Firmware Update
INSTRUCTION MANUAL
Control Units with USB-A Connector

DDE Control Units with USB-A Connector

Download: JBC Firmware Update File
Download the JBC Firmware Update File from www.jbctools.com/software.html which contains the latest update package. Save it on a USB-A pen drive, preferably one with no other files.

JBC DDE Control Units with USB-A Connector -

Connect the USB-A pen drive which contains the latest update file and the update notification to the control unit.
Will be displayed automatically.
Connection: USB-A Pen Drive to Control Unit

JBC DDE Control Units with USB-A Connector - DME

If the DME station does not detect the USB pen drive, please use a pen drive partitioning software.

JBC DDE Control Units with USB-A Connector - NAE

325ºC Follow these instructions for DME:

JBC DDE Control Units with USB-A Connector -
instructions

Press “Install” on the pop-up window. If not displayed click on the notification.
Follow these instructions for DDE / HDE / NAE / JTSE / TESE / JNASE / ACE (Preheater Console):

JBC DDE Control Units with USB-A Connector - Follow

Press key and confirm with “yes” in the pop-up window to begin the updating process.
Follow these instructions for ALE:

JBC DDE Control Units with USB-A Connector - instructions for
ALE

Press   key and confirm with “yes” in the pop-up window to begin the updating process.

Updating Process

During the updating process do not turn off the control unit, it may turn on and off automatically. The installation finishes when the updating bar is completed and the work screen is displayed.
For DME

JBC DDE Control Units with USB-A Connector - For DME

The work screen will be displayed after confirming the “Welcome” pop-up.
If the process stops for a long time (over 30 min), reset the station and wait until the installation is fully completed.

Checking Firmware Version

Check that the new firmware has been installed successfully by means of the following steps:
For DME:

JBC DDE Control Units with USB-A Connector - For DME1

Select first “Menu” (1) and than the “Station” icon (2) at the screen.

JBC DDE Control Units with USB-A Connector - Select
first

Select “Information” (3) and than press (4) to check the firmware version.
For DDE / HDE / NAE / JTSE / TESE / ACE Preheater Console:

JBC DDE Control Units with USB-A Connector - Preheater
Console

Select the key to access to the main menu. Than select “Station” (1).
Afterwards select “Info” (2) and finally select “Software Version” (3) to see the installed software version.
Para ALE:
Select the button to access the main menu. Then select “Station Settings” (1) and finally select “Program Version” (2) to see the version of the installed software.

JBC DDE Control Units with USB-A Connector - access1

JBC logo www.jbctools.com
0015733-110123

Documents / Resources

| JBC DDE Control Units with USB-A Connector [pdf] Instruction Manual
DDE Control Units with USB-A Connector, DDE, Control Units with USB-A Connector, Control Units, Units
---|---

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals