VICOUSTIC DC3 Multifuser Black Instruction Manual
- June 11, 2024
- VICOUSTIC
Table of Contents
Multiuser DC3
Installation Manual
DC3 Multiuser Black
MATERIAL NEEDED
This product can be installed on the wall with Vic Fix Mini and on the ceiling using Flexi Glue Ultra (not supplied).
Ways of using the gauge
Wall installation – One panel
After defining the place where you want to install the panels, start marking
the position of the Multifuser DC3 fixation clips.
This product can also be installed using Flexi Glue Ultra.
Wall installation – Installation up to three panels
Define the place where you want to install the panels and fix the First VicFix Mini. From there and with the help of the gauge provided, mark the positioning of the remaining fixation clips.
To install the last Multiuser DC3, use it to mark the inner side of the last
fixing clip.
Remove the last two panels again and use the gauge provided to ensure the
clips are aligned. Fix the last clip. You can use a bubble level to help in
this procedure.
Install the last two panels.
Wall Installation – Vertical Installation
Install the first panel according to step number 2.
Follow the steps described in the following diagrams.
Ceiling **Installation**
-
Apply three lines of glue on the back of the acoustic panel. Do not wait longer than 10 minutes after applying the glue to attach the panel to the wall.
-
Place the panel on the suitably chose position on the ceiling. Once in the desired place, press firmly against the wall for 15 seconds.
Cut the tip of the glue nozzle according to the diagram.
To ensure that you maximize the strength of the glue, don’t make any adjustments to the panel after bonding
Wall and ceiling surfaces should be examined prior to installation, ensuring they are clean, smooth, and dry. If you have unpainted gypsum board surfaces, these should be primed with a drywall primer (or another material manufactured especially for the purpose), to equalize the absorption between the gypsum board face paper, joint compound, and skin coating materials. You should then apply the paint, and allow air circulation in order to dry the paint within the time frame specified by the paint manufacturer. Please ensure the paint is dry before installing the acoustic panel. Make sure the room has all the necessary conditions to receive the acoustic panels. After you apply the glue on the back of each acoustic panel, please ensure you hold the acoustic panel against the wall the required time (mentioned above), and ensure it stays fixed in place. This method is also applicable to ceiling installations.
Main Office, R &D & Logistics
Avenida do Polo 3, Nº 159, Carvalho’s
4590-137 Paco’s de Ferreira, Portugal
Office
Rui Quinta do BOMA Retire Nº 16, Amaze 9
2820-690 Clarence da CA parica, Portugal
T (+351) 212 964 100
Info and Sales
E sales@vicoustic.com
www.vicoustic.com
© Vicoustic, 2021 | V3
No parts of this document might be copied and/or published without written
consent of Vicoustic.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>