1. TURBO ENERGY HYBRID INVERTER Configuration
Step 1: Connect to the INVERTER Wi-Fi

To be able to upload the SunBox to the cloud and be able to see the monitoring of the system, it is essential to connect the equipment to the internet. To do this, the following steps must be followed:

Step 0: Locate the serial number of the logger

At the bottom of the inverter there is a label with a QR code, the serial number of your logger and the password to access the Wi-Fi of the logger

The logger creates a Wi-Fi network whose name is “AP_” followed by the serial number of the logger.

Step 1: Connect to the Wi-Fi network

With an electronic device that has Wi-Fi (PC, Tablet, Smartphone …) the connection with the WiFi of the recorder is established:

Open the wireless network connection of your PC, tablet, or smartphone

Click View Available Wireless Networks

Select the corresponding one with the device which you want to connect with (identified by “AP_” and the serial number of logger)

Enter the key that appears on the logger along with the serial number.

Step 2: Connect to the web portal

Once connected to the Wi-Fi network with your PC, tablet, or smartphone you must access the web portal of the registrar.

To do this, a web browser on the PC, tablet or smartphone that has been connected to the wiFi of the logger

Type in the address bar of the web browser the text “10.10.100.254”

A login pop-up window will appear asking for username and password. The default user is “admin” and the password is “admin” and pulsar the button “Login”.

Once you have accessed the web portal of the registrar you will be able to see the “Status” page with general information of the registrar.

TURBO ENERGY Hybrid Series Solar Inverter A6

Click on the “Wizard” link under the “Status” link to run the connection wizard from the logger to the wi-fi of the installation (the Wi-Fi of your house or your plant).

Step3: Configure the
LOGGER’s access to the wi-fi of the plant

Step 3.1: Select the wi-fi of the plant

When we run the connection wizard, we see the list of Wi-Fi networks to which the registrar has access. Among them must appear the Wi-Fi of our plant. We must select that Wi-Fi and press the “Next” button at the bottom of the screen:

TURBO ENERGY Hybrid Series Solar Inverter A7

Step 3.2: Enter the password of the Wi-Fi of the plant: in the field “Password” enter the password of the Wi-Fi of your plant and press the button “Next·”

TURBO ENERGY Hybrid Series Solar Inverter A8

Step 3.3: In this step
it is NOT necessary to select any option and then press the “Next” button. Used to configure the security of the connection a la Wi-Fi. Selecting Hide AP, the Wi-Fi network will appear as hidden.

TURBO ENERGY Hybrid Series Solar Inverter A9

Step 3.4 If the adjustment has been made successfully press the “OK” button to restart the connection.

If the restart occurs successfully a message will appear indicating that it has been done successfully, if it does not appear then refresh the browser page:

Step 4: Check the connection of the REGISTRAR to the wi-Fi of the plant

After restarting the web page log back in to the “Status” page and check the status of the registrar’s network connection:

TURBO ENERGY Hybrid Series Solar Inverter A12

Once we have verified that the registrar is connected to the Wi-Fi of the plant and (which must have internet access) it is possible to add the plant to the cloud platform.

Paso 3: Inverter settings

When programming the inverter, you can choose between several configuration options:

  1. Selling first: the priority for excess energy is to deliver it to the grid.
  2. Zero Export to Load: The output power feeds the Load
  3. Zero export to CT: Production feeds the sum of loads (Network and Load).

Select one of these three modes and enable or disable the option to pour power into the grid.

In addition, power can be prioritized to the charge or to the battery.

The recommended working mode is: Zero Export to CT / Solar Sell activated / Load First. In this way the energy generated will feed the load, the excess amount will go to the battery and finally, the excess energy will be poured into the grid.

– Selling first: Deliver to the network first
– Zero Export to Load: Output power adjusts to BackUp load
– Zero Export to CT: The system adjusts the production to the sum of the loads
– Solar Sell: Sell surplus energy
– Max Sell Power: maximum output power
– Zero-export Power: Grid output power
– Batt First: The energy from the plates is used to charge the batteries first.
– Load First: The energy from the plates is used for charging and then for the batteries.
– Grid Peak Shaving: Power limit to be taken from the grid

The inverter also incorporates the possibility of using the Grid Peak Shaving function, which allows to reduce the maximum power consumed from the network. With this function the user can have less power contract in the hours of the day that are more expensive and the surplus power that is consumed, will be supplied by the battery.

There are three different modes:

– GM (General Mode): Mode to supply the energy consumed with Battery and plates
– BU (BackUP): No battery discharge mode
– CH (Charge): Battery charging mode

1. Configuration of Lithium Series 48V 5.1kWh Slim

Each module has 4 DIP (Dual Inline Package) switches that will be configured differently depending on the number of batteries to be connected
They are configured according to the binary code, starting with the master.

Address Dial switch position Explain
#1  #2 #3
1 ON OFF
2 OFF ON
3 ON ON
4 OFF OFF
5 ON OFF
6 OFF ON
7 ON ON
8 OFF OFF
9 ON OFF
10 OFF ON
11 ON ON
12 OFF OFF
13 ON OFF
14 OFF ON
15 ON ON
2. Wiring configuration

The cable needed to make the connection is the RJ45. It is a special cable that is composed of 8 smaller cables each with a different color configuration.

It’s needed to use a standard pin-to-pin cable with RJ45 connector

TURBO ENERGY Hybrid Series Solar Inverter B2

  1. Inverter
  2. Battery

For the connection between the inverter and battery, the RJ45 cable will be connected to the CAN-1 port in the battery

In the inverter, the RJ45 cable will be connected to the BMS CAN port

1. Communication Verification

To verify that the communication has been done correctly you can check by pressing the battery icon on the main screen and pressing on the Li-BMS button. If similar or non-zero data appears, it means that the communication between battery and inverter is correct.
TURBO ENERGY Hybrid Series Solar Inverter B4

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

TURBO ENERGY User Manuals

Related Manuals