Jinko Solar JKS-B5150-BI Energy Storage Installation Guide
- June 12, 2024
- Jinko Solar
Table of Contents
- Installation Environment
- Installation Tools
- Check
- Floor Installation with Base
- Wall-Mounted Installation Process
- Installation Environment
- Wire Connection
- Terminal Connection
- Battery System Switch Operation
- Key Operation
- Service and Contact
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Jinko Solar JKS-B5150-BI Energy Storage Installation Guide
Installation Environment
Installation Tools
Check
Check Packing List
-
KS-B5150-BI
-
Wall hangers ×1
-
Parallel communication line ×1 Ground wire ×1
-
Quick installation manual ×1
Operation manual ×1
Warranty card ×1
Certification ×1
-
Positive parallel power line ×1
Negative parallel power line ×1 -
M6 Explosive screw ×2
M6 Flange nut ×1
M4×10 Combination screw ×2
Check Accessories
-
A) JKS-B5150-BI
-
B) Cable to PCS
-
C) Parallel Cable
-
D) Base
Installation Method | Compound Mode |
---|---|
Standard wall-mounted installation | A+B |
Standard floor installation | A+B+D |
Wall-mounted battery system stacked in two line | A*B+C |
Floor installation battery system stacked in two line | A*B+C+D2 |
System Size
Floor Installation with Base
Installation Location Requirements
- If more than 4 batteries are used, base mounting is recommended.
- For floor installation with base, the maximum stack number of the battery is ten. But if the battery number is greater than six, we recommend stacking two stacks.
Installation Procedure
Note: The safety part needs to be installed at the top battery, however,
once the number of the battery pack is higher than 7, one more safety part
should be installed in the middle battery which is shown the last step.
‘Avoid drillng holes in the water pipes and cables buried in the wall
Wall-Mounted Installation Process
Installation Location Requirements
Note: The number of wall-mount instaliations should not exceed four Please make sure that the weight capacity of wall should exceed 150kg,
Installation Procedure
- Adjustthe screw to ensure the battery in horizontal position
Note: Avoid drillng holes n the water pipes and cables buried in he wall
Installation Environment
Note: Buid sun& rain shade to avoid direct ‘exposure to sunlightand rain
Wire Connection
Connection End Face Introduction
1 | PCS CAN communication | 7 | Positive terminal |
---|---|---|---|
2 | LINK-IN CAN communication | 8 | USB interface |
3 | LINK-OUT CAN communication | 9 | LED indicator |
4 | Safety vent | 10 | Power button |
5 | Negative terminal | 11 | Circuit breaker |
6 | GND terminal |
Diagram of Wiring Connection
Note: The swichconnect PCS to JKS-B5150-8I, we recommend the use of molded case cicut breaker with rated working voltage greater than 80V and rated working current greater than 125A.
Terminal Connection
Power Terminal
Press the position indicated in the figure above before disconnecting the power termina.
Communication Terminal
Battery System Switch Operation
Power ON Battery System
Tum the circuit breaker to the “ON” position. Press the power button for 3
seconds to turn on the battery. The battery LED indicatorlights p to indicate
that the battery has been tumed on.
Power OFF Batery System
“Tum the dircuit breaker to the “OFF” position. Press the power button to tum
off the battery. ‘The battery LED indicator s of, and the battery has been
tumed off
Key Operation
Power Button
Situation| Touch| Definition|
---|---|---|---
System off| Press(<2S)| No reaction
Press(≥2S)| Power on
System on| Press once| Shut down
Note: When multiple battery modules are used in parallel connection, you only need to press one key of any module to start the system, and aiso press one key to shutdown the batery system. ALMIRUN light tums green when powered on
Service and Contact
Jinko Solar Co., Ltd
No.1, Jinko Road, Shangrao Economic Development Zone Shangrao City, Jiangxi
Province, 334100, P.R. China
W: www.jinkosolar.com
BESS_AU@Jinkosolar.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>