GOODWE Lynx C Series Rechargeable Li-ion Battery System User Manual
- June 9, 2024
- GOODWE
Table of Contents
- Lynx C Series Rechargeable Li-ion Battery System
- Rechargeable Li-ion Battery System
- Safety Precautions
- Product Introduction
- Product Overview
- Product Usage Instructions
- About This Manual
- Safety Precaution
- Introduction
- Storage and Package
- Battery Cabinet and Accessories
- System Installation
- Electrical Connection
- System Operation
- Maintenance
- Parameters
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Lynx C Series Rechargeable Li-ion Battery System
Rechargeable Li-ion Battery System
About This Manual
This is the user manual for the GoodWe Lynx C Series Rechargeable Li-ion Battery System. This manual applies to all Lynx C Series models and was last updated on October 15, 2022. This manual cannot replace product labels or safety precautions in the user manual unless otherwise specified.
Safety Precautions
The Lynx C Series has general safety precautions that must be followed, such as not exposing the system to water or other liquids, ensuring proper installation and maintenance, and avoiding any damage to the battery. The EU Declaration of Conformity is also included in this section. If an emergency occurs, the battery must be disconnected and the fire department should be contacted.
Product Introduction
The Lynx C Series is a rechargeable Li-ion battery system designed for use with solar energy systems. The battery is capable of storing excess energy generated by the solar panels during the day and releasing it during peak usage times. This results in reduced dependence on the grid and lower energy bills.
Product Overview
The Lynx C Series includes a battery module, management unit, and power conversion system. It has a modular design, allowing users to add or remove battery modules to fit their energy storage needs. The system is compatible with most solar inverters on the market.
Product Usage Instructions
Before using the Lynx C Series, read the user manual carefully and follow all safety precautions. Install the battery system in a safe and dry location, away from any heat sources or flammable materials. The battery system must be installed by a qualified technician who is familiar with electrical and battery systems.
During normal operation, the battery system will charge during the day when solar energy is available and discharge during peak usage times in the evening. The battery system can be monitored using the GoodWe monitoring system or other monitoring software. Any abnormal behavior or malfunctions should be reported to a qualified technician immediately.
When performing maintenance on the battery system, follow all safety precautions and disconnect the battery from the solar inverter and electrical system. Only use authorized replacement parts and accessories, and do not attempt to repair or modify the battery system yourself.
Copyright ©GoodWe Technologies Co., Ltd., 2022. All rights reserved
No part of this manual can be reproduced or transmitted to the public platform
in any form or by any means without the prior written authorization of GoodWe
Technologies Co., Ltd.
Trademarks
GOODWE and other GOODWE trademarks are trademarks of GoodWe Technologies Co.,
Ltd. All other trademarks or registered trademarks mentioned in this manual
are owned by GoodWe Technologies Co.,Ltd.
NOTICE
The information in this user manual is subject to change due to product
updates or other rea-sons. This guide cannot replace the product labels or the
safety precautions in the user manual unless otherwise specified. All
descriptions in the manual are for guidance only.
About This Manual
This manual describes the product information, installation, electrical connection, commissioning, troubleshooting and maintenance of Lynx C Series Rechargeable Li-ion Battery System for Commercials and Industries (hereinafter referred to as the Lynx C BS in short). Read through this manual before installing and operating the product. All the installers and users have to be familiar with the product features, functions, and safety precautions. This manual is subject to update without notice. For more product details and latest documents, visit https://en.goodwe.com.
Applicable Model
This manual applies to the listed Lynx C BS below:
Model | Usable Energy (kWh) |
---|---|
LX C101-10 | 101.38 |
LX C120-10 | 119.81 |
LX C138-10 | 138.24 |
LX C156-10 | 156.67 |
Target Audience
This manual applies to trained and knowledgeable technical professionals. The
technical personnel has to be familiar with the product, local standards, and
electric systems.
Symbol Definition
Different levels of warning messages in this manual are defined as follows:
-
DANGER
Indicates a high-level hazard that, if not avoided, will result in death or serious injury. -
Indicates a medium-level hazard that, if not avoided, could result in death or serious injury.
-
CAUTION
Indicates a low-level hazard that, if not avoided, could result in minor or moderate injury. -
NOTICE
Highlight and supplement the texts. Or some skills and methods to solve product-related problems to save time.
Updates
The latest document contains all the updates made in earlier issues.
V1.0 2022-10-15
First Issue
Safety Precaution
NOTICE
The Lynx C BS are designed and tested strictly in compliance with related
safety rules. Read and follow all the safety instructions and cautions before
any operations. Improper operation might cause personal injury or property
damage as the products are electrical equipment.
General Safety
NOTICE
- The information in this user manual is subject to change due to product updates or other reasons. This guide cannot replace the product labels or the safety precautions in the user manual unless otherwise specified. All descriptions here are for guidance only.
- Read through this document before installation to learn about the product and the precautions.
- All operations should be performed by trained and knowledgeable technicians who are familiar with local standards and safety regulations.
- Use insulating tools and wear personal protective equipment (PPE) when operating the Lynx C BS products to ensure personal safety.
- Strictly follow the installation, operation, and configuration instructions in this manual. The manufacturer shall not be liable for equipment damage or personal injury if you do not follow the instructions. For more warranty details, visit: https://en.goodwe.com/warranty.
Installation Precaution
WARNING
- Please keep Power Off before any operations to avoid danger. Strictly follow all safety precautions outlined in this manual and safety labels on the equipment.
- The Lynx C BS is a high voltage system. Do not touch or operate it. Keep away from it. Only professionals are allowed!
- Please use appropriate tools and take protective measures when installing and maintaining heavy equipment. Improper operations will cause personal injuries.
- Do not use the battery module or Power Control Unit (hereinafter referred to as PCU in short) if it is defective, broken, or damaged.
- Do not disassemble, modify, or replace any part of the battery module or PCU without official authorization from the manufacturer.
- Pay attention to the negative and positive during installation to avoid reverse polarity connection. Otherwise the short circuit may cause personal injuries and damage to the equipment.
DANGER
- All labels and warning marks should be visible after the installation. Do not scrawl, damage, or cover any label on the device.
- Warning labels on the BS are as follows.
Symbol Description
Symbol | Description | Symbol | Description |
---|---|---|---|
**** | Potential risks exist. Wear proper personnel protectives before any | ||
operations. | ![GOODWE-SEMS-Portal-Web-11](https://manuals.plus/wp- | ||
content/uploads/2023/03/GOODWE-SEMS-Portal-Web-11.png) | Install the equipment |
away from fire sources.
| HIGH VOLTAGE HAZARD. High voltage exists during the equipment’s running.
Ensure the equipment is power off before any operations.| | Keep the equipment
away from children.
| Operate the
equipment properly to avoid explosion.| | No extinguishing with water.
| The equipment
contains corrosive electrolytes. In case of a leak in the equipment, avoid
contact the leaked liquid or gas.| ****
| Do not dispose of the equipment with household garbage at its end of life.
Dispose it according to local laws and regulations. Or send it to the
manufacturer.
| Batteries contain
flammable materials. Beware of fire.| | Put the battery in the right place
and recycle it in compliance with local environmental regulations.
| Read through the
user manual before any operations.| | Pay attention to safety protection
during installation, operation and maintenance.
****| No stepping.| | Grounding. To
indicate PE cable connection position.
| CE Marking.| | TUV
Marking.
| **** RCM Marking.|
–| –
Maintenance Precaution
WARNING
- Do not pull or plug the terminals and connecting cables during the running of the BS. Otherwise it may cause dangers to the safety.
- Contact After-sales Service if the battery module shall be replaced or added.
- Power off the BS the moment there is abnormality happening during the running. Contact the related personnel as soon as possible.
- Do not hit, pull, drag, or step on the equipment, or stab into the cover of the equipment with sharp objects, or put unrelated items into any part of the battery cabinet.
Battery Safety
WARNING
- Do not charge the battery at lower temperature. Otherwise it may decrease the capacity of the BS.
- Do not dis-/charge the battery exceeding the nominal dis-/charge current.
- It is strictly forbidden to reverse the polarity connection. Otherwise the strong current or high temperature generated from the battery may cause personal injury or fire risk.
Emergency Measures
WARNING
Damaged battery modules may leak electrolyte. Do not contact the
electrolyte or volatile gas once there is leakage.
Please ask After-sales Service for help immediately.
Anyone contact the leakage accidentally has to do as the following:
-
Inhalation:
Evacuate from the contaminated area, and seek immediate medical assistance. -
Eye contact:
Rinse your eyes for at least 15 minutes with clean water and seek immediate medical assistance. -
Skin contact:
Thoroughly wash the touch area with soap and clean water, and seek immediate medical assistance. -
Ingestion :
Induce vomiting, and seek immediate medical assistance.
EU Declaration of Conformity
The Lynx C BS sold in the European market meets the following directives and
requirements:
- Electromagnetic compatibility Directive 2014/30/EU (EMC)
- Electrical Apparatus Low Voltage Directive 2014/35/EU (LVD)
- Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863 (RoHS)
- Waste Electrical and Electronic Equipment 2012/19/EU
- Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No 1907/2006 (REACH)
You can download the EU Declaration of Conformity on the official website: https://en.goodwe.com.
Introduction
Overview
- This manual is mainly about product introduction, application scenarios, installation, commissioning, maintaining and technical parameters of the Lynx C BS.
- The Lynx C BS is mainly composed of Lynx C series battery modules, PCU and battery cabinet.
- Below are the inverters applicable in the Lynx C BS:
Good We Inverter
Below are the configurations about different BS:
BS Model| PCU Quantity| Battery Cabinet Quantity|
Battery Module Quantity
---|---|---|---
LX C101-10| 1| 1| 11
LX C120-10| 1| 1| 13
LX C138-10| 1| 1| 15
LX C156-10| 1| 1| 17
Battery Cabinet
Model | Length (mm) | Width (mm) | Height (mm) |
---|---|---|---|
LX C101-10 | 1155 | 730 | 1650 |
LX C120-10
LX C138-10| 1155| 730| 2065
LX C156-10
PCU
No. | Silk Print | Parts | Description |
---|---|---|---|
1 | B+ | Battery positive terminal | To connect with the positive polarity of the |
battery module.
2| QF3| DC circuit breaker| Used when the BS is self-powered.
3| QF2| AC circuit breaker| Used when the BS requires external power supply.
4| QF1| Main circuit breaker| The main circuit breaker for the BS.
5| HRL| Indicator| To display the working status of BS.
6| B-| Battery negative terminal| To connect with the negative polarity of the
battery module.
7| P-| Power input/ output port (Negative)| To connect the
inverter negative power port.
8| BMS POW| AC power supply port| To connect the inverter AC output port.
9| P+| Power input/ output port (Positive)| To connect the inverter positive
power port.
10| COM| External COM port| To connect the inverter for communication.
11| BMU COM| Internal COM port| To connect the battery module for
communication.
Indicator
No. | Red | Green | Description |
---|---|---|---|
1 | – | ON | The BS is in operation. |
2 | SINGLE FLASH | The BS is in idle status. | |
3 | DOUBLE FLASHES | The BS is on standby. | |
4 | SINGLE FLASH | **** |
–
| Slight alarm
5| DOUBLE FLASHES| Medium alarm
6| ON| A fault has occurred.
Battery Module
No. | Parts | Description |
---|---|---|
1 | Connector for battery communication | To connect PCU or other battery |
modules for communication.
2| Battery positive polarity| –
3| Battery negative polarity| –
4| Battery hoisting hole| To hoist the battery modules into the cabinet.
5| Battery fixing hole| To fix the battery modules within the cabinet.
Nameplate
The nameplate is for reference only.
Storage and Package
Storage Environment
If the equipment is not to be installed or used immediately, please ensure that the storage environment meets the following requirements:
- Pack the equipment into a packing box and put some desiccant in the box before sealing.
- Put the equipment back in the packing box if it is not to be installed in 3 days after unpacking.
- If the battery modules are going to be kept for more than 30 days, adjust SOC to 40%-60%and dis-/charge them once every 3 months.
- Recommended storage temperature:
- 20℃~45℃ (less than one month) or 0℃~35℃ (less than a year).
- Recommended storage humidity: 0%~95%RH (no condensation). Do not install the battery if there is moisture or condensation.
- Place the equipment in a cool place, far away from the direct sunlight.
- Keep the equipment away from flammable, explosive, and corrosive matters.
- Keep the equipment away from the rain.
- Protect the BS from damage during transportation and storage.
- It is strictly forbidden to put the batteries into fire. Otherwise it might be exploded.
- It might cause a fire to the BS when the ambient temperature exceeds 150℃.
Packing List
- The packing of the BS is mainly composed of the packages of the battery modules and the battery cabinet.
- Check whether the packing is damaged and confirm the BS model before unpacking. Do not unpack the product if you find any damage or the model is not what you requested. Contact After-sales Service as soon as possible.
- Check whether the deliverables are intact and complete first after unpacking. Contact the After-sales Service as soon as possible for anything wrong.
No. | Model | Battery Module Quantity (Pieces) |
---|---|---|
1 | LX C101-10 | 11 |
2 | LX C120-10 | 13 |
3 | LX C138-10 | 15 |
4 | LX C156-10 | 17 |
Battery Cabinet and Accessories
-
Battery cabinet x 1*1
-
Battery power connecting bar A x 1
-
COM cable between PCU and battery x 1
-
Mounting hook x 4
-
AC connector x 1
-
Battery power connecting bar B x 1
-
COM cable between batteries x N
-
Sealing plate x N
-
COM connector x 1
-
Battery power connecting bar C x 1
-
M6 screw x N
-
NA
-
Power output connector x 1
-
Battery power connecting bar D x 1
-
M8 screw x N
-
NA
All the other accessories except the battery cabinet are put in the battery
cabinet.
The quantity of AC connectors depends on the specific BS configuration.
Accessories| LX C101-10| LX C120-10| LX
C138-10| LX C156-10
---|---|---|---|---
Battery power connecting bar (pieces)| 9| 11| 13| 15
Battery COM cable (pieces)| 10| 12| 14| 16
M6 screw (pieces)| 56| 56| 72| 72
M8 screw (pieces)| 24| 28| 32| 36
Sealing plate (pieces)| 2| 0| 2| 0
System Installation
Installation Environment
- Install the BS on a flat ground with sufficient bearing capacity. Increase the bearing capacity and flatness of the ground by laying the foundation, adding bearing plates, and so on.
- The BS shall be installed indoor.
- The optimal working temperature for the BS is 20~40℃.
- The working temperature for the BS shall not exceed 50℃.
- Install the equipment away from heat/cold source.
- Do not install the equipment in a place where the temperature changes extremely.
- Install the equipment away from strong interferences.
- Keep children away from the equipment.
- Do not install the equipment in places prone to accumulate water.
- Do not put flammable or explosive matters near the equipment.
- In the event of a fire, please make sure that the carbon dioxide extinguisher or Novac1230 or FM-200 is nearby. The fire cannot be put out by water or ABC dry powder extinguisher. Firefighters are required to wear full protective clothing and self-contained breathing apparatus.
Space Requirements
Angle Requirements
Moving the BS
CAUTION
Move the BS to the site before installation. Follow the instructions below to
avoid personal injury or equipment damage.
- Consider the weight of the equipment before moving it. Assign enough personnel to move the equipment to avoid personal injury.
- Keep the equipment in balance to avoid its falling down during moving.
Installing the BS
NOTICE
- Ensure that the ground is flat.
- Ensure that the battery cabinet is vertically standing on the ground without risk of inclination.
-
Step 1 Use the fork lift to move the battery cabinet to the installing place.
-
Step 2 Open the battery cabinet and take out the accessory package.
-
Step 3 Use the hook to move the battery module to the fork lift or elevating devices.
-
Step 4 Use the fork lift or the elevating devices to install each battery module into the battery cabinet from bottom to top. For LX C101-10 and LX C138-10, do not install any battery module on the top layer.
-
Step 5 Use M6 screws to fix the battery module and the sealing plate (the sealing plate is only used on the top layer for LX C101-10 and LX C138-10).
Electrical Connection
WARNING
- Ensure all switches of PCU and its upstream switches are disconnected before any electrical connections.
- Place the cables at least 30mm away from the heating components or heat sources, otherwise the insulation layer of the cables may be aging or broken due to high temperature.
- Tie the cables of the same type together, and place cables of different types at least 30mm apart. Do not place the cables entangled or crossed.
Connecting PE Cable
NOTICE
- Connect the PE cable first before electrical connection. Disconnect the PE cable at last during dismantling the equipment.
- The PE cable should be prepared by customers. The cross-sectional area of the PE cable conductor: 8mm2.
Connecting Battery Communication Cable
NOTICE
- There are two communication ports on PCU: one is to connect the internal battery; the other is to connect the external inverter.
- The communication cables and terminals are delivered with the product.
