CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door Instruction Manual

June 12, 2024
CRAFT MAIN

DOUBLE ROLLER
SHOWER & TUB DOORCRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub
Door

LGDR6063-CL-SV Double Roller Shower and Tub Door

COPY THE MODEL NUMBER FOR YOUR RECORDS HERE #
READ THE INSTRUCTIONS CAREFULLY
Familiarize yourself with all the parts as shown in the exploded view. The exploded view will also provide a helpful reference when relating to the location of the various parts and how they are mounted.
Please visit us on YouTube and view our shower door installation videos.
One may be available for your installation. www.youtube.com/c/CRAFTANDMAIN
Toll Free Customer Assistance
Monday-Friday, 7:30 a.m. To 5:00 p.m. CST
1-888-620-3667 US Customers
1-888-256-7551 Canada Customers

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
Fig1

PARTS LIST

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door - PARTS
LIST

WARNING: Safety glasses should always be worn when working with tempered glass.

RECOMMENDED TOOLS

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
TOOLS

CHOOSE WHETHER YOU ARE INSTALLING LEFT OR RIGHT SHOWER DOOR
Determine which assembly configuration you need to follow based on the location of the shower head as viewed from the outside of the shower. Left hand shower head must use Left Hand Assembly and right hand shower head must use Right Hand Assembly to insure a water tight finished installation.
IMPORTANT NOTE: PROPER INSTALLATION REQUIRES A MINIMUM 2¾” WIDE FLAT FRONT LEDGE

INSTALLATION PROCEDURE /STEP 1

INSTALLATION MEASUREMENT

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY

INSTALLATION PROCEDURE / STEP 2

  1. Install door guide (19) at the middle of tray.
  2. Position door guide as shown in the drawings and mark holes making certain it is positioned straight and square.
  3. Drill hole with 1/8″ (3mm) drill bit.
  4. Fix door guide (19) on tray with 1 1/4″ flat head screw (8).
    Note: Shower or tub threshold needs to have a flat surface of 2 3/4.

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY1

INSTALLATION PROCEDURE / STEP 3

  1. Outside distance between rail wall bracket assembly (7) and door guide(19) should be 1″.

  2. Remove top plates from both rail wall bracket assemblies (7).

  3. Measure straight up the wall to a point 3 ½” less than the overall height of the enclosure (Distance C in the table below) and mark it.

  4.  Position the rail wall bracket (7) so that the front bottom corner of the bracket is at the point shown in the drawing below. (3 ½” below overall height and 7/8″ behind the front edge of the door guide).
    Make certain the bracket is level and square before tracing the bracket and marking the screw holes.

  5. Drill hole with 1/4″ drill bit.

  6. Glue a little silicone into the hole, then insert wall anchor (6).

  7. Fix rail wall bracket against the wall with flat head screw 4x 1 1/4″(8).
    HINT: Before proceeding to Step 4, to ease the installation process, it is recommended that you set the inner glass panel against the back wall of the shower. Be sure to first put down a towel or piece of cardboard as a cushion to protect the glass and your shower floor from possible damage and to position the glass so that the H2OFF® protectant is on the side of the glass that is against the back wall.

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY2

INSTALLATION PROCEDURE / STEP 4

  1. Depending on your overall opening, you may not have to cut your top rail.
    Use the table below to determine your situation and cut the rail as shown in the diagram if necessary.

  2. Insert top rail into brackets with the slot to the inside of the shower and use a level to ensure top rail is level, adjusting the brackets if necessary. Adjust the top rail so that the gap at both ends are approximately the same then slide the bracket top plates back into position.

  3. Use the allen keys provided to tighten 2 top and 1 bottom set screws on each end of brackets to firmly anchor the top rail in place. Use caution not to over-tighten while insuring the top rail does not move.

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY3

INSTALLATION PROCEDURE / STEP 5

  1. Install threshold gasket (17) on the bottom of inner door panel (3).
  2. Trim water-retaining gasket (18) down 4 ¾” from the top as shown in the diagram below.
  3. Install water-retaining gasket (18) on inner glass.

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY4

INSTALLATION PROCEDURE / STEP 6

  1. Use the enclosed spanner to disassemble both double rollers (10) and then slide the rollers into the slot in the back of the top rail (9).

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY5

INSTALLATION PROCEDURE / STEP 7

  1. While tilting inner glass door panel (3) back into the shower slightly, insert it into the inner slot of the bottom panel guide (19).
  2. Insert the hexagonal nuts into the holes in the top of the inner glass panel (3), line them up with the threaded rod in the double rollers and (using the spanner provided) secure in place. It is strongly recommended that a second person assist with this step.

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY6

INSTALLATION PROCEDURE / STEP 8

  1. Adjust the rollers so that the panel meets the wall evenly from top to bottom.
  2. Attach 180° magnet seal (2) to inner door (3) magnetic seal using the magnetic attraction (if they repel, flip 180° magnet seal (2) upside down) and slide on the aluminum wall channel (1) temporarily.
  3. Slide the panel and magnetic wall seal assembly against the wall and mark the position.
  4. Disengage the aluminum wall channel (1), place it in position on the wall and mark the hole locations.
  5. Drill holes with ¼” (6 mm) drill bit.
  6. Glue a little silicone into the hole, then insert wall anchor.
  7. Attach the aluminum wall channel (1) to the wall with 1 ¼” pan head screws (4)

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY7

INSTALLATION PROCEDURE / STEP 9

  1. Install roller (11) on outer door (13), then tighten with spanner.
  2. Install threshold gasket (17) at the bottom of outer door (13).
  3. Cut 4 ¾” (120 mm) notch in top of water retaining gasket (18) as shown in drawing #3.
  4. Install water-retaining gasket (18) on outer glass (13).

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY8

INSTALLATION PROCEDURE / STEP 10
Set outer door (13) on top rail taking care to slide the panel bottom into the outer channel of the bottom panel guide (19).

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY9

INSTALLATION PROCEDURE / STEP 11

  1. Use a level on the top of outer door (13) to ensure it is level and then install anti-jumper (12).
  2. Install towel bars (5) on inner and outer door panels.

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY10

INSTALLATION PROCEDURE / STEP 12

  1. Adjust the rollers so that the panel meets the wall evenly from top to bottom.
  2. Attach 180° magnet seal (2) to outer door (13) magnetic seal using the magnetic attraction (if they repel, flip 180° magnet seal (2) upside down) and slide on the aluminum wall channel (1) temporarily.
  3. Slide the panel and magnetic wall seal assembly against the wall and mark the position.
  4. Disengage the aluminum wall channel (1), place it in position on the wall and mark the hole locations.
  5. Drill holes with ¼” (6 mm) drill bit.
  6. Glue a little silicone into the hole, then insert wall anchor.
  7. Attach the aluminum wall channel (1) to the wall with 1 1/4 pan head screw (4).

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY11

INSTALLATION PROCEDURE / STEP 13

  1. Measure distance from wall on each side to main body of the panel guide. Deduct ½” from this dimension and cut threshold (16) to size. Repeat this process for the other side.
  2. Install threshold (16) and threshold cover (15).
  3. Mark the hole locations for threshold cover mounting screws.
  4. Drill holes with 1/8″(3 mm) drill bit.
  5. Attach threshold covers with 1 ¼” flat head screws (8).

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY12

INSTALLATION PROCEDURE / STEP 14
Caulk the entire outside edge where the aluminum wall channels (1), threshold (16) and panel guide (19) meet the walls and threshold and then keep the entire area dry for a minimum of 24 hours while the caulk cures.

CRAFT MAIN LGDR6063-CL-SV Double Roller Shower and Tub Door -
ASSEMBLY13

ATTENTION CONSUMER:
IMPORTANT SHOWER ENCLOSURE
WARRANTY INFORMATION
PLEASE DO NOT DISCARD
Thank you for your purchase of a shower door
from FGI Industries, Ltd.
In order to be eligible for product warranty, please register
your door on our website within two (2) weeks of installation.
Go to:
https://craftandmain.com/warranty/ and follow the instructions.
For any questions or comments about your new shower door,
please contact our Customer Service at:
US CUSTOMERS:
1-888-620-3667
CustomerService.US@FGI-Industries.com
6241 Northwind Parkway
Hobart, IN USA 46342
CANADA CUSTOMERS:
1-888-256-7551
customerservice.cdn@FGI-Industries.com
5970 Che worth Way, Unit B
Mississauga, Ontario, Canada L5R 4G5
© 2022 FGI Industries, Ltd. | CRAFT + MAIN™, LAGOON™, and logo designs are trademarks or registered trademarks of FGI Industries, Ltd.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals