Jinko Solar JKMxxxPP PV Modules Instruction Manual
- June 12, 2024
- Jinko Solar
Table of Contents
- Jinko Solar JKMxxxPP PV Modules
- Product Information
- Product Usage Instructions
- General Information
- Installation
- Wiring and connection
- Maintenance and care
- Electrical specification
- Disclaimer of Liability
- Appendix: Applicable Products
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Jinko Solar JKMxxxPP PV Modules
Product Information
General Information
The product is a photovoltaic (PV) module designed to generate DC electrical energy when exposed to sunlight or other light sources. It consists of PV cells enclosed in a protective glass panel.
Warnings
-
PV modules can generate burns, sparks, and lethal shock, especially at the terminals. Exercise caution when handling.
-
Avoid directing artificially concentrated sunlight onto the module or panel.
-
Broken solar module glass can cause electric shock or fire.
Replace damaged modules immediately as they cannot be repaired. -
During installation, cover the modules with an opaque material to reduce the risk of electrical shocks or burns.
-
Installation and maintenance work should be done by qualified personnel under sun-sheltering covers or sunshades.
-
Follow the battery manufacturer’s recommendations if using batteries with the modules.
-
Do not use the module to replace roofs or walls of living buildings.
-
Avoid installing modules where flammable gas may be present.
-
Use insulated tools for electrical connections to prevent electric shock.
-
If the power supply is not disconnected, do not use water to extinguish a fire.
-
Do not remove any part installed by Jinko Solar or disassemble the module.
-
Read and understand all instructions before installing, wiring, operating, and maintaining the module.
-
Avoid lifting PV modules using the attached cables or junction box.
-
All Dual glass PV systems, except non-metallic frames, must be earthed according to relevant regulations.
-
Under normal conditions, the module may produce more current and/or voltage than reported at standard test conditions. Multiply the Isc and Voc values on the module by 1.25 when determining PV system component voltage ratings, conductor current ratings, fuse sizes, and size of controls connected to the PV output.
-
During transportation, unpack all parts properly with care.
-
Do not stand or step on the PV module to avoid damage and injury.
-
Only connect PV modules with the same cell size in series.
-
Avoid subjecting the module to shock or vibration during transportation to prevent damage or cell micro cracks.
-
Avoid dropping the module from a vehicle, house, or hands during transportation to prevent damage.
-
Protect modules (glass, junction boxes, connectors, etc.) from long-term exposure to environments containing sulfur, strong acid, strong alkaline, etc., which may cause corrosion.
-
Clean the glass surface of the module only with tap water. Do not use chemicals or corrosive substances.
Product Usage Instructions
Follow these instructions for safe and proper usage of the PV module:
- Handle the module with caution to avoid burns, sparks, and electric shock.
- Avoid directing concentrated sunlight onto the module or panel.
- Regularly check for any broken glass on the module and replace it immediately if found.
- During installation, cover the module with an opaque material to prevent electrical shocks or burns.
- Ensure that only qualified personnel install or perform maintenance work on the module under sun-sheltering covers or sunshades.
- If using batteries with the module, follow the recommendations of the battery manufacturer.
- Do not use the module to replace or partly replace roofs and walls of living buildings.
- Avoid installing the module where flammable gas may be present.
- Use insulated tools for electrical connections to prevent electric shock.
- If there is a fire, make sure to disconnect the power supply before attempting to extinguish it.
- Do not remove any part installed by Jinko Solar or attempt to disassemble the module.
- Read and understand all instructions provided before attempting to install, wire, operate, and maintain the module.
- Avoid lifting the PV module using the attached cables or junction box.
- Ensure proper earthing of all Dual glass PV systems except non-metallic frames according to relevant regulations.
- Consider the increased current and/or voltage production of the module under normal conditions when determining voltage ratings, conductor current ratings, fuse sizes, and size of controls connected to the PV output.
- Handle all parts of the module carefully during transportation and unpack them properly at the installation site.
- Avoid standing or stepping on the PV module to prevent damage and injury.
- Connect only PV modules with the same cell size in series.
- Avoid subjecting the module to shock or vibration during transportation to prevent damage or cell micro cracks.
- Take precautions to prevent dropping the module from a vehicle, house, or hands during transportation to avoid damage
- Protect modules (glass, junction boxes, connectors, etc.) from long-term exposure to environments containing sulfur, strong acid, strong alkaline, etc., which may cause corrosion.
- Clean the glass surface of the module only with cool tap water.
Avoid cleaning when the module surface temperature is high to prevent glass breakage. Do not use chemicals or corrosive substances.
General Information
Overview
Thanks for choosing Jinko Solar PV modules. In order to ensure the PV modules
are installed correctly, please read the following installation instructions
carefully before modules are installed and used.
Please remember that these products generate electricity and certain safety
measures need to be taken to avoid danger.
Make sure the module array is designed in such a way not to exceed the maximum
system voltage of any system component such as connectors or inverters.
The assembly is to be mounted over a fire resistant roof covering rated for
the application. Before mounting the module, please consult your local
building department to determine approved roofing materials.
The modules are qualified for application class A: Hazardous voltage (IEC
61730: higher than 50V DC; EN 61730: higher than 120V), hazardous power
applications (higher than 240W) where general contact access is anticipated.
Modules qualified for safety through EN IEC 61730-1 and -2 within this
application class are considered to meet the requirements for Safety Class II.
Warnings
-
PV modules generate DC electrical energy when exposed to sunlight or other light sources. Active parts of module such as terminals can result in burns, sparks, and lethal shock.
-
Artificially concentrated sunlight shall not be directed on the module or panel.
-
Front protective glass is utilized on the module. Broken solar module glass is an electrical safety hazard (may cause electric shock or fire). These modules cannot be repaired and should be replaced immediately.
-
To reduce the risk of electrical shocks or burns, modules may be covered with an opaque material during installation to avoid injury.
-
The installation work of the PV array can only be done under the protection of sun-sheltering covers or sunshades and only qualified person can install or perform maintenance work on this module.
-
Follow the battery manufacture‘s recommendations if batteries are used with modules.
-
Do not use this module to replace or partly replace roofs and walls of living buildings.
-
Do not install modules where flammable gas may be present.
-
Do not touch live terminals with bare hands. Use insulated tools for electrical connections.
-
Do not use water to extinguish the fire when the power supply is not disconnected.
- Do not remove any part installed by Jinko Solar or disassemble the module.
- All instructions should be read and understood before attempting to install, wire, operate and maintain the module.
- Don’t lift up PV modules using the attached cables or the junction box.
- All Dual glass PV systems except the non-metallic frame must be earthed. If there is no special regulation, please follow the National Electrical Code or other national code.
- Under normal conditions, a photovoltaic module is likely to experience conditions that produce more current and/or voltage than reported at standard test conditions. Accordingly, the value of Isc and Voc marked on the module should be multiplied by 1.25 when determining PV system component voltage ratings, conductor current ratings, fuse sizes, and size of controls connected to the PV output.
- Once the PV module has been shipped to the installation site, all of the parts should be unpacked properly with care.
- Do not stand or step on the PV module like below pictures show. This is prohibited and there is a risk of damage to the module and cause injury for you.
- Only PV modules with the same cell size should be connected in series.
- During transporting modules, please attempt to minimize shock or vibration to the module, as this may damage the module or lead to cell micro cracks.
- During all transportation situations, never drop the module from a vehicle, house or hands. This will damage module.
- Modules (glass, junction boxes, connectors, etc.) shall be protected from long-term exposure to environments containing sulfur, strong acid, strong alkaline, etc., which may pose a risk of corrosion to the product.
- Do not clean the glass with chemicals. Only use tap water. Make sure the module surface temperature is cool to the touch. Cleaning modules with cool water, when module surface temp is high, may result in glass breakage. Do not brush paint or corrosive substances on the surface of the modules.
- Do not disconnect any of the modules when under load.
- When looking at PV modules with anti-reflection (AR) coating technology, it will be normal to see some cells with a slight color difference at different angles. Modules with LRF(light reflective film) and without LRF should not be built in the same array or roof.
- The junction box connector should not be in contact with oily substances, organic solvents and other corrosive materials to avoid damage to the connector. For example, alcohol, gasoline, lubricants, rust inhibitors, herbicides and so on.
- Before the installation of modules, it is recommended to add rainproof facilities in the project site to avoid direct open-air placement.
- Corner protection of DV module is used to protect the module during transportation, and the customer can remove or leave it on modules.
- Connector of junction box can not be contacted with oily substances, for example, lubricant, rust inhibitor etc.
- The maximum altitude the PV module is designed for ≤ 2000m.
- Meaning of crossed–out wheeled dustbin:
- Do not dispose of electrical appliances as unsorted municipal waste, use separate collection facilities.
- Contact your local government for information regarding the collection systems available.
- If electrical appliances are disposed of in landfills or dumps,hazardous substances can leak into the groundwater and get into the food chain, damaging your health and well-being.
- When replacing old appliances with new ones, the retailer is legally obligated to take back your old appliance for disposals at least free of charge.
Installation
Installation Safety
- Always wear protective head gear, insulating gloves and safety shoes (with rubber soles) and other protective measures during installation.
- When installing or maintaining the photovoltaic system, please do not wear metal rings, watches and other metal products, so as not to cause electric shock danger and damage the modules.
- Keep the PV module packed in the carton until installation. Once the modules are removed from the packing box, they should be installed and connected to the bus box in time. If they are not installed immediately, protective measures (such as adding rubber joint cover, etc.) should be taken on the connection head.
- Do not touch the PV module unnecessarily during installation. The glass surface and the frame may be hot. There is a risk of burns and electric shock.
- Do not work in rain, snow or windy conditions.
- Due to the risk of electrical shock, do not perform any work if the terminals of the PV module are wet.
- Use insulated tools and do not use wet tools.
- When installing PV modules, do not drop any objects (e.g., PV modules or tools).
- Make sure flammable gasses are not generated or present near the installation site.
- Insert module connectors fully and correctly. An audible “click” sound should be heard. This sounds confirms the connectors are fully seated. Check all connections.
- The module leads should be securely fastened to the module frame, Wire Management should be done in a way to avoid the connector from scratching or impacting the rear cover of the module.
- Do not touch the junction box and the end of the interconnect cables (connectors) with bare hands during installation or under sunlight, regardless if the PV module is connected to or disconnected from the system.
- Do not expose the PV module to excessive loads on the surface of the PV module or twist the frame.
- Do not hit or put excessive load on the glass or rear cover, this may break the cells or cause micro cracks.
- During the installation or operation, don’t use sharp tools to wipe the rear cover and glass. Scratches can appear on the module.
- Do not drill holes in the frame. It may cause corrosion of the frame.
- When installing modules on roof mounted structures, please try to follow the “from top to bottom” and/or “from left to right” principle, and don’t step on the module. This will damage the module and would be dangerous for personal safety.
- Modules will have thermal expansion and cold contraction effect. When installing, the interval between two adjacent conventional modules is recommended > 10mm.The minimum clearance between two adjacent double-sided modules is recommended > 20mm;If there are special requirements, please confirm with Jinko and install it;
- During the installation, disassembly, maintenance and any other related processes of the product, it is recommended that the force applied between the cable and the connector, the cable and the junction box be no more than 60N.
Installation Condition
Climate Condition
Please install the modules in the following conditions:
- The environment temperature: with in –40°C(-40℉) to 85°C (185℉) .
- Do not install modules in a place where there may be water immersion.
﹡Note: The mechanical load bearing (include wind and snow loads) of the module is based on the approved mounting methods. The professional system installer must be responsible for mechanical load calculation according to the system design.
