Signature Streetscapes Gigabit ETH HAT Light Installation Guide

June 4, 2024
Signature Streetscapes

CLASSIC BLADE TRIM INSTALLATION GUIDE
TOLL-FREE: 1-800-705-1446 WE CAN HELP!

TOOLS REQUIRED

– Mounting Template (Provided)
– Mounting Hardware Packet (Provided)
– 3/8” Drill Bit
– 1/2” Wrenches
– Permanent Marker
– Tape Measure
– Hammer
– Center Punch
– Local Sign Ordinance Height and Location RequirementsSignature
Streetscapes Gigabit ETH HAT Light

INSTRUCTIONS

  1. The hole location for sign installation is determined by the height requirement and orientation of the completed installation.
  2. Measure from the top of the post to the first hole location & mark w/a a permanent marker.
  3. Use the mounting template to locate and mark the bottom hole location.
  4. Use a hammer and center punch to dimple the hole locations (if necessary).
  5. Use a 3/8” drill bit to drill a clearance hole.
  6. Repeat steps 1-5 to drill holes on the opposite side of the post
  7. Repeat steps 1-5 to drill holes on each side of post for a second street sign
  8. Mount Classic Blade Trim to post using 5/16-18 stainless steel bolts & washers (provided). Cast aluminum bracket has (2) 5/16-18 tapped holes to accept thru-bolts.

NOTE: Mounting bracket will seat best to the fluted post when mounting holes are drilled center in the recessed flute.

HARDWARE REQUIRED

ATTACHMENT FOR 3” ROUND FLUTED, SMOOTH OR SQUARE POST
(2) 5/16-18 X 4” stainless steel hex bolts
(4) 5/16” stainless steel flat washers
(2) 5/16” stainless steel split lock washers
(2) 5/16-18 X 5” stainless steel hex bolts
(4) 5/16” stainless steel flat washers
(2) 5/16” stainless steel split lock washers

COMPLETED SIGN INSTALLATION

Signature Streetscapes Gigabit ETH HAT Light - SMOOTH OR SQUARE
POST ATTACHMENT FOR 4” ROUND FLUTED, SMOOTH OR SQUARE POST
NOTE: Sign face orientation and direction is a key components of the installation process. It is important to plan ahead to ensure that each sign may be viewed properly from each direction. It will be necessary to offset the height of two street blades mounted perpendicular to each other to avoid interference of the mounting hardware.
IMPORTANT: Hardware only included if purchased with post or if specified at time of order.

TOOLS REQUIRED

– Mounting Template (Provided)
– Mounting Hardware Packet (Provided)
– 3/8” Drill Bit
– 1/2” Wrenches
– Permanent Marker
– Tape Measure
– Hammer
– Center Punch
– Local Sign Ordinance Height and Location Requirements

INSTRUCTIONS

  1. The hole location for sign installation is determined by the height requirement and orientation of the completed installation.
  2.  Measure from the top of the post to the first hole location & mark w/a a permanent marker.
  3.  Use the mounting template to locate and mark the bottom hole location.
  4.  Use a hammer and center punch to dimple the hole locations (if necessary).
  5.  Use a 3/8” drill bit to drill a clearance hole.
  6.  Repeat steps 1-5 to drill holes on the opposite side of post
  7.  Repeat steps 1-5 to drill holes on each side of the post for a second street sign
  8.  Mount Paddle Trim to post using 5/16-18 stainless steel bolts & washers (provided). Cast aluminum bracket has (2) 5/16-18 tapped holes to accept thru-bolts.

Signature Streetscapes Gigabit ETH HAT Light - MOUNTING
TEMPLATE

NOTE: Brackets are pre-drilled with 3/8” holes ONLY when mounting 180 degrees from classic blade trims. As specified in the drawings. If not specified, brackets will come standard with 5/16-18 tapped holes

HARDWARE REQUIRED
ATTACHMENT FOR 3” ROUND FLUTED, SMOOTH OR SQUARE POST
(2) 5/16-18 X 4” stainless steel hex bolts
(4) 5/16” stainless steel flat washers
(2) 5/16” stainless steel split lock washers
(2) 5/16-18 X 5” stainless steel hex bolts
ATTACHMENT FOR 4” ROUND FLUTED, SMOOTH OR SQUARE POST
(4) 5/16” stainless steel flat washers
(2) 5/16” stainless steel split lock washers
COMPLETED SIGN INSTALLATION![Signature Streetscapes Gigabit ETH HAT Light

  • SMOOTH OR SCOMPLETED SIGN INSTALLATION](https://manuals.plus/wp- content/uploads/2022/09/Signature-Streetscapes-Gigabit-ETH-HAT-Light-SMOOTH- OR-SCOMPLETED-SIGN-INSTALLATION.png)

NOTE: Sign face orientation and direction is a key components of the installation process. It is important to plan ahead to ensure that each sign may be viewed properly from each direction. It will be necessary to offset the height of two street blades mounted perpendicular to each other to avoid interference with the mounting hardware.
IMPORTANT: Hardware only included if purchased with a post or if specified at the time of order.

signaturestreetscapes.com
1-800-705-1446

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals