Overview

Overview

  1. Front panel
  2. Touch button
  3. LCD screen
  4. LED indicator
  5. Mounting bracket
  6. Heat sink
  7. DC switch
  8. PV terminal
  9. Battery terminal
  10. COM port
  11. USB port
  12. Vent valve
  13. AC terminal

Note:

  1. This document is for quick installation guidance only, please refer to User Manual for more details.
  2. Growatt shall not be liable for any damage resulting from unproper installation.

Installation

System overview
System overview

Installation requirements
Installation requirements

Wall mounting
Wall mounting

Communication module installation
Communication module installation

Electrical connection

Please prepare the cable before connecting as follows.

No. Cable name Type Recommend model
1 Protective grounding wire Single    multi-coreyellow-green   wire 6mm²-

10mm²
2| AC output wire| Two or three polychromaticmulti-core copper wires| 6mm²- 10mm²
3| PV input wire| PV wire| 4mm²-6mm²
4| Battery input wire| Battery wire| 4mm²-6mm²
5| communication wire| RS485| /

Note:

  1. Please make sure all switches are in “OFF” position before wiring. For personal safety, please do not operate with electricity.
  2. If the diameter of the cable does not match the terminal, or the cable is aluminum wire, please contact our after-sales personnel

Grounding
Grounding

AC output connection
AC output connection

Plug in PVBAT terminal
Plug in PVBAT terminal
Plug in PVBAT terminal

Note:

  1. Before installing the PV terminal, please double-check that the PV input voltage and current do not exceed the MPPT limits.
  2. When installing the PV terminal, pay attention to the difference between the positive and negative poles and the one-toone correspondence between the terminals and the machine.
  3. There is a “click” sound when the terminal is connected,please gently pulling the PV wire to make sure there is no loose or pulling off.

**Communication cable installation
Communication cable installation

**

When connecting the communication line,port 15 and 16 are not connected,as for the other function,please refer to the above table according to the customer needs.

Connecting Meter

The following table describes how we can connect EASTRON meter (TPM-E)to inverter:

Connecting Meter| Meter Pin NO.| Description| Meter Connection
---|---|---|---
1/2/3/4| L1/L2/L3/N-in| Grid L1/L2/L3/N
5/6/7/8| L1/L2/L3/ N-out| AC connector & Load L1/L2/L3/N
A| RS485A| COM Port Pin 5 RS485A3
B| RS485B| COM Port Pin 6 RS485B3

Post-installation check

No. Acceptance criteria No. Acceptance criteria
1 The inverter is installed correctly, firmly and reliably. 6 The RS485

communication cable is installed correctly and firmly.
2| The ground wire connected well and the connection is firmand reliable.| 7| The cable tie port is trimmed well without leaving sharpcorners,meets the requirements of the user.
3| All switches are in the OFF state.| 8| All exposed terminals are well protected and there are no vacantports.
4| All wiring is correct and securely connected.| 9| Pay attention to clean up all construction residues.
5| The wiring of the cable is reasonable, meets the requirements, and there is no phenomenon of broken skin.| |

Power on and off steps

Note:

Before turning the inverter on, please make sure the PV input voltage and current are within the MPPT limits. Follow the steps below to turn the inverter on:

  1. Switch on the build-in DC isolator at the bottom of the inverter.
  2. Switch on the PV Array and DC isolator next to your inverter, if you can not find this switch, skip this step.
  3. Switch on the Solar AC isolator if the inverter is more than 3 meters away from your switchboard.
  4. Switch on the solar supply main switch in the switch board. To shut down your system, follow this guide in reverse order.

Status of PV grid inverter

Customer can read more information by push button.

Mark Describe Explain
Touch mark Single touch Switch the display interface or the current number

plus 1
Double touch| Enter the setting state or confirm
Triple touch| Return to the previous display interface
Long press for 5s| The current data returns to the default value
| Inverter status indicator| Red| Fault
Green| Normal operation
Red light flashing| Warning
It can display the basic information of inverter through LCD display screen (PV/AC voltage,PV power,AC current,total power,generating capacity, etc.).

Export limitation setting

Export limitation setting

If the local grid company requires to limit the output power from your inverter systems, we introduce the concept of Export Limit Rate. The ratio of your system output power divided by the rated power of the inverter is called Export Limited Rate .For example, if the local grid company only accepts 4kW from your 5kW system, then the Export Limit Rate of 5kW inverter should be 80%.

Service and contact

Shenzhen Growatt New Energy Co., Ltd
4-13/F,Building A,Sino-German(Europe) Industrial Park, Hangcheng Ave, Bao’an District, Shenzhen, China

T  +86 0755 2747 1942
Wwww.ginverter.com
E service@ginverter.com

Apps

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals