TRAN LED Q-CAP Flexible Fixtures WALA Installation Guide
- June 9, 2024
- TRAN LED
Table of Contents
TRAN LED Q-CAP Flexible Fixtures WALA
VHB MOUNTING
-
Remove the backing from the adhesive and apply firm pressure to secondary backing.
-
Peel off the bonding surface.
-
Adhere to mounting surface
WHITE SNUG CLIP
NOTE: White snug clip should be placed every 12″
INCLUDED HARDWARE
4×5/8″ Flat head screw
-
Mount white snug clip with provided flat head screw.
-
Align fixture to white snug clips matching distances.
-
Press fixture into white snug clips.
PVC MOUNT CLIP: Connects two seamless fixtures, with or without wire exit
WALA-PPS-2
Mounting Feed
Press both fixtures into PPS clip.
Snap fixture into mounted PPS channel
When wire will exit into conduit do not install bracket
LOW PROFILE PVC MOUNT CLIP: Connects two seamless fixtures, with or
without wire exit
WALA-PPS-LP-2
Mounting Feed
Snap in 2″ channel
Press in fixtures
PVC MOUNTCHANNEL: Support for the fixture
ALA-PPS-96 & WALA-PPS-FT
INCLUDED HARDWARE
-
The PPS-BRACKET can be field cuttable and cut to whatever length your application requires. The PPS-BRACKET can be installed as a full length of 96″, multiple smaller pieces, or end to end for longer seamless runs.
-
Using pre-drilled pilot holes screw the #6 flat head screws to mount the PPS-BRACKET (1 screw every 16″). NOTE : For drywall applications mount directly into a stud.
-
Using pre-drilled pilot holes, use the #6 flat head screws to mount the PPS-BRACKET.
-
The PPS-96 or PPS-FT can be field cuttable and cut to whatever length your application requires. The PPS-96 or PPS-FT can be installed as a full length of 96″, multiple smaller pieces, or end to end for longer seamless runs.
-
To mount, pinch the upper half of the PPS-96 or PPS-FT while you pivot it around one side of the PPS-BRACKET and push-in until you hear it snap into place. The PPS-96 or PPS-FT flexes around the PPS-BRACKET to create a solid, and secure snap on connection.
LOW PROFILE PVC MOUNT CHANNEL: Support for the fixture
WALA-PPS-LP-96 & WALA-PPS-LP-FT
– 96″ (PPS-96) or custom length (PPS-FT)
NCLUDED HARDWARE
-
The PPS-LP-96 or PPS-LP-FT can be field cuttable and cut to whatever length your application requires. The PPS-96 or PPS-FT can be installed as a full length of 96″, multiple smaller pieces, or end to end for longer seamless runs.
-
Drill holes (1 hole/screw every 16″) into the PPS-LP.
-
Using pre-drilled holes, use the #6 flat head screws to mount the PPS-LP. NOTE : For drywall applications mount directly into a stud.
-
Snap fixture into PPS-LP
References
- Your Name as Your Email | Hover Realnames
- LED Lighting Systems, Linear LED Lights, LED transformers | Q-Tran
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>