- Use the correct communication cables.
Connecting Inverter Communication Cable
NOTICE
- The communication cables are required when the BS is used together with the inverters.
- The communication terminals and cables of the BS are delivered with the product.
No. | Definition |
---|---|
3 | CANH |
4 | CANL |
7 | RS485A |
8 | RS485B |
Others | NA |
Connecting Power Connecting Bar
NOTICE
- Disconnect all switches of PCU before connecting the battery power connecting bar.
- Use the battery power connecting bar in the accessory list.
- There are varies of battery power connecting bars. Choose the proper one according to the actual connecting locations. The connecting way and torque are the same for different shapes of battery power connecting bars. Refer to the following steps for the connection.
- Use the correct battery power connecting bar.
Connecting Inverter Power Cable
NOTICE
- The cross-sectional area of the power cable is 35mm2 (AWG 2); its outer diameter is 11-13mm; the stripping length is 20±1mm and the crimping height is 9±0.2mm. Ensure the drawing force is more than 2500N after crimping.
- The power cable shall be normal 1000V PV cables.
- The orange power terminals are positive and the black power terminals are negative.
- Step 1 Strip the conductor from the cable.
- Step 2 Insert the cable into the power connector. Then use tools to crimp it.
- Step 3 Tighten the rear housing of the power connector.
- Step 4: Connect the power cable.
(Optional) Connecting Single Phase AC Power Cable
NOTICE
- The BS is able for DC self-powered, as well as Single Phase AC supplying externally. The single phase AC cable is used for external power supply. Choose whether to use it based on the actual demanding.
- For single-phase AC power, use UPS (Uninterruptible Power Supply).
- The input voltage scope for the single phase AC power is 100-240V; power: ≥ 60W and frequency: 50-60Hz.
- The single phase AC terminals and cables are delivered with the product.
System Operation
Check before Power ON
Check the following items before power on to avoid the battery system being damaged.
No. | Check Item |
---|---|
1 | The equipment is firmly installed in a clean place where is well-ventilated |
and easy to operate.
2| Ensure that PE, the battery high voltage copper bus, the inverter power
cable, the communication cable and single phase AC cable are connected
correctly and securely.
3| Cable ties are intact, routed properly and evenly.
Power ON
NOTICE
Turn on QF3 when PCU is self-powered; turn on QF2 when it is using external
single phase AC powering.
Power On
- Self-powered: 1 → 3
- External single phase AC powering: 1 → 2
Indicator
No. | Red | Green | Description |
---|---|---|---|
1 | – | ON | The BS is in operation. |
2 | SINGLE FLASH | The BS is in idle status. | |
3 | DOUBLE FLASHES | The BS is on standby. | |
4 | SINGLE FLASH | – | Slight alarm |
5 | DOUBLE FLASHES | Medium alarm | |
6 | ON | A fault has occurred. |
Parameter Setting
Select the battery model via PV Master after successfully connecting the BS
and the inverter. APP installation and connection
Set battery model via the PV Master App.
Click “GOODWE(HIGEE)” and then select the proper battery model matching with the communication method on “Select Battery Model” page of the PV Master App.
NOTICE
“Battery Selection Abnormal” will prompt when choosing a wrong battery
model. Please select the right battery model accordingly.
Power OFF
Follow the steps to power off the BS to avoid the system being damaged.
NOTICE
Ensure there is no load on the DC side of the inverter and the circuit
breaker between the BS and the inverter is disconnected before power off the
BS.
Power Off
- Self-powered: 1 → 3
- External single phase AC power supplying: 1 → 2
Maintenance
DANGER
Power off the Lynx C BS before operations and maintenance. Otherwise, the
equipment may be damaged or electric shocks may occur.
WARNING
- Contact After-sales Service for help if you find any problems that may influence the BS or the hybrid inverter. It is strictly forbidden to disassemble without permission.
- Contact After-sales Service for help if the copper conductor is exposed. Do not touch or disassemble privately because the high voltage danger exists.
- In case of other emergencies, contact After-sales Service as soon as possible. Follow the instructions to operate or wait for After-sales Service to help.
Item | Maintaining Period |
---|---|
Check whether the door is normal. | Once every 6 months |
Check whether the wiring of PCU and of the batteries are securely in the
battery cabinet.| Once every 6 months
Check whether there is an exposed cable. Replace the exposed cable or contact
After-sales Service for help.| Once every 6 months
Check whether there is debris accumulated around the battery cabinet to avoid
affecting the battery radiating.| Once every 6 months
Check whether there is liquid, pest or debris within the battery cabinet to
avoid an intrusion.| Once every 6 months
Parameters
Technical Data | LX C 101-10 | LX C120-10 |
---|---|---|
Usable Energy *(kWh) 1** | 101.38 | 119.81 |
Battery Module | LX C9.2-10: 38.4V 9.21kWh | |
Number of Modules | 11 | 13 |
Cell Type | LFP (LiFePO4) | |
Cell Configuration | 132S2P | 156S2P |
Nominal Voltage (V) | 422.4 | 499.2 |
Operating Voltage Range (V) | 369.6~468.6 | 436.8~553.8 |
Nominal Dis-/Charge Current (A) *2 | 100 | |
Nominal Power (kW) *2 | 42.24 | 49.92 |
Short-Circuit Current | 4.0kA | |
0.66ms@468.6V.dc | 4.1kA |
0.62ms@553.8V.dc
Operating Temperature (℃)| Charge: 0 ~ +45 / Discharge: -20 ~ +50
Relative Humidity(%)| 0~95%
Max. Operating Altitude (m)| 2000
Communication| CAN+RS485
Weight (Kg)| 1120| 1280
Dimensions (W×H×D) (mm)| 1155×1650×730
Ingress Protection Rating| IP21
Storage Temperature (℃)| 0~+35 (﹤ One Year); -20~0 or +35~+45 (﹤
Three Months)
Mounting Method| Grounded
Round-trip Efficiency *1| 96.0%
Cycle Life* 3| 4000
Standard and Certification| Safety| IEC62619, IEC62040,
IEC63056
EMC| IEC/EN61000-6-1/2/3/4
Transportation| UN38.3
1: Test conditions, 100% DOD, 0.2C charge & discharge at +25±2 °C for battery system at beginning life. System Usable Energy may vary with different Inverter.
2: Nominal Charge/Discharge and power derating will occur related to Temperature and SOC.
*3: Based on 2.5~3.65V voltage rang @25±2℃ of Cell under 0.5C/0.5C test condition and100%DOD 80% EOL.
Technical Data| LX C138-10| LX C156-10
---|---|---
Usable Energy *(kWh) 1| 138.24| 156.67
Battery Module| LX C9.2-10: 38.4V 9.21kWh
Number of Modules| 15| 17
Cell Type| LFP (LiFePO4)
Cell Configuration| 180S2P| 204S2P
Nominal Voltage (V)| 576| 652.8
Operating Voltage Range (V)| 504.0~639.0| 571.2~724.2
Nominal Dis-/Charge Current (A) *2| 100
Nominal Power (kW)* 2| 57.60| 65.28
Short-Circuit Current| 4.2kA
0.57ms@639V.dc| 4.3kA
0.53ms@724.2V.dc
Operating Temperature (℃)| Charge: 0 ~ +45 / Discharge: -20 ~ +50
Relative Humidity(%)| 0~95%
Max. Operating Altitude (m)| 2000
Communication| CAN+RS485
Weight (Kg)| 1480| 1650
Dimensions (W×H×D) (mm)| 1155×2065×730
Ingress Protection Rating| IP21
Storage Temperature (℃)| 0~+35 (﹤ One Year); -20~0 or +35~+45 (﹤
Three Months)
Mounting Method| Grounded
Round-trip Efficiency 1| 96.0%
Cycle Life 3| 4000
Standard and Certification| Safety| IEC62619, IEC62040,
IEC63056
EMC| IEC/EN61000-6-1/2/3/4
Transportation*| UN38.3
1: Test conditions, 100% DOD, 0.2C charge & discharge at +25±2 °C for battery system at beginning life. System Usable Energy may vary with different Inverter.
2: Nominal Charge/Discharge and power derating will occur related to Temperature and SOC.
3: Based on 2.5~3.65V voltage rang @25±2℃ of Cell under 0.5C/0.5C test condition and 100%DOD 80% EOL.
GoodWe Website
GoodWe Technologies Co., Ltd.
No. 90 Zijin Rd., New District, Suzhou, 215011, China
www.goodwe.com
service@goodwe.com
Local Contacts
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>