Wellis WU00034 Danube Swim Spa User Manual
- June 9, 2024
- Wellis
Table of Contents
Wellis WU00034 Danube Swim Spa
PARTS AND DESCRIPTIONS
Part No. | Item No. | Descriptions | Qty |
---|---|---|---|
1 | ACM0838 | UV-C set v2 | 2 |
2 | ACM0768 | K1001Controlpanel | 2 |
3 | ACM0769 | IN.STREAM-2 | 1 |
4 | ACM0849 | Subwoofer 288W | 1 |
5 | ACM0868 | IN.Touch – 2 Gecko Wifi | 2 |
6 | ACM0802 | Led control box | 2 |
7 | ACM0734 | Hydro pump 60 Hz 2200W | 2 |
8 | ACM0902 | Circulation pump WTC50M 0.33 LE 250W | 1 |
9 | ACM0854 | Control box IN.YE-3 | 1 |
ACM0926 | Heater 4KW | 2 | |
10 | ACM0956 | Control box IN.Yt-8 | 1 |
11 | ACM0834 | Circulation pump for Swim Spa PCF100 | 1 |
12 | ACM0955 | W-flow pump 2 spd. 3 LE | 3 |
13 | ACM0881 | IN.Grid for heat pump | 1 |
14 | AKU0084 | Water drain for jakuzzi | 1 |
Installation instruction
Residual-Current Device (RCD) having a rated operating residual-current not exceeding 30 mA is must
The stated dimensions are for reference only. The actual dimension may be different from the specified
- L: Drain diameter: 50 mm
- E: 3 m cable is required for the electrical connection through the spa skirt.
Attention
The hot tube will be installed only if the electrical contractor makes
declaration of the installation of Residual-Current Device and proper fuses
Initial installation
The installation or making any repair are allowed only for properly skilled
person.
Disconnecting device has to be installed when the spa is directly connected to
the electricity networks.
Site preparation
-
a. Indoor / Basement installation
If you place your spa indoors, be aware of some special requirements: Water may accumulate around the spa, so the flooring mate-rial must have a proper runoff to avoid accumulation of water. When building a new room for the spa, constructing a floor drain is required, or damages may occur due to overflow, overfilling, or technical failure. Our company does not take responsibility for any damage in absence of floor drainage.Humidity will naturally increase in the room where the spa is located and the evaporated water condenses. For this reason ensure that the area has proper ventilation. We recommend installing a dehumidifier in the room. -
b. Outdoor and patio installation
A solid horizontal foundation is necessary for installation of the spa. We advise using a reinforced concrete foundation at least 10-15cm thick. Ensure that your deck or foundation will support your spa. You must know the maximal load capacity of the foundation. Consult a qualified building contractor or structural engineer. To find out the weight of your spa, its contents and occupants please refer to the spa specification chart. This weight must not exceed the structure’s rated capacity per square meter, otherwise serious structural damages could result. If you install the spa outdoors, we recommend a reinforced hori-zontal concrete pad at least 10-15cm thick
Install floor drains around your spa to lead water away even in heavy rain. When constructing the water drain it is advised to form a 10-15cm deep sloping ditch around the spa which directs water to the drain. Water from the drain must be directed to the canal or a drainage with enough capacity.
Warning: Do not expose the spa to direct sunlight (not even empty) without proper coverage. The insulated spa cover preserves the water temperature and provides protection from sunlight and rain. When exposed to sunshine for a longer period it may damage the surface of the spa and the spa equipment. Acrylic rapidly absorbs heat from sun rays, thus reaches a very high surface temperature which may damage the spa. In case of sealed design, if the spa was placed between glass structures, prevent the sun rays from reaching the spa directly through the glass as the temperature may get too high. -
c. In-Ground / Sunken Spa
In case of sinking the spa into the ground you must make sufficient space for walking around the spa. For completion of maintenance works a minimum of 60cm wide inspection pit must be built around the spa.
The inspection pit’s bottom must be under the bearing pont of the spa so that water can flow into the pit in case of water leakage. A floor drain or sump pump should be used at the bottom of the pit to ensure continual water drainage.
In case of sinking the spa only the portion below the spa’s acrylic edge can be sunk. The air of the inspection pit steams up. To prevent unpleasant odors proper ventilation must be provided (e.g. installing ventilators). The costs of pulling the spa out of the ground are borne by the user. If the aforemen- tioned conditions are not present, setting up the spa may fail.
Electrical connection
All the above stated electrical preparation must be ensured by the costumer.
Every product has own connection drawing.
Use only copper wires. Change the fuses always with the same type. The device
has to be connected to the equipotential grid.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>