Site Selection
In most applications, Jinko solar PV modules should be installed in a location
where they will receive maximum sunlight throughout the year. In the Northern
Hemisphere, the module should typically face south, and in the Southern
Hemisphere, the modules should typically face north. Modules facing 30 degrees
away from true South (or North) will lose approximately 10 to 15 percent of
their power output. If the module faces 60 degrees away from true South (or
North), the power loss will be 20 to 30 percent.
When choosing a site, avoid trees, buildings or obstructions, which could cast
shadows on the solar photovoltaic modules especially during the winter months
when the arc of the sun is lowest over the horizon. Shading causes loss of
output, even though the factory-fitted bypass diodes of the PV module will
minimize any such loss.
Do not install the PV module near open flame or flammable materials.
When solar modules are used to charge batteries, the battery must be installed
in a manner, which will protect the performance of the system and the safety
of its users. Follow the battery manufacturer’s guidelines concerning
installation, operation and maintenance recommendations. In general, the
battery (or battery bank) should be away from the main flow of people and
animal traffic. Select a battery site that is protected from sunlight, rain,
snow, debris, and is well-ventilated. Most batteries generate hydrogen gas
when charging, which can be explosive. Do not light matches or create sparks
near the battery bank. When a battery is installed outdoors, it should be
placed in an insulated and ventilated battery case specifically designed for
the purpose.
Do not install the PV module in a location where it would be immersed in water
or continually exposed to water from a sprinkler or fountain etc.
The PV module can be installed at a distance of 50 m to 500m from the
seashore. However, when installing module within the distance, protect the
connectors or add dust plugs. After removing the dust plugs, connect the
connectors immediately and take other anti-rust measures to prevent rust.
When the modules are installed on the roof, they must be separated from the
roof by more than 10cm to facilitate air circulation and heat dissipation.
Tilt Angle Selection
The tilt angle of the PV module is measured between the surface of the PV
module and a horizontal ground surface (Figure 1). The PV module generates
maximum output power when it faces the sun directly.
For standalone systems with batteries where the PV modules are attached to a permanent structure, the tilt angle of the PV modules should be selected to optimize the performance based on seasonal load and sunlight. In general, if the PV output is adequate when irradiance is low (e.g., winter), then the angle chosen should be adequate during the rest of the year. For grid- connected installations where the PV modules are attached to a permanent structure, PV modules should be tilted so that the energy production from the PV modules will be maximized on an annual basis.
Mechanical Installation Introduction
Jinko Frameless Dual glass modules usually can be mounted by the clamps.
Jinko Dual glass modules of frame usually can be mounted by the clamps and
bolts. According to IEC61215 for a maximum positive design loading of below
3600Pa, and negative design loading 1600Pa, with 1.5 times safety factor.
The Installation of Dual Glass Modules without Frame
Be sure to avoid shadowing effects from the module clamps. When choosing this type of clamp-mounting method, please be sure to use at least six clamps on each modules, and three clamps should be attached on each long side of the module. Depending on the local wind and snow loads, if excessive pressure load is expected, additional clamps or support would be required to ensure the module can bear the load. The applied torque should be large enough to fix it steadily (about 16-20 N▪m) .For safety, you’d better follow the clamps manufacture’s recommendation. Please find detailed mounting information in the below illustration, and we suggest the clamps are mounted between J and K, as shown below.
Module type
| Dimensions ( mm )
---|---
Maximum designed mechanical load : 3600Pa (positive ) &
1600Pa (negative)
A*B| J| K
Group 1 & Group 5*| 1968992| 300| 400
Group 2 & Group 6| 1658992| 300| 400
Group 3 & Group 7| 1658992| 300| 400
Group 4 & Group 8*| 1658992| 300| 400
---|---|---|---
Group 9
| 1978992 & 1978986
20021002 & 20161012
| ****
300
| ****
400
Group 10
| 2000992 & 1994986
20241002 & 20471012
| ****
300
| ****
400
Group 11
| 1668992 & 1650986
16801002 & 16931012
| ****
300
| ****
400
Group 12
| 1698998 & 1680992
16981002 & 17211012
| ****
300
| ****
400
Group 13| 2123995 & 21321002| 430| 530
Group 14| 18161002| 430| 530
Group 15| 21871002| 430| 530
Group 16| 1862998| 430| 530
Group 17| 21871028 & 21981026| 430| 530
Group 18| 18621028 & 1872*1026| 430| 530
Group 19
| 2223*1025
2255*1032
| ****
450
| ****
550
Group 20| 18891025| 400| 500
Group 21| 20901039 & 20901038| L/4-50| L/4+50
Group 22| 17501039 & 17501038| 300| 400
| 17011122 & 17171132| A/5| A/4
Group 23 & Group 24| 17191134 & 16691122,| A=module| A=module
| 16851132 & 16781134| length| length
| 18841122 & 19011132| A/5| A/4
Group 25 & Group 26| 19041134 & 18681134| A=module| A=module
| 18651132 & 18481122| length| length
| 20271122 & 20461132| A/5| A/4
Group 27 & Group 28| 20491134 & 20891134| A=module| A=module
| 20861132 & 2067*1122| length| length
Group 29 & Group 30
| 22501122 & 22601130
22711132 & 22741134
22091130 & 22061122
22271132 & 22301134
| ****
A/5
A=module length
| ****
A/4
A=module length
Group 31
| 23851122 & 23931130
24081132 & 24111134
| A/5
A=module length
| A/4
A=module length
Table 3 : Mechanical dimensions when modules installed with clamps fitting method
Before the installation, please read the operation instructions of the PV system carefully. In addition, please completely prepare the site before the installation.
The Installation of Dual Glass Modules with Frame.
Fixation with Bolts (eight mounting holes)
The frame of each module has 8 mounting holes (Length Width: 14mm9mm) used
to secure the modules to support structure. Always use all the eight mounting
holes to secure the modules. The module frame must be attached to a mounting
rail using M8 corrosion-proof bolts together with spring washers and flat
washers in eight symmetrical locations on the PV module. The applied torque
value should be big enough to fix the modules steadily. The reference value
for M8 bolt is 16~20N*m. As to special support system or special installation
requirement, please reconfirm with the support’s supplier for the torque
value. Please find detailed mounting information in the below illustration as
Figure 2 and Table 5.
Module type
| Dimensions ( mm )
---|---
Maximum designed mechanical load : 3600Pa (positive ) & 1600Pa (negative)
Frame| *AB
Group 1*| 40| 1984998 & 1984*992
20091008 & 20231018
Group 2 & Group 7| 40| 2000992 & 20311008 & 20541018
Group 3| 35| 1674998 & 1686*1008
16991018 & 1656992
Group 4 & Group 8| 35| 1698998 & 1680992
17041008 & 17271018
Group 5| 40| 1974998
Group 6| 35| 1664998
Group 19 & Group 20
| ****
30
| 17011122 & 17171132
17191134 & 16691122
16851132 & 16781134
Group 21 & Group 22
| ****
30
| 18841122 & 19011132
19041134 & 18681134
18651132 & 18481122
Group 23 & Group 24
| ****
30
| 20271122 & 20461132
20491134 & 20891134
20861132 & 20671122
Group 25 & Group 26| 30| 22741134 & 22781134
& 2230*1134
Group 27| 30| 23851122 & 23931130
24081132 & 24111134
Group 28| 30&35| 2465*1134
Table 5: Mechanical dimensions when modules installed with bolts fitting method
Mounting with Bolts(four mounting holes)
Module type
| Dimensions ( mm )
---|---
Maximum designed mechanical load : 3600Pa (positive ) & 1600Pa (negative)
Frame| *AB
Group 13| 30| 22231025 & 22551032
Group 25| 30| 22741134 & 22781134
Group 26| 30| 2230×1134
Group 28**| 30&35| 2465×1134
Table 6: Mechanical dimensions when modules installed with bolts fitting
method
Note:The installation method of bolt fitting is based on the experimental
results inJinko.
Fixation with clamps at long sides of frames
The module clamps should not come into contact with the front glass and must
not deform the frame. Be sure to avoid shadowing effects from the module
clamps. The module frame is not to be modified under any circumstances. When
choosing this type of clamp-mounting method, please be sure to use at least
four clamps on each module, two clamps should be attached on each long sides
of the module. Depending on the local wind and snow loads, if excessive
pressure load is expected, additional clamps or support would be required to
ensure the module can bear the load. The applied torque value should be big
enough to fix the modules steadily (Please consult with the clamp or support’s
supplier for the specific torque value). Please find detailed mounting
information in the below illustration, the mounting place distance is
suggested bigger than J and less than K,as shown below.
Figure 4:The mounting method of clamps for Dual glass modules with frame
Module type
| Dimensions (mm)
---|---
Maximum designed mechanical load : 3600Pa (positive ) &
1600Pa (negative)
Frame| *AB| J| K
Group 1*| 40| 1984998 & 1984*992
20091008 & 20231018
| 350| 480
Group 2 & Group 7| 40| 2000992| 280| 480
20311008 & 20541018| 350| 480
Group 3| 35| 1674998 & 1686*1008
16991018 & 1656992
| 280| 420
Group 4 & Group 8| 35| 1698998 & 1680992
17041008 & 17271018
| 280| 420
Group 5| 40 & 35| 1974998| 280| 480
Group 6| 40 & 35| 1664998| 280| 420
Group 19 & Group 20| ****
30
| 17011122 & 17171132
17191134 & 16691122
16851132 & 16781134
| A/4±50
A=module length
| A/4±50
A=module length
Group 21 & Group
22
| ****
30
| 18841122 & 19011132
19041134 & 18681134
18651132 & 18481122
| A/4±50
A=module
| A/4±50
A=module
length | length | |||
---|---|---|---|---|
Group 23 & Group 24 | **** |
30
| 20271122 & 20461132
20491134 & 20891134
20861132 & 20671122
| A/4±50
A=module length
| A/4±50
A=module length
Group 25 & Group 26| ****
30
| ****
22741134 & 22781134 & 2230*1134
| A/4±50
A=module length
| A/4±50
A=module length
Group 27
| ****
30
| ****
23851122 & 23931130
24081132 & 24111134
| A/4±50
A=module length
| A/4±50
A=module length
Group 28
| ****
30&35
| ****
2465*1134
| A/4±50
A=module length
| A/4±50
A=module length
Table 7:Mechanical dimensions when modules installed with clamps fitting ethod
Note
-
All installation methods herein are only for reference, and Jinko solar will not provide related mounting components, the system installer or trained professional personnel must be responsible for the PV system’s design, installation, and mechanical load calculation and security of the system.
-
Before installation, the following items should be addressed:
a) Visually check the module for any damage. Clean the module if any dirt or residue remains from shipping.
b) Check if module serial number stickers match. -
Jinko modules are designed to meet a maximum positive (or downward) pressure of 3600Pa(Only refer to the mentioned module type in this manual) and negative (or upward)pressure of 1600Pa. This design load was then tested with a safety factor of 1.5 times. So Jinko modules are tested under a maximum downward pressure of 5400Pa and upward pressure of 2400Pa.When mounting modules in snow-prone or high-wind environments, special care should be taken to mount the modules in a manner that provides sufficient design strength while meeting local code requirements.
-
When installing the Dual glass modules at a certain angle, please installed the modules in front of the sun. But the back which the surface mounting the junction box is not allowed to exposed to the sun.
Fixation with clamps at long sides of frames (Long sides with C, short
sides without C)
When installing modules using clamps on the long side of the frame, the
mounting place distance of middle of clamp is suggested bigger than J and less
than K. the length of clamp is 40mm. The applicable product types and
installation locations are shown in figure 4 and table 8, the following types
have the same section design.
Module type
| Dimensions (mm)
---|---
Maximum designed mechanical load : 3600Pa (positive )
& 1600Pa (negative)
Frame| A*B| J| K
Group 2 & Group 7*| 30| 20311008| 400| 500
Group 4 & Group 8| 30| 17041008| 400| 500
Group 9| 30| 21941008| 400| 500
Group 10| 30| 18681004| 400| 500
Group 11| 30| 21941034 & 22051032| 410| 520
Group 12| 30| 18681034 & 18781032| 400| 500
Group 13| 30| 22231025 & 22551032| 450| 550
Group 14| 30| 18891025| 400| 500
Group 15*| 30| 20901039 & 2090*1038
2096*1039
| 1/4L±50| 1/4L±50
Group 16| 30| 17501039 & 17501038| 1/4L±50| 1/4L±50
Group 17| 30| 20181008| 400| 500
Group 18| 35| 16921008| 400| 500
Group 25 & Group
26
| ****
30
| 2274×1134 & 22781134 & 22301134| ****
1/4L±50
| ****
1/4L±50
Group 28| 30&35| 2465×1134| 1/4L±50| 1/4L±50
Table8: Mechanical dimensions when modules installed at long side Clamp fitting method
Mounting with Bolts(NEXTracker four mounting holes)
Module type
| ****
Frame
| ****
*AB ( mm )**
| Maximum designed mechanical load and Method of installation
( 400mm )
---|---|---|---
JKMxxxM-72HL4-BDVP| 30| 2274×1134 & 22781134| +1600/-1600
JKMxxxM-7RL3-BDVP| 30| 22051032| +1400/-1400
JKMxxxN-78HL4-BDV| 30&35| 2465×1134| +1600/-1600*
Table9: Mechanical dimensions for bolt fitting method (NEXTracker)
Note: The installation method of bolt fitting (NEXTracker) is based on
the experimental results in Jinko. The design of the NexTracker tracking
bracket, the selection of accessories and the installation of modules should
be completed by a professional system installer, which can refer to Jinko’s
mechanical load.
The load described in this manual is the design load. When calculating the
maximum test load, 1.5 times of safety factor should be considered.
If the design load is greater than 1067Pa (1600Pa test load), consult the
support supplier.
- For details, consult with component suppliers and support suppliers.
Wiring and connection
- Before this procedure, please read the operation instructions of the PV system carefully. Make wiring by Multi-connecting cables between the PV modules in series or parallel connection, which is determined by user’s configuration requirement for system power, current and voltage.
- PV module connected in series should have similar current. Modules must not be connected together to create a voltage higher than the permitted system voltage(1500VDC). The maximum number of modules in series depends on system design, the type of inverter used and environmental conditions.
- The maximum fuse rating value in an array string can be found on the product label or in the product datasheet. The fuse rating value is also corresponding to the maximum reverse current that a module can withstand. Thus based on the maximum series fuse rating of module and local electrical installation criteria, make sure the modules strings in parallel for connection need to be assembled with appropriate string fuse for circuit protection.
- Open the combiner box of the control system and connect the conductor from the PV arrays to the combiner box in accordance with the the design and local codes and standards. The cross-sectional area and cable connector capacity must satisfy the maximum short-circuit of the PV system (for a single component, we recommended that the cross-sectional area of cables be 4mm2 and the rated current of connectors be more than 10A), otherwise cables and connectors will become overheating for large current. Please pay attention to the temperature limit of cables is 85℃.
- Follow the requirements of applicable local and national electrical codes.
- These modules contain factory installed bypass diode .if these modules are incorrectly connected to each other, the bypass diodes, cable or junction box maybe damaged.
- If modules are connected in series, the total voltage is equal to the sum of individual voltages. The recommended as below,
System voltage≥NVoc[1+TCVoc (Tmin-25)] Where
N module numbers in series
Voc Open circuit voltage (refer to product label or data sheet)
TCVoc Temperature coefficient of open circuit voltage (refer to product label or data sheet) Tmin Minimum ambient temperature
Maintenance and care
It is required to perform regular inspection and maintenance of the modules, especially during the warranty period. To ensure optimum module performance, Jinko recommends the following maintenance measures:
Visual Inspection
Inspect the modules visually to find if there are any visual defects, If there
are, the following items should be evaluated:
- If modules are observed having slight cell color differences at different angles, this is a normal phenomenon of modules with anti-reflection coating technology.
