Growatt SPA4-10K series Residential Inverters User Manual
- June 8, 2024
- Growatt
Table of Contents
Growatt SPA4-10K series Residential Inverters
Brief Introduction
Preface
This manual will provide the users who use the Growatt SPA TL3 BH Series of
Shenzhen Growatt New Energy Technology Co.,LTD(Short for Growatt as below)
with the detailed product information and the installation instructions.
Please read this manual carefully and put this manual on some place where is
convenient to installation, operation, obtain. Any modifications of Growatt
new energy, we will not notify the user.
Target Group
Growatt SPA TL3 BH inverter must be installed by professional electrical
personnel who have obtained the certification of the relevant departments. We
have two kinds of energy storage machine for different battery one is for
lithium battery and the other is for lead-acid battery, we suggest: customer
should decide which kind of energy storage machine you want, Growatt can
provide only lithium battery with energy storage machine, customer can choose
lead-acid energy storage machine with no battery provide by Growatt while they
can buy these battery from market easily. Especially if customer choose energy
storage system with lithium battery(which must be provide by Growatt) but used
for lead-acid battery or used lead-acid battery for lithium battery model, it
will be dangerous. Installer can install energy storage machine of Growatt SPA
TL3 BH Series rapidly and troubleshooting, build communication system through
read this manual carefully.If you have any questions in the process of
installation, you can login in www.growatt.com and
leave some message.Or you can call our 24-hour service hotline+86 0755
27471942.
Product Description
Growatt SPA TL3 BH Series is used to store energy generated by the
photovoltaic cell panels or energy from grid if it is allowed in the battery,
also energy can be sent to power grid through SPA TL3 BH for self consumption
or when Grid power is lost, SPA TL3 BH can be used as backup power. SPA series
has six kinds of type:
- SPA 4000TL3 BH
- SPA 5000TL3 BH
- SPA 6000TL3 BH
- SPA 7000TL3 BH
- SPA 8000TL3 BH
- SPA 1 0000TL3 BH
Note : we describe this series as “SPA” as below.
Overview:
Position | Description |
---|---|
A | LED of status display |
B
C
| LCD screen
Function button
D| Ground point
E
F
| EPS output(off grid connection)
RSD(do not open except by Professional staff)
G| AC Grid (on grid connection)
H
I
| Rj45 interface of DRMs(used only in Australia)
NTC: Lead-acid temperature sensor terminal
J| RS485 communication interface of meter2(Reserved)
K
L
| RS485 communication interface of Lithium battery
Rs485 communication interface of meter1
M| CAN communication interface of Lithium battery
N| RS232/Wi-Fi/shinelink cover board
0
p
Q
| USB interface Antenna
Battery terminal(negative)
R
s
T
| Battery terminal(positive) Breathable valve
DIP switch(set safety standard)
u| Dry contact
Safety Instructions
- Please be clear which kind of battery system you want, lithium battery system or leadacid battery system, if you choose the wrong system, SPA can’t work normally.
- Please read this manual carefully before the installation, The company has the right not to quality assurance,lf not according to the instructions of this manual for installation and cause equipment damage.
- AII the operation and connection please professional electrical or mechanical engineer.
- During installation, Please don’t touch the other parts within the box.
- All the electrical installation must comply with the local electrical safety standards.
- lf equipments needs to maintain, Please contact with local specify system installation and maintenance personnel.
- Use the equipment to combined to grid needs to obtain the permission of local power supply department.
Safety
Purpose Use
The system chart of SPA:
As shown above, a complete grid-connected system of SPA consists of SPA inverter, battery, utility grid and other components.
Attention:
As the system refer to battery use, We must make sure ventilation of the
service environment and temperature control in order to prevent the danger of
battery explosion, Battery recommended installation environment must be
strictly in accordance with the specification, if the specification is IP20
environment, the pollution degree of the unit is PD2, meanwhile the
temperature should be control in the 0-40″C of indoor ventilation and the
humidity should be 5%-85%.
Safety Measure
Risk of high voltage! Relevant operation for professional personnel. Please
notice children, disabled, laypeople do not close. Supervise and make sure
children don’t play near the installation position of energy storage machine.
Symbols introduction on the SPA inverter
- Caution : Risk of electrical shock!
- Caution : hot surface!
- Caution : risk of danger!
- Danger to life due to high voltage in SPA. There is residual voltage in SPA, SPA requires 5 minutes to discharge. Please wait 5 minutes before you open the upper lid or the DC lid. Protective conductor terminal
- Direct Current(DC)
- Alternating C urrent(AC)
- The machine complies with the requirements of the applicable CE guidelines
- Refer to the operating instructions.
Product Description
Growatt SPA series inverter
Marks of SPA
Label Explanation
Label contains the following information: for example SPA 1 0000TL3 BH shows
as below:
Description of label:
Size and weight
A(mm) | B(mm) | C(mm) | weight(kg) |
---|---|---|---|
Growatt SPA TL3 BH | 453 | 505 | 198 |
The advantage of the unit of Growatt SPA Features below:
- All in one design. Can improve self consumption, back up and also pinch the valley.
- Smart management, work mode can be set.
- Safe battery used.
- Easy installation.
- Two mpp tracker input.
Unpacking and inspection
Before unpacking, please check whether there are any visible external damages.
After unpacking, please check whether there damages or missing of the parts,
if it happen, please contact with supplier.
Growatt SPA series and accessories shows as follows:
Item | Number | Description |
---|---|---|
A | SPA inverter | |
B | User Manual | |
C | Paper board(installation guide) | |
D | Waterproof cover | |
E | AC Grid connector | |
F | EPS output connector (red connector) | |
G | Communication cable | |
H | Lead-acid battery temperature sensor | |
RJ45 connector | ||
4 | M6 setscrew | |
K | Ground terminal | |
L | 4 | M4 setscrew |
M/N | 1/1 | Mc4 connector (blue connector) |
InstaIlation
Basic installation requirements
- A. The installation location must be suitable for SPA’s weight for a long period time.
- B. The installation location must conforms with dimension of SPA.
- C. Do not install the unit on structures constructed of flammable or thermo labile materials.
- D. The Ingress Protection rate is IP65 and the pollution degree is PD2. Please refer to the below:
- E. Battery installation option is not far away from the position of SPA, the length between SPA and battery should not be more than 5m.
- F. The ambient temperature should be -25°C~60 °C.
- G. SPA can be installed in vertical or lean back on plane, Please refer to the below:
- H. Installation position shall not prevent access to the disconnection means.
- I. In order to ensure machine can run normally and easy to operate, please pay attention to provide adequate space for SPA, Please refer to below:
- J. Do not install the machine near television antenna or any other antennas and antenna cables.
- K. Don’t install the machine in the living area.
- L. Be sure that the machine is out of the children’s reach.
- M. Taking the battery fixing space into account, about the dimensions please reference user manual.
- N. The Inflammable and explosive dangerous goods must not be placed around battery in case of cause serious danger.
Installation requires tools and RJ 45 terminal sequence of the LAN line.
When installing, we need to use tools as follow, prepare the follow tools
before installing:
No. | Description |
---|---|
Press the RJ45 terminal | |
2 | Press battery terminal connector |
3 | Disconnect battery terminal |
4 | Unscrew nut |
5 | Unscrew screw |
6 | Knock expansion screw |
7 | Drill holes on the wall |
LAN line RJ45 sequence as follow:
LAN line 1-8 colors as below:
PIN | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
---|
Color
| White orange|
Orange
| White green|
Blue
| White blue|
green
| White brown|
brown
Installation Instructions
Attention Layout (length of sensors consider)
Growatt SPA4000-10000TL3 BH only use meter as its sensor, before installing
your system you should know something as below:
- The cable of meter is suggested not longer than 15m. Because of this, you should consider the cable length between SPA and combiner box.
- The meter must installed in the L line.
- The installation layout of energy storage system at home shows as following:
Installation of SPA
- First estimate the size of the inverter on the wall;
- Determine the location of the drill hole through the cardboard (installation guide), put the cardboard on the wall and make sure the top edge of the cardboard is horizontal.
- Mark four points at the wall via the hole of the paper board, then remove the cardboard.
- Drill four
8 holes at the mark point, the depth is not less than 55mm. - Knock four explosion bolt into
8 holes (As the chart 5.8b below). - Hang the energy storage machine on the four setscrews (As the chart 5.8c below).
- Lock the nut of setscrew (As the chart 5.8d below).
- The whole installation has finished.
SPA System Connection Mode
Connection of AC terminal and off grid terminal
SPA has a grid output terminal and off grid out terminal, look down on the SPA
from the front, the terminal on the left (on grid) is grid outlet for
connecting grid, the terminal on the right is an emergency power outlet for
connecting critical load.
Wire suggest length:
conductor cross section
| max cable length
---|---
Growatt SPA 4000 TL3 BH| Growatt SPA 5000 TL3 BH| Growatt SPA 6000 TL3 BH|
Growatt SPA 7000 TL3 BH| Growatt SPA 8000 TL3 BH| Growatt SPA 10000 TL3 BH
10AWG| 88m| 70m| 59m| 50m| 44m| 35m
12AWG| 55m| 44m| 37m| 31m| 27m| 22m
AC Output terminal and EPs output terminal connection steps as follow:
- Step 1 :Uninstall the AC terminal as below chart.
- Step 2 : Thread cables through pressure screw, seal ring, threaded sleeve in sequence, insert cables into connection terminal according to polarities indicates on it and tighten the screws.
- Step 3 : Push threaded sleeve on to connection terminal until both are locked tightly.
- Step 4 : Plug the socket into AC output terminal, clockwise rotation to tighten the socket, counterclockwise rotation to loosen the socket.
The following diagram shows the AC output terminal of the Australian machine connection steps, EPS output terminal connection steps consistent with the above steps.
AC output terminal and EPS output terminal connection steps as follow:
- Step 1 : Uninstall the AC terminal as below chart.
- Step 2 : Thread cables through pressure screw, seal ring, threaded sleeve in sequence,insert cables into connection terminal according to polarities indicates on it and tighten the screwS.
- Step 3 : Push threaded sleeve on to connection terminal until both are locked tightly.
- Step 4 :Plug the socket into AC output terminal until it is locked. Use a flat-blade screwdriver to hold the buckle and pull out the AC terminal.
- Step 5 : Plug the AC terminal into the inverter AC port.
The recommended wiring diagram is as follows:
Note:
This diagram is an example for gird system without special requirement on
electrical wiring connection.
Note:
This diagram is an example for Australian and New Zealand gird system where
neutral line can’t be switched.
Note:
This diagram is an example for customer who only wants to use the on grid
storage system.
Notice:
- If you want to use on gird only, please refer to chart 5.21 Connect with AC grid and float EPS OUTPUT.
- If you want to use both on gird power and backup power, please refer to chart 5.19 and 5.20.Connect with AC grid and EPS OUTPUT like the chart show.
- On grid terminal and off grid terminal can’t directly connect together.
- Off Grid terminal can’t connect to grid.
- If you want to use on gird and off grid, you can use ATS (automatic transfer switch) like chart 5.19 and 5.20 before or ask Growatt for help to connect them.
- The first start of system needs Grid power.
EPS output does not support half-wave load type devices, such as hair dryers.
Connection of battery terminal
Similar to the traditional inverter connecting, the input of battery can be
realized by using MC4 terminal, the detail steps are as follows:
- Step 1 : Turn off battery switch.
- Step 2 : Insert battery panel positive and negative cables into MC4 terminal, then connect positive pole(+) of connection cable to positive pole(+) of battery input connector, connect negative pole(-) of connection cable to negative pole(-)of battery input connector. Please pay attention to battery input voltage and current within permission Limit:
- Max battery voltage: 550V
- Max battery input current : 25A
- Max battery input power : 1 0000W
Remark:
We suggest you use the cable?:4mm2/1 0 AWG to connect
Note:
We suggest the distance between battery and SPA no longer than Sm, and The
power line area must be larger than 1 0AWG.
Connection of meter terminal
When customer needs to use meter to monitor the energy flow, the meter
terminal connection steps are as follows:
- Step1 : Reference 5.2, make LAN cables with RJ45 terminal.
- Step2 : Thread the swivel nut over the LAN cable.
- Step3 : Press the cable support sleeve out of the cable gland.
- Step4 : Remove the filler plug from the cable support sleeve.
- Steps5 : Route the LAN cable through an opening in the cable support sleeve.
- Step6 : Thread the LAN cable through the cable gland.
- Step7 : Insert the RJ45 plug of the network cable into the “METER-1” pin connector on the inverter until it snaps into place.
- Step8 : If no other cables need to be installed, lock the waterproof cover to the inverter with screws.
- Step9 : Screw the swivel nut onto the waterproof cover.
Note:
- Meter must be provided by Growatt. If not, maybe meter can’t communicate with SPA inverter.
- The more detail describe of meter installation, please turn to meter user manual.
Remark:
Meter wire (15m in length) specification: RJ45, standard LAN line (one end
with 8P modular plug, the other connected with transformer). But if the length
is not enough, customer can add cable, so the length can be increased to 25m
max, the operation is as follow chart:
Connection of communication terminal for lithium battery (CAN)
When using CAN communication with lithium batteries (for example PYLONTECH X1)
connect lithium battery terminal (RJ45) steps as follows:
- Step1 : Unscrew the swivel nut from the cable gland.
- Step2 : Thread the swivel nut over the “CAN” cable.
- Step3 : Press the cable support sleeve out of the cable gland.
- S tep4: Remove the filler plug from the cable support sleeve.
- Steps5 : Route the “CAN” cable through an opening in the cable support sleeve. Step6: Thread the “CAN” cable through the cable gland.
- Step 7: Insert the RJ45 plug of the network cable into the “CAN” pin connector on the inverter until it snaps into place.
- Step8 : If no other cables need to be installed, lock the waterproof cover to the inverter with screws.
- Step9 : Screw the swivel nut onto the waterproof cover.
Connection of DRMS terminal(Australia only)
When SPA is applied to Australia, the ORMS terminals need to be connected, the
connection way appears as follows:
- Step1: Unscrew the swivel nut from the cable gland.
- Step2 : Thread the swivel nut over the “ORMS” cable.
- Step3 : Press the cable support sleeve out of the cable gland.
- Step4 : Remove the filler plug from the cable support sleeve.
- Step 5 : Route the “ORMS” cable through an opening in the cable support sleeve. Step6: Thread the “DRMS” cable through the cable gland.
- Step7 : Insert the RJ45 plug of the network cable into the “ORMS” pin connector on the inverter until it snaps into place.
- Step8 : If no other cables need to be installed, lock the waterproof cover to the inverter with screws.
- Step9 : Screw the swivel nut onto the waterproof cover.
RJ45 terminal pin assignment
PIN | assignment for inverter scapable of both charging and discharging |
---|---|
DRM5 | |
2 | DRM6 |
3 | DRM7 |
4 | DRM8 |
5 | Ref Gen |
6 | COM/DRM0 |
7 | I |
8 | I |
Method of asserting demand response modes
MODE | Rj45 socket asserted by shorting pins | Requirement |
---|---|---|
DRM0 | 5 | 6 |
DRM5 | 5 | |
DRM6 | 2 | 5 |
DRM7
|
3
|
5
| Do not generate at more than 75% of
rated power and sink reactive power if capable
DRM8| 4| 5| Increase power generation (subject to constraints from other active DR Ms)
Note:
If the cable such as “NTC” (lead-acid battery temperature sensor) cable is not
used, please do not remove the filler plug from the cable support sleeve.
Connection of temperature probe for lead-acid battery
When customer using lead-acid battery, the temperature probe of the lead-acid
battery is used to detect the ambient temperature of the lead-acid battery,
the battery temperature cable of the SPA side connection steps are as follows:
- Step1 : Unscrew the swivel nut from the cable gland.
- Step2 : Thread the swivel nut over the “NTC” cable.
- Step3 : Press the cable support sleeve out of the cable gland.
- Step4: Remove the filler plug from the cable support sleeve.
- Step5 : Route the “NTC” cable through a min opening in the cable support sleeve. Step6: Thread the “NTC” cable through the cable gland.
- Step7 : Insert the RJ45 plug of the network cable into the “NTC” pin connector on the inverter until it snaps into place.
- Step8 : If no other cables need to be installed, lock the waterproof cover to the inverter with screws.
- Step9 : Screw the swivel nut onto the waterproof cover.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>