Growatt ARK-2.5H-A1 High Voltage Battery Installation Guide
- June 8, 2024
- Growatt
Table of Contents
- Growatt ARK-2.5H-A1 High Voltage Battery
- Installation environment
- Check
- Floor installation with base
- Wall-Mounted Installation Process
- Wire Connection
- Terminal Connection
- Battery system switch operation
- Key operation
- Service and contact
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Growatt ARK-2.5H-A1 High Voltage Battery
Installation environment
Installation tools
System size
Check
Check HVC60050-A1 List
CheckARK2.5H-A1 List
Check accessories
Floor installation with base
Installation Location Requirements
Ground (Two rows installation)
Note:
- If more than 4 batteries are used, base mounting is recommended.
- For floor installation with base, the maximum stack number of the battery is ten.
But if the battery number is greater than six, we recommend stacking them in two lines.
Installation Procedure
Note: The safety part needs to be installed at the top battery, however, once the number of the battery pack is higher than 7, one more safety part should be installed in the middle battery which is shown the last step.
Wall-Mounted Installation Process
Installation Location Requirements
Note: The number of wall-mount installations should not exceed four.
Please make sure that the weight capacity of wall should exceed 150kg.
Installation Procedure
- Adjust the screw to ensure the battery in horizontal position
Lnstall Environment
Note: Build sun& rain shade 1o avoid direct exposure 1o sunlight and rain.
Wire Connection
HVC60050-A1 Connection end face introduction
- PCS CAN communication
- LINK-IN CAN communication
- Safety vent
- LINK-OUT CAN communication
- BMU CAN communication
- Module terminal
- GND terminal
- PCS terminal
- GND terminal
- USB interface
- LED
ARK 2.5H-A1 Connection end face introduction
- LINK O CAN communication
- LINK 1 CAN communication
- Module negative terminal
- Module positive terminal
- GND terminal
- Safety vent
- GND terminal
Diagram of wiring connection
Note: The switch connect PCS toARK-2.5H-A 1, we recommend the use of molded case circuit breaker with rated working voltage greater than 750V and rated working current greater than 63A.
Terminal Connection
Power terminal
Note: Press the piston indicated in the figure above before disconnecting the power terminal.
Communication terminal
Battery system switch operation
Power ON battery system
Power on battery system:
Turn the circuit breaker to the “ON” state, press the POWER button for 5-6
seconds, wail for the battery system LED light to light up, indicating that
the boot is complete.
Power OFF battery system
Power off battery system:
Tum the breaker of to “OFF” to tum off the entire battery system.
Key operation
Power Button
Note: When multiple battery system are used in parallel connection, you only need to press one key of any module to start the system.
Service and contact
Shenzhen Growatt New Energy CO.,Ltd
No. 28 Guangming Road,Shiyan Street,Bao’an District, Shenzhen,P.R.China
® 86 0755 274 7194 2 @) service@ginverter.com
W: www.ginverter.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>