EV WEST Duosida 32A J1772 Charge Port Installation Guide
- June 12, 2024
- EV WEST
Table of Contents
EV WEST Duosida 32A J1772 Charge Port
PURPOSE
To have a standard wiring procedure for the J1772 charge port.
AFFECTED PRODUCTS
DUOSIDA DSS-EV-32S-V3 Other J1772 charge ports similar.
RECOMMENDED TOOLS
PARTS LIST
PROCEDURE
- Strip wires
- Fold these 3 wires in half
- Insert wires into pins. They should push in by hand but be very tight. Weep hole faces up.
- Feed about 1 foot of solder until it starts to come out the weep hole, then remove heat!
- Check that solder does not interfere with pin fit
- Add shrink tube as shown
- Exploded view of connector for reference
- Insert pins from the back; then O-ring and pin retainer as shown.
- Install retainer screw
- Feed wires through seal and install
- Feed wires through seal retainer
- Back view, install seal retainer screws
- Install 1/2” shrink tube
- Install rear cover
- Install 3/8” ID vinyl tube
- Measure enough adhesive lined 3/4” shrink tube to exit rear cover. Heat the shrink tube, not the vinyl tube.
- Install rear cover and tighten gland nut
The information contained in this bulletin is subject to change. The information is deemed reliable, but not guaranteed. Due to the many configurations of electric vehicles, your device may have different conditions including being the wrong device for the application. For the latest updates, visit evwest.com. If you are uncertain about this procedure and purchased your device from EV West, contact support@evwest.com. Otherwise, contact your retailer or the manufacturer via their website.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>