CONDUCTIX wampfler 0832 Conductor Rail System EcoClickLine Instructions
- June 9, 2024
- Conductix Wampfler
Table of Contents
CONDUCTIX wampfler 0832 Conductor Rail System EcoClickLine
Preparation of the conductor strip (conductor strip feed) insertation
Working steps to prepare the conductor strip feed insertation
- To check the freedom of motion and to remove impurity (e.g. chips or foreign objects), you must go through each pole by the feed aid and a rag. If available: The pockets of the insulation profile must be gone through by a 1 m oddment of 50 mm2 conductor strip with the feed aid. The profiles could have narrow sections due to false storage. Check the profiles of narrow sections.
- Position the uncoil device approx. 2-3 m away from the rail end and align the pole position of the conductor strip. The uncoil device must be eventually supported by wood or pallets.
- Check the conductor strip (coil) for damage (deformation due to tension belts while transport/damage due to im-pact/damaged conductor rail edges).
- Attach the support device of the straighten jig at the support profile.
- Put the conductor strip into the uncoil device. The conductor strip end must be without burr. Eventually a burr must be removed. Use a file to remove the burr.
- Slide the 3 roller trestler of the straighten jig in the hand over the conductor strip end. Adjust the pressure roller in the middle so that the conductor strip can be aligned without a bend through the 3 roller trestler. If it is necessary bend the conductor strip again and pilot the conductor strip through the 3 roller trestler until it is aligned precisely.
- Secure the 3 roller trestler in the support device. Lead the conductor strip through the 3 roller trestler and suspend the feed aid.
The aligned, burr free conductor strip in a cleaned pocket of the insulation profile must be threaded by 1 person without foreign help. The forces are < 20 kg/200 N!
Please note or rather read the further manuals
In following manuals you can find further information about the conductor rail system 0832
- MV0832-0006 Conductor strip insertion
- BAL0832-0002 System module and tools
Mounting Instructions
Conductor Rail System EcoClickLine
- Program 0832
Conductix-Wampfler GmbH
- Rheinstraße 27 + 33
- 79576 Weil am Rhein – Märkt Germany
Importer for the United Kingdom:
- Conductix-Wampfler Ltd.
- 1, Michigan Avenue
- Salford
- M50 2GY
- United Kingdom
Phone: +49 (0) 7621 662-0 Fax: +49 (0) 7621 662-144 info.de@conductix.com www.conductix.com
Phone: +44 161 8480161 Fax: +44 161 8737017 info.uk@conductix.com www.conductix.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>