The Professional Wall Kit is a comprehensive kit for waterproofing walls in wet areas such as bathrooms and shower rooms. It includes a 12mm Tile Backer Board, 12mm Waterproof FloorBoards, Pro-SEAL Pre-MIX, Washers & Screws, Paintbrush, Waterproofing Tape, and Protective Gloves.

Important Information

Please read the instructions thoroughly before starting the installation. The Wallboards can either be used in place of plasterboard or can be fixed on top of existing plasterboard or a solid wall. If you fix the panels on top of the existing plasterboard, you will need to consider the edge detail as the Wallboards will be approximately 12mm deep when fitted. It is essential that all wallboard joints are along timber stud work. If you do not have suitably positioned stud work, you should add extra timbers before starting installation. When drilling or fixing into walls or floors, it is essential that you check for pipes and wires before commencing.

Site Preparation

When you are ready to start, make sure that you have the right tools to hand and that the installation area is clean and dry.

Product Tools Required (not supplied)

  • Hardpoint saw

Product Usage Instructions

  1. Measure the wall area and plan the wallboard layout on a sheet of paper. The wallboards are 1210mm x 900mm and can easily be cut with a hard point saw if required. Note: Ensure stud centers are no more than 600mm apart.
  2. Place the first wallboard into position and fix it to the timber stud work using screws and washers. Fix the board at least every 300mm along the vertical edges and every 200mm along the horizontal edges.
  3. Place the second wallboard into position and fix it as described in Step 2. Repeat this step for the remaining boards.
  4. The remaining fixings and screws should be equally spaced along the horizontal edges.
  5. Fit the shower tray or bath in accordance with the manufacturers’ instructions.
  6. All wallboard-to-wallboard joints need to be waterproofed. Measure the horizontal and vertical joints and cut the standard tape to the correct lengths. The tape can overlap, so it must be cut to the full height and full width of the area. Normally, three pieces of approximately 2500mm are required for the vertical lengths and one piece of approximately 1800mm for the horizontal joint, but this could vary depending on the installation.
  7. If you have a shower tray, put on the gloves that are supplied and wear eye and breathing protection. Paint the tape sealer along all joints approximately 60mm wide on either side of the joint line. Place the corner into position and press back into the tape sealer. Paint the edges of the corner where the tape will overlap.
  8. Place the tape over all the remaining joints and press firmly into the tape sealer. Leave to dry for approximately 3 to 5 hours after which the wall is ready for tiling.

Professional Wall Kit – 12mm Tile Backer Board

  • 51000032380
  • 51000323405

Typical Parts Supplied (quantity varies)

furniture123-51000032380-Professional-Tanking-Kit-6-12mm-Tile-Backer-Board-
fig-1

Tools required (not supplied)

  • Tape Measure
  • Pencil
  • Paper
  • Hard Point Saw
  • Screw Driver PZ2
  • Safety Goggles
  • Breathing Mask
  • Eye Protection
  • Scissors
  • Bucket

Product Important Information

PLEASE READ THESE INSTRUCTIONS THOROUGHLY BEFORE STARTING INSTALLATION.

  • Please note that Wallboards can either be used in place of plasterboard or can be fixed on top of existing plasterboard or solid wall. If you fix the panels on top of the existing you will need to consider the edge detail as the Wallboards will be approximately 12mm deep when fitted.
  • Check the pack and make sure that you have all the parts listed.
  • When you are ready to start make sure that you have the right tools to hand and that the installation area is clean and dry.
  • When drilling or fixing into walls or floors it is essential that you check for pipes and wires before commencing.

Site Preparation

  • It is essential that all wallboard joints are along timber stud work. If you do not have suitably positioned stud work you should add extra timbers before starting installation.

INSTALLATION INSTRUCTIONS

Step 1

  • Measure the wall area and plan the wallboard layout on a sheet of paper. The wallboards are 1210mm x 900mm and can easily be cut with a hard point saw if required.

Note: Ensure stud centers are no more than 600mm apart.

Step 2

  • Before proceeding, check thoroughly for pipes and wires in the wall. Working from the edge of the existing plasterboard, place the first wallboard into position. Place the countersunk hole of a fixing washer over the vertical join between the plasterboard and the wallboard.
  • The first washer should be just above the level that the shower tray or bath will finish. Using a fixing screw, tighten firmly into place. Place another fixing approximately 400mm above the first and then a further fixing approximately 400mm above that.

Step 3

  • Place the second wallboard into position and fix it as described in Step 2. Repeat this step for the remaining boards.

Step 4

  • The remaining fixings and screws should be equally spaced along the horizontal edges.

Step 5

  • Fit the shower tray or bath in accordance with the manufacturers’ instructions.

Step 6

  • All wallboard-to-wallboard joints need to be waterproofed.
  • (Please note: wallboard to plasterboard joints do not need to be waterproofed because plasterboard itself is not waterproof). Measure the horizontal and vertical joints and cut the standard tape to the correct lengths. The tape can overlap so it must be cut tothe full height and full width of the area. Normally 3 pieces of approx 2500mm are required for the vertical lengths and 1 piece of approx 1800mm for the horizontal joint but this could vary depending on the installation.

Step 7a

  • (Only if you have a shower tray) Before proceeding you must put on the gloves that are supplied and we also recommend that you wear eye and breathing protection.
  • Paint the tape sealer along all joints approximately 60mm wide on either side of the joint line. Place the corner into position and press back into the tape sealer. Paint the edges of the corner where the tape will overlap.

Step 7b

  • (Only if you have a bath or nonshower tray) Before proceeding you must put on the gloves that are supplied and we also recommend that you wear eye and breathing protection. Make sure that the bath or shower tray is completely clean and free from grease or dust. Remove the backing from the adhesive corner and place the corner into position. Press the glued edge firmly to create a good seal
  • Cut the adhesive tape into 2 pieces that will overlap the corner by approx 25mm. Remove the backing from the adhesive tape and place into position along the edge of the bath or shower tray. Press the glued edge firmly to create a good seal. Paint the tape sealer onto the wall behind the adhesive corner and press the corner into the tape sealer. Paint the edges of the adhesive corner where the tape will overlap. Paint the wall behind the adhesive tape. Press the adhesive tape into the tape sealer. Paint the tape sealer along all the wallboard to wallboard joints approximately 60mm wide on either side of the joint line.

furniture123-51000032380-Professional-Tanking-Kit-6-12mm-Tile-Backer-Board-
fig-7

Step 8

  • Place the tape over all the remaining joints and press firmly into the tape sealer.
  • Leave to dry for approximately 3 to 5 hours after which the wall is ready for tiling.