- Whether the glass is broken;
- No sharp objects are in contact with the PV module surfaces
- PV modules are not shaded by unwanted obstacles and; or foreign material
- Corrosion along the cells’ bus-bar. The corrosion is caused by moisture intrusion thought the module rear cover. Check the rear cover for damage.
- Check whether the rear cover is burn out.
- Check if screws and mounting brackets are tight, adjust and tighten as necessary.
Cleaning
- A build up of dust or dirt on the module(s) front face will result in a decreased energy output. Clean the panel(s) preferably once per annum if possible (depend on site conditions) using a soft cloth dry or damp, as necessary. Water with high mineral content may leave deposits on the glass surface and is not recommended. It is recommended to use neutral water to clean the glass to avoid strong acid and alkali, so as not to cause damage to the glass coating layer.
- Never use abrasive material under any circumstances.
- In order to reduce the potential for electrical and thermal shock, Jinko recommends cleaning PV modules during early morning or late afternoon hours when solar radiation is low and the modules are cooler, especially in regions with hotter temperatures.
- Never attempt to clean a PV module with broken glass or other signs of exposed wiring, as this presents a shock hazard.
- Never use chemicals when cleaning modules as this may affect the module warranty and energy output.
Inspection of Connector and Cable
It’s recommended to implement the following preventive maintenance every 6
months:
- Check the sealing gels of the junction box for any damage.
- Examine the PV module(s) for signs of deterioration. Check all wiring for possible rodent damage, weathering and that all connections are tight and corrosion free. Check electrical leakage to ground. The Dual glass modules of the non-metallic frame should not earthed.
Electrical specification
The module electrical rating are measured under Standard Test Conditions, which are 1000W/m2, irradiance with AM 1.5 spectrum and 25 deg (77°F) ambient temperature. The module might produce more or less voltage or current than rating value in uncertainty condition. Accordingly, the values of ISC and VOC marked on this module should be multiplied by a factor of 1.25 when determining component voltage ratings, conductor current ratings, fuse sizes, and size of controls connected to the PV output.
Disclaimer of Liability
Because the use of the manual and the conditions or methods of installation,
operation, use and maintenance of photovoltaic (PV) product are beyond Jinko’s
control, Jinko does not accept any legal responsibility and expressly
disclaims liability for any person and property damage arising from the
failure to follow the installation, operation, use, maintenance provided in
the manual,and for any disputes caused by no-quality reasons.
Intellectual Property Right: No responsibility is assumed by Jinko for any
infringement of intellectual property or other rights of third parties, which
may result from use of the PV product. No license is granted by implication or
otherwise under any intellectual property rights or related use authorization.
Jinko reserve the right to change the manual, the PV produce, the
specifications or product information. Any information may be changed due to
business needs, technical level or other objective environment, which is not
representative of the negation for the original information. The information
in this manual is based on Jinko’s knowledge and experience and is believed to
be reliable, but such information and suggestions (without limitations), which
is not the only and proprietary approach, do not constitute security and
quality assurance, expresses or implied.
Appendix: Applicable Products
This document is applicable to the series of solar modules as listed below: (1) Dual glass without frame series products:
Dual glass with frame series products
Notes:
- PP: the eagle series module
- DV: photovoltaic Module- Dual glass with 1500V
- JKMS: the smart series module
- J: customized product for Japanese market
- BDV: the bifacial N type series module
- BDVP: the bifacial P type series module
- H:Half-cut series module
- F: Normal Dual+frame series module
- MBB: Nine busbar series module
- RL3:163.75 large cell TR series module
- HL3:163.75 large cell half-cut series module
- HLM:166 large cell TR series module
- L4: 182 large cell series module
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>