless steel screws *3
2
APX 98034-P2 A
}2.5 meters
APX 5.0P-B1 Parallel extension cable
D
APX 5.0P-B1 B
*2
APX 5.0P-B1 Base E
*8
*6
*4
Wall bracket
C
2.5 meters
Cascading cable F
Battery Capacity 5kWh
10kWh 15kWh 20kWh 25kWh 30kWh 40kWh 50kWh 60kWh
Floor Installation Compound Mode
A+B+E A+B2+E A+B3+E A+B4+E
A+B5+E2+D A+B6+E2+D
A2+B8+E2+F A2+B10+E4+D2+F A2+B12+E4+D2+F
Wall-Mounted Installation Compound Mode
A+B+C A+B2+C A+B3+C A+B4+C
A+B5+C2+D A+B6+C2+D
A2+B8+C2+F A2+B10+C4+D2+F A2+B12+C4+D2+F
3
Install Environment
4. Wall-Mounted Installation Process
1
4-1 Installation Location Requirements
marking pen
300mm
4
5
Level
300mm
300mm
100mm 100mm
Note: Build sun&rain shade for modules to avoid the direct exposure of
sunlight and rain.
3.Floor installation with base
3-1 Installation Location Requirements
Wall
~
Ground
Ground
Note: For floor installation with base, the maximum stack number of the battery is six. But if the battery number is greater than four, we recommend stacking them in two lines .
3-2 Installation Procedure Mounting Hole Dimensions
Unit:mm
20kWh
15kWh
10kWh 5kWh
Left
4
Right
1
12
Install the connecting pieces on both sides and tighten the two screws .
4
Install the anti tipping plate on both sides and tighten the two screws .
2
3
3 Keep the level of Battery Module
5
make a mark on wall to punch then fix the module
2
4
5
M6 explosive screw
Dia 8.0mm
Install-location
card
90°
1
Deep45~50mm 2
3
1 Install-location card ensures alignment marks on the wall. 2 3 4 5 fix the M6 explosive screw in the wall.
3
3 Install the connecting pieces on both sides
and tighten the two screws .
3
4
4
secure the module on both sides to
the wall.
Ground
Ground
Note: The number of wall-mount installations should not exceed five. Please make sure that the weight capacity of wall should exceed 280kg.
34-2 Installation Procedure
Mounting Hole Dimensions
Unit:mm
20kWh
15kWh
10kWh
5kWh
1
2
1 Loosen two screw, move up handle on both sides.
2 Tighten the two screws, fix the two battery modules.
4
1
3
Install the connecting pieces on both sides
and tighten the two
screws .
3
4
4
secure the module on both sides to
the wall.
1
2
1 Loosen two screw, move up handle on both sides.
2 Tighten the two screws, fix the battery and the power modules.
5
Left
Right
install the wall bracket
6
2
Dia 8.0mm
1
2
90°
Deep45~50mm 3
Level
Marking pen
1 Keep the level of Battery Module. 2 make a mark on wall to mounting holes fixing module. 3 mounting eight hole.
Install the anti tipping plate on both sides and tighten the two screws.
Loosen two screws, move up handle on both sides. Tighten the two screws, fix
the battery and the power modules.
APX 98034-P2 Connection end face introduction
MOD 3-10KTL3-XH
MOD 3-10KTL3-XH
MOD 3-10KTL3-XH
2.5KW/5KWh
MOD 3-10KTL3-XH
5KW/10KWh
MOD 3-10KTL3-XH
7.5KW/15KWh
MOD 3-10KTL3-XH
fix the bracket on the wall. fix the battery module on the bracket.
Install-location card ensures alignment marks on the wall. Fix the M6
explosive screw in the wall.
Loosen two screws, move up handle on both sides. Tighten the two screws, fix
the two battery modules.
Battery negative terminal to PCS
Battery neutral terminal to PCS
Battery positive terminal to PCS
Inverter communication to PCS
Battery module communication to battery(Link-in)module Battery module positive
terminal to battery(B+) module Battery module negative terminal to battery(B-)
module
5-2 APX 5.0P-B1 Connection end face introduction
76
B+
B-
Link-in
1
Link-in communication to another 1 Link-in battery(Link-out) or power
module(BMU)
2
Link-out
Link-out communication to another battery(Link-in) module
3
B+
Battery positive terminal to another battery(B+) module
4
B-
Battery negative terminal to another battery (B-) module
5 USB USB terminal
Battery negative terminal to
2
6
B-
another battery(B-) or power
Link-out
B+
B-
module (Module-) Battery positive terminal to
USB
5
7
B+ another battery(B+) or power
module (Module+)
34
10KW/20KWh
MID 11-30KTL3-XH
12.5KW/25KWh
15KW/30KWh
MID 11-30KTL3-XH
15KW/30KWh (A)
MID 11-30KTL3-XH
20KW/40KWh (A+B)
25KW/50KWh A+B)
MID 11-30KTL3-XH
30KW/60KWh (A+B)
APX 98034-P2 Left trim-cover
APX 98034-P2 Right trim-cover
APX 5.0-30.0P-S2
MOD 3-10KTL3-XH
Silk screen
Terminal serial number
Definition
1
WAKE-(W-)
Silk screen
Terminal serial number
10
Definition BAT.EN-
INV
2
WAKE+(W+)
COM
7
RS485_B(B)
9
BAT.EN+
8
RS485B2
8
RS485_A(A)
7
RS485A2
MID 11-30KTL3-XH
Silk screen
COM
Terminal serial number
A
B
10
30
9
29
8
28
Definition
BAT.ENBAT.EN+ RS485B2
7
27
RS485A2
PE
MOD3-10KTL3-XH
MID11-30KTL3-XH
Connector
Connector
1.Turn on DC Switch 2.Press the start key
more than 5S
Turn off DC Switch (waiting more than 90S)
Note: When multiple battery systems are used in parallel connection, you only
need to press the start key of and module to start the system.
Shenzhen Growatt New Energy Co., Ltd 4-13/F,Building A,Sino-German(Europe) Industrial Park, Hangcheng Ave,Bao’an District, Shenzhen, China
+86 755 2747 1942
Download Manual
12
Growatt New Energy
GR-UM-289-A-00
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>