STUDER RCC 02 Remote Control User Guide

June 9, 2024
STUDER

STUDER RCC 02 Remote Control User Guide

Introduction

Congratulations!
You are about to install and use a high-end equipment that will play a central role in the energy management of your battery-based system. The bsp is a battery status processor for advanced monitoring of lead-acid batteries within an xtender system. This device has been designed, manufactured, assembled and tested in our factory in Switzerland. It has a 5-year warranty

General Information

Exclusion of liability
Studer disclaims all responsibility and liability for damage, costs or losses resulting from an installation that does not comply with the instructions, a faulty operation or inadequate maintenance. The use of studer equipment is in any case under the responsibility of the customer.

Read carefully the safety and operation instructions

Installation must be entrusted to qualified personnel

Check the user manual online

Need help?

Compatible with:

  • Battery inverter/charger

xtender

  • Solar charge controller


    vario

  • Advanced battery processor (lead-acid)

bsp

  • Communication with lithium BMS

xcom CAN

  • Remote monitoring (Portal & App)

xcom LAN/GSM

  • Communication bridges (openstuder)

xcom 232i/CAN/485i

Mounting and installation

Storage and content
Mounting and installation

Mounting place
The batteries should only be installed by qualified personnel.
Mounting place

Fixing and dimensions

rcc 02

Fixing and dimensions
Fixing and dimensions

Fixing and dimensions
rcc 03

Fixing and dimensions

Wiring

Wiring
Wiring

The device must be installed in accordance with local standards and regulations in  force.

Multi units and power up

Up to 3 remote controls (rcc or xcom) per system
Multi units and power up

Display

Display system

Display system

Configuring the rcc

rcc 02/03

Configurating parameters

Language
Time
Date
User level (Info only – 460081, Basic – 943274, Expert – 426468)
Datalogger
Save and restore files
Backlight
Extended and special functions

Configuring the rcc
Configuring the rcc

Configuring the rcc
Configuring the rcc

Technical data

Seetings

**Protection Class I

**

Datalogging: SD card, 1 minute resolution
Save and restore: Configuration and logfiles backup
Communication cable: 2m (included)
Operating temperature range: -20 … 55°C

Maintenance and recycling

Except for the periodic check of the connections (tightening, general condition), the rcc does not require any particular maintenance. To dispose of this product, please use the service for the collection of electrical waste and observe all obligations in force in the place of purchase.

  • Serial Number:
  • Installed by :
  • Date :
  • Signature :

Call our specialists +41 27 205 60 80
or visit studer-innotec.com/support
Studer Innotec SA
rue des Casernes 57
1950 Sion, Switzerland
info@studer-innotec.com

© All rights reserved
Studer Innnotec SA – V1.0

Symbols

STUDER Logo

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals