SCALETRON 4042ECO Spill Containment Scale Base with Bladder User Manual

June 4, 2024
SCALETRON

SCALETRON logo Model 4042ECO™ Spill Containment Scale Base with bladder
[PN: 4042ECO- ( enter size of base ) – (enter net capacity in LB or KG)]:
User Manual

The Model 4042ECO™ Spill Containment Scale is assembled and calibrated to the digital controller at the factory, then partially disassembled for shipment. Depending on the size of the containment basin, sometimes they are shipped directly from the manufacturer and will arrive separately from the scale base and controller.

**Set up and Wiring:

**

Step 1: Remove all parts from the box and inspect for damage – bent metal, broken wires, cracks in the indicator, etc. Any shipping damage must be reported to the carrier!
Parts Bag Contains: (Tie wrapped to scale base)

    1. leveling foot w/ jam nut

Step 2: Place the scale base on a solid, dry, and even surface. Clear the area of all debris where the scale base will be set up.
STEP 4: Position pivot plates on the floor so the base is in the desired position. The floor must be close to level, but if the base is out of level from side to side, shim pivot plates to level scale from side to side and prepare anchor bolts. Mark and drill (3) holes per pivot plate into concrete and anchor with lag bolts.
STEP 5: This leveling adjustment is critical to the accurate operation of the scale. Place level on top of scale base from front to back and adjust leveling foot to level scale base. Tighten the nut on the load cell leveling foot stud so that the foot does not twist off of level. The nut should be a little more than hand tightening.
Step 6: Make sure the anti-tipping side bolts are not touching the floor, but are capable of stopping the base from tipping.
Step 7: Place the Containment basin under the scale base making sure it isn’t rubbing on the scale base.
Step 8: If conduit is to be used, we recommend at least 2 feet of the horizontally mounted, FLEXIBLE conduit so as to not interfere with the free movement of the base for accurate measurement. Feed the wire up through the conduit, and apply a fitting.
Step 9: Connect the wires into the connector using the following code:

Wire Color Code:

Green = + Signal
White = – Signal
Black = – Supply Voltage
Red = + Supply Voltage
Violet = Shield

See controller manual for rest of set-up and operating instructions.

Replacement Parts:

PN: SB/SS- (enter load cell value) –LC : replacement load cell & shim
PN: 4042ECOLF: leveling foot & jam nut for Model 4042ECOc scale base
PN: 4042-CB26: 26” Replacement Spill Containment Basin (11 gals)
PN: 4042-CB26x52: 26”x52” Replacement Spill Containment Basin (22 gals)

Technical Assistance: (800)257-5911 or (215)766-2670
Email: [email protected]
©2021 Scaletron Industries Ltd., Plumsteadville, PA Scaletron,
PRINTED IN THE U.S.A. January 2021.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

SCALETRON User Manuals

Related Manuals