VISUAL LED 960 X 960MM Modular LED Display Installation Guide

October 30, 2023
VISUAL LED

VISUAL-LED-LOGO

VISUAL LED 960 X 960MM Modular LED Display

Product Information

The Modular LED Display 960 X 960mm is a high-quality LED display that provides stunning visual output. It consists of multiple cabinets or frames, each containing LED modules. The display is designed to be assembled and installed easily, allowing for seamless integration into various environments.

Installation Steps:

  1. Step 1: Unpacking and Positioning
    • Ensure at least 2 people are available for handling and assembly.
    • Use a soft protective surface (e.g., foam, cardboard, carpet, blanket) to place the frames out of the box.
    • Avoid any damage to the LEDs during unpacking and handling of the cabinets. These damages are not covered by warranty.
    • Always place the back of each frame first, protecting the LEDs.
    • Choose a perfectly level surface or structure to assemble the screen on.
    • Make sure to orientate the cabinets correctly, with pins facing up and never facing down.
    • LED panels are extremely sensitive elements, so extreme care must be taken to avoid damaging the LEDs during assembly.
  2. Step 2: Display Assembly
    • Set one cabinet over another.
    • Press levers from the upper cabinet and insert mechanisms from the lower frame.
    • Release upper levers with the mechanisms inserted and lock mechanisms from the lower frame. Repeat this procedure for the side anchorages if necessary.
  3. Step 3: Display Wiring
    • Data Wiring: LED cabinets must be interconnected in series with a network cable. Each cabinet has 2 internal network ports. Standard network cables can be used if necessary. Ensure there is a direct connection between the LED out port of the content player and the first cabinet of your display.
    • Power Wiring: Interconnect the cabinets of your display with the supplied power cables. Each cabinet has an internal power strip. Do not draw more than 3000W from the same connection.
  4. Appendix
    • The warranty does not cover damages to the perimeter LEDs of the display cabinets or LED modules.
    • Visual LED tests and verifies all components of each display before delivery.
    • The appendix provides instructions for changing an LED module if needed.

Once you have completed the assembly and wiring, you can proceed with the configuration of the display.

INSTALLATION STEPS

READ THIS MANUAL AND FOLLOW THE HANDLING GUIDELINES DURING THE ASSEMBLY PROCESS.

  1. UNPACKING AND POSITIONING OF THE DISPLAY CABINETS
  2. DISPLAY ASSEMBLY
  3. POWER & DATA WIRING
  4. APPENDIX

ASSEMBLY INSTRUCTIONS

  1. STEP 1: UNPACKING AND POSITIONING

    • A MINIMUM OF 2 PEOPLE FOR HANDLING AND ASSEMBLY
    • USE A SOFT PROTECTIVE SURFACE (E.G. FOAM, CARDBOARD, CARPET, BLANKET, ETC.) TO PLACE THE FRAMES OUT OF THE BOX.
    • WARNING : AVOID ANY DAMAGE TO THE LEDS DURING UNPACKING AND HANDLING OF THE CABINETS. THESE DAMAGES ARE NOT COVERED BY WARRANTY CAUTION : ALWAYS PLACE THE BACK OF EACH FRAME FIRST, PROTECTING THE LEDS.
    • WARNING : AVOID IMPACT DAMAGES ON THE DISPLAY AREA.
    • ATTENTION : CHOOSE A PERFECTLY LEVEL SURFACE OR STRUCTURE TO ASSEMBLE THE SCREEN ON
    • NOTE : BE SURE TO ORIENTATE THE CABINETS CORRECTLY.
    • LED PANELS ARE EXTREMELY SENSITIVE ELEMENTS. DURING DISPLAY ASSEMBLY, EXTREME CARE MUST BE TAKEN TO AVOID DAMAGING THE LEDS.
  2. STEP 2: DISPLAY ASSEMBLY

CABINET LOCKING MECHANISMS:

1. SET ONE CABINET OVER ANOTHER.
2. PRESS LEVERS FROM THE UPPER CABINET AND INSERT MECHANISMS FROM THE LOWER FRAME.
3. RELEASE UPPER LEVERS WITH THE MECHANISMS INSERTED
4. LOCK MECHANISMS FROM THE LOWER FRAME. REPEAT THIS PROCEDURE FOR THE SIDE ANCHORAGES IF NECESSARY.
  1. STEP 3: WIRING OF THE LED DISPLAY

DATA WIRING:

  * LED CABINETS MUST BE INTERCONNECTED IN SERIES WITH NETWORK CABLES. EACH CABINET HAS 2 INTERNAL NETWORK PORTS.
  * YOU CAN USE STANDARD NETWORK CABLE IF NECESSARY![VISUAL-LED-960-X-960MM-Modular-LED-Display-FIG- \(13\)](https://manuals.plus/wp-content/uploads/2023/07/VISUAL-LED-960-X-960MM-Modular-LED-Display-FIG-13.png) **POWER WIRING:**
  * POWER WIRING CONSISTS OF INTERCONNECTING THE CABINETS OF YOUR DISPLAY WITH THE SUPPLIED POWER CABLES.
  * EACH CABINET HAS AN INTERNAL POWER STRIP
  * DO NOT DRAW MORE THAN 3000W FROM THE SAME CONNECTION.![VISUAL-LED-960-X-960MM-Modular-LED-Display-FIG- \(14\)](https://manuals.plus/wp-content/uploads/2023/07/VISUAL-LED-960-X-960MM-Modular-LED-Display-FIG-14.png)

HANDLING AND ASSEMBLY GUIDELINES

  • THE WARRANTY DOES NOT COVER DAMAGES TO THE PERIMETER LEDS OF THE DISPLAY CABINETS.
  • THE WARRANTY DOES NOT COVER DAMAGE TO THE PERIMETER LEDS OF EVERY LED MODULE/ PANEL ON A DISPLAY CABINETVISUAL-LED-960-X-960MM-Modular-LED-Display-FIG- \(15\)
  • VISUAL LED TESTS AND VERIFIES ALL COMPONENTS OF EACH DISPLAY BEFORE DELIVERY.

**CHANGING AN LED MODULE

**

LED SCREENS ARE MADE UP OF “CABINETS” OR FRAMES. EACH CABINET CONTAINS SEVERAL LED MODULES

  • STEP 1: UNSCREW LED MODULE
  • STEP 2: LED MODULE EXTRACTION
    TO REMOVE THE AFFECTED MODULE FROM THE DISPLAY ARM FOLLOW THE STEPS OUTLINED AT THE END OF THIS MANUAL.

WARNING : BEFORE UNINSTALLING, CHECK THAT ALL PORTS ARE FULLY INSERTED. CHECK THE SURROUNDING MODULES TOO

  1. DISCONNECT THE LED MODULE CABLES TO SEPARATE IT FROM THE CABINET
  2. UNSCREW THE LED MODULE FROM THE CABINET
  3. EXTRACT THE LED MODULE

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals