Edge-corE AS7326-56X 56-Port 25G-100G Top-of-Rack Switch User Guide

June 9, 2024
Edge-core

Edge-corE AS7326-56X 56-Port 25G-100G Top-of-Rack Switch

Edge-corE-AS7326-56X 56-Port-25G-100G-Top-of-Rack-Switch-
PRODUCT

Package Contents

Edge-corE-AS7326-56X 56-Port-25G-100G-Top-of-Rack-Switch-
FIG-1

  1. 25G/100G Top-of-Rack switch AS7326-56X
  2. Rack Mounting Kit-2 front-post brackets, 2 rear-post brackets, 20 screws, and 2 ear-locking screws
  3. Power cord (included with AC PSUs only)
  4. DC power connector (lincluded with 48 VDC PSU only)
  5. Ground wire (included with DC PSUs only)
  6. Console cable-R-45 to DB-9
  7. Dust Cover Kit-8 for QSFP28 ports and 50 for SFP28 ports
  8. Documentation-Quick Start Guide (this document) and Safety and Regulatory Information

Warning: For a safe and reliable installation, use only the accessories and screws provided with the AS7326- 56X. Use of other accessories and screws could result in damage to the unit. Any damages incurred by using unapproved accessories are not covered by the warranty.

Caution: The device must be installed in a restricted- access location.

Caution: The switch includes plug-in power supply (PSU) and tan tray modules that are installed into its chassis. All installed modules must have a matching airtlow direction. That is, it the installed power modules have a tront-to-back (F2B) airtlow direction, all the installed fan tray modules must also have a F2B airflow direction.

Note: The switch has the Open Network Install Environment (ONIE) software installer pre-loaded on the switch, but no switch sotware image. Intormation about Compatible switch sottware can be tound at www.edge- core.com.

  1. Attach the Brackets

  2. Attach each of the front- and rear-post brackets to the switch using four of the included bracket screws.

  3. Use the screws and cage/clip nuts supplied with the rack to secure the switch in the rack.
    Caution : Installing the switch in a rack requires two people. One person should position the switch in the rack, while the other person secures it using the rack screws.

  4. Adjust Rear-Post Bracket Ears
    Lock the position of the rear-post bracket ears using the included position- locking screws. You can adjust the rear-post bracket ears to fit different rack depths from 56 cm to 75 cm.

  5. Ground the Switch

  6. Ensure the rack is properly grounded and in compliance with ETSI ETS 300 253. Verify that there is a good electrical connection to the grounding point on the rack (no paint or isolating surface treatment).

  7. Attach the grounding wire (#14 AWG) to the grounding point on the switch rear panel. Then connect the other end of the wire to rack ground.
    Caution : The earth connection must not be removed unless all supply connections have been disconnected.

  8. Connect Power

  9. Install one or two AC or DC PSUs in the switch. The switch supports up to two PSUs that must have the same matching airtlow direction as the installed fan trays.

  10. Connect an external AC or DC power source to the PSUs.

  11. Positronic PLA03F7O00/AA connector

  12. DC Return

  13. 36–72 VDC

  14. Ground
    Caution : Use a UL/IEC/EN 60950-1 certified power supply to connect to a DC conerter, and a#14 AWG (for 36 VDC to -72 VDC PSU) wire to connect to a DC PSU.

  15. Verify Switch Operation
    Verity basic switch operation by checking the system LEDs. When operating normally, the PSU1/PSU2 and Fan LEDs should all be on green.

  16. Perform Initial System Boot

  17. If the network operating system (NOS) installer is located on a network server, first connect the RJ-45 Management (Mgmt) port to the network using 100-ohm Category 5, 5e or better twisted- pair cable. (Not required if the NOS installer is located on attached storage.)

  18. Boot the switch. Wait for the ONIE software to locate and execute the NOS installer, and then wait for the installer to loadthe NOS software image. Subsequent switch boots will bypass ONIE and directly run the NOS sottware.
    Note : Refer to the network operating system (NOS) installer and NOS documentation tor details on sotware options and set up for ONIE.

  19. Connect Network Cables

  20. For the RJ-45 Management port, connect 100-ohm Category 5, 6e or better twisted-pair cable.

  21. Connect DAC cables to the SFP28/QSFP28 slots. Or first install SFP28/QSFP28 transceivers in the slots and then connect fiber optic cabling to the transceiver ports.

  22. As connections are made, check the port status LEDs to be sure the links are valid.

For the SFP28 ports:

  1. Green25 Gbps mode
  2. Yellow 10 Gbps mode

Each QSFP28 port has four LEDs that indicate valid links in the following modes:

  • 1 LED Green 100 Gbps mode
  • 1 LED Blue- 40 Gbps mode
  • 1-4 LEDs Yellow-25 Gbps breakout mode (four lanes)
  • 1-4 LEDs Purple 10 Gbps breakout mode (four lanes)

Hardware Specifications

Switch Chassis

  • Size (WxDxH) 438.4 x 536 x 43.5 mm (17.26 x 21.1 x 1.71 in.)
  • Weight 10 kg (22.05 lb), with two installed PSUs
  • F2B Operating : 0° C to 45° C (32° F to 113° F)
  • B2F Operating: 0° C to 40° C (32° F to 104° F)
  • Storage : -40° C to 70° C (-40° F to 158° F)
  • Temperature Humidity Operating: 5% to 95% (non-condensing)
  • Power Consumption 550 Watts maximum

AC PSU

  • Power Rating 100-240 VAC, 50-60 Hz, 650 Watts
  • AC Input 100-240 VAC, 50-60 Hz, 6 A maximum

48 VDC PSU

  • Power Rating 48 VDC, 650 Watts
  • DC Input -36 V- -72 V, 16 A maximum

Regulatory Compliances

  • Emissions
    • EN 55032:2015+AC:2016, Class A
    • EN 61000-3-2:2014, Class A
    • EN 61000-3-3:20133
    • FCC Class A
    • VCCI Class A
    • CCC GB 9254-2008, Class A
    • BSMI Class A, CNS 13438
  • Immunity
    • EN 55024:2010+A1:2015
    • IEC 61000-4-2/3/4/5/6/8/11
  • Safety
    • UL (CSA 22.2 No 60950-1 & UL60950-1)
    • CB (EC/EN60950-1)
    • CCC GB4943.1-2011
    • BSMI, CNS 14336-1
  • Taiwan RoHS CNS 15663

Documents / Resources

| Edge-corE AS7326-56X 56-Port 25G-100G Top-of-Rack Switch [pdf] User Guide
AS7326-56X 56-Port 25G-100G Top-of-Rack Switch, AS7326-56X, 56-Port 25G-100G Top-of-Rack Switch, 25G-100G Top-of-Rack Switch, Top-of-Rack Switch, Switch
---|---

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Edge-core User Manuals

Related Manuals