Flamco Flexfiller Direct G4 Compact Pumpless Top-Up Pressurisation Unit User Guide
- June 10, 2024
- Flamco
Table of Contents
Flamco Flexfiller Direct G4 Compact Pumpless Top-Up Pressurisation Unit
User Guide
Maintenance and service
Depressurise the installation and disconnect it from the power supply.
Safety requirements
The product must be earthed at all times. Installation and maintenance must be
carried out by qualified personnel.
Removal
There is danger of scalding! Hot water can flow out of the system. Remove the
product
-
Remove the contents and recycle the box
-
Use the wall-bracket to locate the position for the holes
-
Hang the unit on the wall bracket and fix by fastening the screw.
-
Connect (left-right) mains-water inlet, system outlet and drain outlet
Always connect the drain-pipe
-
Alarm installation?
-
Open both isolation valves
-
Connect the power cord and the unit automatically switches on.
-
Hold the ON/OFF-button for 30 seconds
-
Hold the ON/OFF-button for 30 seconds
-
Set the user Language.
-
Set the Date & Time.
-
Read manual, T&C’s and register warranty
-
Set the safety valve setting
-
Set the pressure setpoint.
-
Set the size of your connected expansion vessel.
-
Confirm expansion vessel precharge
-
Scroll through summary and confirm
-
Commisioning is done, initial fill has started.
For dismanteling the unit, see manual.
Conditional warranty
Please register your product, activate you warranty and register with your local water authority on our website at: https://flamcogroup.com/warranty- registration
This product is covered by a conditional warranty
It is a requirement of your local water authority to disclose the installation location.
To make this easy, you must register your product, activate your warranty, and
register with your local water authority on our website at:
https://flamcogroup.com/warranty-registration
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>