SUSSEX VFMT Voda Floormount Mixer Installation Guide
- June 12, 2024
- SUSSEX
Table of Contents
- Product code
- Dimension
- New concrete floor (pre-pour)
- Fixing and connections (Fig. 2 & 3)
- Back-filled recess (Fig. 4)
- Rough-in (Wooden floor)
- Fixing and connections (Fig. 2 & 3)
- Back-filled recess (Fig. 4)
- Fit-off (Wooden floor)
- Fit-off (Wooden floor)
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
SUSSEX VFMT Voda Floormount Mixer
Product code
VFMT Floormount mixer 160mm
VFM200T Floormount mixer 200mm
VFM250T Floormount mixer 250mm
VFMHT Floormount mixer with hand held
VFMMCT Floormount mixer with curved outlet
VFMBMCT Floormount basin mixer curved
Dimension
New concrete floor (pre-pour)
*To install the Floor mount Fixing Valve a 50mm step down (recess) is required in the concrete surface where the floor mount is to be located.
- The recess area is to be a minimum of 200 x 300mm to allow enough room for the fixing valve to be fitted.
NOTE: This can be a larger area if unsure of exact mounting position.
Important: the recess area is required to be 50mm deep and must be flat
and level.
Existing concrete floor
-
Cut 400 x 400mm section through concrete slab where the floor mount mixer is to be located (Fig. 1).
-
Remove cut section and drill for the appropriate concrete ‘tie-rods’ into side walls of cavity.
-
Fit ‘tie-rods’ and pour concrete to create a 50mm step down (recess) from the original concrete floor surface (Fig. 1).
NOTE: Recess area must be flat and level. -
Hot and cold lines can be chased into the recessed area by cutting a minimum 50 x 50mm channel (Fig. 1)
Fixing and connections (Fig. 2 & 3)
-
Connect 1/2” elbows (or male/female nipples) to Fixing Valve in preparation for the hot/cold water lines.
-
Postion fixing valve into concreted recess area.
NOTE: Align “Front” to face bath or wash vessel. -
Mark and drill for 8mm “dyna bolt” or other appropriate anchoring bolts (not supplied).
-
Fix Floormount Fixing Valve and complete hot and cold water line connections.
-
Ensure the valve is level and well anchored.
-
Tighten “end caps” and perform water testing, and ensure there are no water leaks.
-
Leave end caps, pressure plate and fixing bolts in the valve to protect the threads until final fit-off.
*To install this floormount fixing valve, a 50mm step down (recess) is required in the concrete slab. The floormount fixing valve is supplied with end caps, pressure plate and fixing bolts. Leave intact until final fit off with the floormount mixer.
Back-filled recess (Fig. 4)
- Once all water connections are made and tested, fill in the recessed area and channelling up to the Fixing Valve with a mortar mix.
- After mortar has set, seal the area between mortar and the Fixing Valve.
Rough-in (Wooden floor)
-
Fix a 100x50mm min noggin. 50mm below the top of the joists in the position where the floormount mixer is to be located (Fig. 1).
NOTE: the floormount mixer has been supplied to suit a concrete installation. Some parts need to be changed to suit a wooden floor. -
To suit wooden flooring, remove the m8x25mm bolts and the pressure plate. Using a 6mm allen key, remove the two connection fittings (O-ring sealed) and replace with the longer version (tighten well).
-
Add the Floormount Mixer Adapted Plate. Replace the Pressure Plate and loosely fit the M8x40mm bolts (Fig. 2).
NOTE: the shorter connection fittings and M8x25mm bolts will not be required. -
Add appropriate elbows or 1/2” BSP nipples to allow for hot/cold water connections (not supplied).
-
Secure Floormount Mixer Valve to coggin using appropriate wood screws (not supplied).
NOTE: “FRONT” to face water vessel. -
Complete hot/cold water connections.
-
Ensure the valve is level and well anchored.
Fixing and connections (Fig. 2 & 3)
-
Connect 1/2” elbows (or male/female nipples) to Fixing Valve in preparation for the hot/cold water lines.
-
Postion fixing valve into concreted recess area.
NOTE : Align “Front” to face bath or wash vessel. -
Mark and drill for 8mm “dyna bolt” or other appropriate anchoring bolts (not supplied).
-
Fix Floormount Fixing Valve and complete hot and cold water line connections.
-
Ensure the valve is level and well anchored.
-
Tighten “end caps” and perform water testing, and ensure there are no water leaks.
-
Leave end caps, pressure plate and fixing bolts in the valve to protect the threads until final fit-off.
Back-filled recess (Fig. 4)
- Once all water connections are made and tested, fill in the recessed area and channelling up to the Fixing Valve with a mortar mix.
- After mortar has set, seal the area between mortar and the Fixing Valve
Fit-off (Wooden floor)
-
Prior to installing, ensure floor around fixing valve is completely sealed.
-
Raise the floormount cover flange.
-
Remove “end caps” and retain if required.
-
Connect hot and cold hoses from Floormount Mixer (a second person may be required to assist).
NOTE: the hose connection has a self sealing fitting. No sealant is required. -
Tighten the hex nuts of the hose fittings using an appropriate spanner (tighten well).
-
Carefully lower the mixer to meet the pressure plate.
NOTE: “Front” of Floormount Mixer must face the bath or wash vessel. -
Align and fit supplied M8 bolts.
-
Before fully tightening, allow water flow and check for water leaks.
-
Tighten M8 bolts and check Floormount Mixer is level. If levelling is required, loosen M8 bolts and adjust levelling screws as required.
-
To complete the installation, lower the cover flange until it meets the finished floor surface.
-
Check mixer function and look for any leaks.
Fit-off (Wooden floor)
-
Prior to installing, ensure floor around fixing valve is completely sealed.
-
Raise the floormount cover flange.
-
Remove “end caps” and retain if required.
-
Connect hot and cold hoses from Floormount Mixer (a second person may be required to assist).
NOTE: the hose connection has a self sealing fitting. No sealant is required. -
Tighten the hex nuts of the hose fittings using an appropriate spanner (tighten well).
-
Carefully lower the mixer to meet the pressure plate.
NOTE: “Front” of Floormount Mixer must face the bath or wash vessel. -
Align and fit supplied M8 bolts.
-
Before fully tightening, allow water flow and check for water leaks.
-
Tighten M8 bolts and check Floormount Mixer is level. If levelling is required, loosen M8 bolts and adjust levelling screws as required.
-
To complete the installation, lower the cover flange until it meets the finished floor surface.
-
Check mixer function and look for any leaks.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>