VEVOR 1107 Pipe Jack Stand with V Head Instruction Manual
- June 12, 2024
- VEVOR
Table of Contents
VEVOR 1107 Pipe Jack Stand with V Head Instruction
VEVOR Pipe Stand
The VEVOR Pipe Stand is a tool designed to support pipes for a variety of uses. It is important to read through the owner’s manual carefully before using the product to ensure you understand how to use it safely and effectively.
Product Information
The VEVOR Pipe Stand comes in various models that differ in capacity, weight capacity, and overall height. The table below provides detailed product information for each model:
Part Number | Pipe Capacity (In.) | Max Weight Capacity | Overall Height (In.) |
---|---|---|---|
1107 | 1/8 to 12 | 2500 lbs | 28 to 52 |
1107A2-BALL | 1/8 to 12 | 1300 lbs | 28 to 52 |
1107A4-BALL | 1/8 to 12 | 1500 lbs | 28 to 52 |
1107B | 1/8 to 12 | 2500 lbs | 24 to 42 |
1107B2-BALL | 1/8 to 12 | 1300 lbs | 24 to 42 |
1107B4-BALL | 1/8 to 12 | 1500 lbs | 24 to 42 |
1107C | 1/8 to 12 | 2500 lbs | 20 to 37 |
1107C2-BALL | 1/8 to 12 | 1300 lbs | 20 to 37 |
1107C4-BALL | 1/8 to 12 | 1500 lbs | 20 to 37 |
1107S | 1/8 to 12 | 2500 lbs | 28 to 52 |
1107S2-BALL | 1/8 to 12 | 1300 lbs | 28 to 52 |
1107S4-BALL | 1/8 to 12 | 1500 lbs | 28 to 52 |
1109 | 1/8 to 12 | 2500 lbs | 32 to 55 |
1106 | 1/8 to 12 | 3000 lbs | 28 to 52 |
1108 | 1/8 to 24 | 300 lbs | 32 to 45 |
It is important to note that you should not exceed the maximum capacity of the product.
Product Usage Instructions
To use the VEVOR Pipe Stand, follow these steps:
- Make sure that all equipment is inspected and set up accordingly.
- Make sure that the ground below the pipe stand is clear, stable, and level.
- The legs of the pipe stand should be fully open and the feet placed squarely on the floor.
- If the stand is equipped with rollers, ensure the rollers are properly adjusted for the pipe size.
- Make sure you can always see the screw through the observation holes.
- Do not exceed the maximum line of the inner tube.
- Tighten the safety nut for added security.
It is important to carefully inspect the stand prior to each use for proper assembly (such as the hand screw), wear, damage, or other issues that may affect safe usage. If any problems are found, discontinue use until the stand is repaired. Keep the stand clean and all moving parts lightly lubricated to aid in operation. Additionally, it is crucial to use appropriate safety equipment for the intended job such as eye protection, hearing protection, feet protection, dusk masks, face shields, etc to reduce the risk of injuries. By following these instructions and product information, you can safely and effectively use the VEVOR Pipe Stand for your pipe support needs.
Operating Instructions and Parts
Please read and save these instructions. Read through this owner’s manual
carefully before using product. Protect yourself and others by observing all
safety information, warnings, and cautions. Failure to comply with
instructions could result in personal injury and/or damage to product or
property. Please retain instructions for future reference.
Description
Designed to support pipes for a variety of uses. Do not exceed the maximum
capacity of the product.
Inspection/Maintenance
Carefully inspect the stand prior to each use for proper assembly (such as the hand screw), wear, damage, or other issues that may affect safe usage. If any problems are found, discontinue use until the stand is repaired. Keep the stand clean and all moving parts lightly lubricated to aid in operation. Operating Instructions and Parts Manual
General Safety Information
- WARNING Read the warnings and instructions for all equipment being used before operating this tool to reduce the risk of serious personal injury.
- WARNING Failure to properly support the pipe may result in tipping of the stand, dropping of the pipe, or serious injuries.
- WARNING Use the appropriate safety equipment for the intended job such as eye protection,hearing protection, feet protection, dusk masks, face shields, etc to reduce the risk of injuries.
Installation and Operation
- Make sure that all equipment is inspected and set up accordingly.
- Make sure that the ground below the pipe stand is clear, stable, and level.
- The legs of the pipe stand should be fully open and the feet placed squarely on the floor.
- if the stand is equipped with rollers, ensure the rollers are properly adjusted for the pipe size
- Fasteners on the pipe stand should be evaluated and ensure that they are secured
- To adjust the height. grip head assembly, loosen the hand screw, and raise thelock ring to disengage the elevator tube. Move the head assembly to the desiredheight. Next, lower the lock ring until it engages the elevator tube, and securely tighten the hand screw. Do not raise the elevator tube past the hand screwor past the unit specifications. The jack screw can be used for fine adjustments to height. Do so by holding the head of the assembly station and carefully turning the jack screw handle to the desired height. Do not force the jack screw handle, as it maycause the screw to come loose from the stand.
- Position the stand(s) to properly support the pipe. The pipe should be supported in at least two places at all times. The number and placement of stands depend on the size, length, and weight of the pipe length.
- Carefully place the pipe on the stands. Make sure the pipe is properly centered on the stands to reduce the risk of tipping. Always stay clear of the supported load.
Attention:
Documents / Resources
|
VEVOR 1107 Pipe Jack Stand with V
Head
[pdf] Instruction Manual
GJDJLGQZJ00000001V0, 1107 Pipe Jack Stand with V Head, 1107, Pipe Jack Stand
with V Head
---|---
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>