REY RASIRLBVER.2 Large Brackets Motorized Instruction Manual

June 12, 2024
REY

REY RASIRLBVER.2 Large Brackets Motorized Instruction Manual

Large Brackets Motorized

INSTALLATION INSTRUCTIONS
REY LARGE
BRACKETS
MOTORIZED

REYshades.com
[email protected]
951.245.5077

If your Motorized roller shade requires power, check the motor power and wiring requirements before you begin installation of your motorized roller shade. Once power is run to the motor, make sure power is turned off before you begin installation. Some motors are powered by internal Lithium-Ion batteries and do not need an external power source.

Before mounting any brackets to a surface make sure proper backing is in place to mount to. Roller shades should never be mounted to drywall without a proper backing.

The tape around the shade should not be removed until the shade is fully installed.

Hardware and Tools

REY LARGE BRACKET DISASSEMBLY

Disassembly

INSIDE OR OUTSIDE APPLICATION

First, measure and mark the ordered width of the shade inside or outside the window casement.
(Inside or outside applications will be determined by ordered mounting type).
(A minimum 3 1/2” vertical surface is required to mount the brackets).

Applications

MOUNTING LOCATION

Place your first bracket in its mounting location and mark the screw holes. Place your second bracket in its mounting location and repeat the process.

Mounting Locations

SCREW INSTALLATION

Next, pre-drill your screw holes using a 1/8” drill bit. Install the brackets with the provided screws using the 1/4” hex head driver.

Screw Installation

ALIGNMENT

Check to make sure your brackets are level and aligned.

Alignment

NOTE:

If your roller shade motor requires a cable for power be sure to allow extra slack to connect the cable to the motor head. If your roller shade motor is battery powered, be sure your antenna is exposed for better reception.

Wiring

ALTERNATE: Somfy RS485 (SDN) application wiring

Alternate Wiring

MOTOR & SHADE INSTALLATION

Insert the motor head into the motor side bracket tab. While holding the shade in place, press the pin end of the idle side. *Slide the Idle Bushing (B.) idle side of the shade into the bracket (C.). Make sure the Idle Bushing is secured before releasing the idle end of the shade.

Motor and Shade Installation

Motor and Shade Installation Continued

MOTOR RETAINER

Once the shade is mounted, before you install the back and front bracket covers, lock the motor retianer in the upward position.

Motor Retainer

PROGRAMMING

Remove the tape around the shade and begin programming. (Programming is based on the motor type). After programming has been completed lower the shade to it’s lower limit. Begin step 8.

*BACK BRACKET COVERS

Install the back bracket covers by aligning forward and inserting the covers into place. After installing the back cover, raise the shade to it’s upper limit. Begin step 9. Note: the covers are magnetic and will not require any additional tools.

Back Bracket Cover

FRONT BRACKET COVERS

Once the motor has been programmed and tested, raise the roller shade to its top limit. Install the front bracket covers by aligning and slipping the covers into place. Note: the covers are magnetic and do not need additional tools.

Front Bracket Covers

TESTING

Raise and lower the shade for final testing. You have now completed the installation.

Testing

© Copyright Rey & Roll-A-Shade ® Inc. All Rights Reserved.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

REY User Manuals

Related Manuals