STELPRO SALC0503ZB Smart Resistive Load Controller User Guide

June 9, 2024
StelPro

STELPRO SALC0503ZB Smart Resistive Load Controller

STELPRO SALC0503ZB Smart Resistive Load Controller

Before getting started

Choosing the location of your devices wisely will optimize Allia’s mesh network and promote efficient communication between the devices.
Consider the location of the power cable and the device. You should be able to easily connect the power cable from the electrical panel to the power side of the load controller (CCR) and the load side of the CCR to the device.
For more information, visit www.stelpro.com/allia

Warning

To reduce the risk of fire, electric shock or electrocution, CUT OFF THE POWER AT THE ELECTRICAL PANEL and make sure the circuit is switched off.
Always follow the electrical code in effect in your region. The load controller must be installed by a CERTIFIED ELECTRICIAN.
Connect the load controller ONLY to a 120 VAC to 347 VAC power source and observe the load limits.

Tension  (VCA) Rated voltage (VCA) 120 240 277 347
– Resistive

50 A

| 20 A
Incandescent – Incandescent|

20 A

| S.O.
Ballast – Magnetic ballast|

20 A

| 15 A
Ballast – Electronic ballast|

15 A

| S.O.
– Motors| 1.5 HP| 3 HP| S.O.

Attaching the load controller (CCR)

  1. Remove the cover [A], screws and pull-stops [B] and set them aside.
    Attaching the load controller \(CCR\)

  2. Place the CCR in the chosen location and mark the position of the holes.
    Attaching the load controller \(CCR\)

  3. Secure the CCR in place with the mounting screws provided.
    Attaching the load controller \(CCR\)

Installing the CCR on the unit’s power cable

  1. Cut your unit’s power cable and strip about 2 cm (¾ in) from the end of each section of cable.
    Installing the CCR on the unit’s power cable

  2. Open the CCR’S 6 terminals with a flat screwdriver.
    Installing the CCR on the unit’s power cable

  3. Insert each section of the cable fully into the terminal blocks, making sure that the wires of the same colour face each other:
    Installing the CCR on the unit’s power cable
    Warning : Be sure to install the grounding wires in the central terminals.

  4. Install the pull-stops in place with their screws (2 for each pull-stop) applying a maximum torque of 0.20 Nm.
    Installing the CCR on the unit’s power cable

  5. Replace the cover on the CCR and secure it with the cover screws.

  6. Restore power to the unit’s power cable.
    Installing the CCR on the unit’s power cable

  7. Press button [A] on the CCR to turn it on. The charging indicator light should come on.
    Installing the CCR on the unit’s power cable

Pair the load controller to the Allia  ecosystem

  1. Install and configure the Allia app.
    |
    ---|---

  2. In the Allia application, click on [+] in the device tab.
    Pair the load controller to the Allia  ecosystem

  3. Select [Add a device].

  4. Select “Load controller” as the device type.
    Pair the load controller to the Allia  ecosystem
    The screen can change over time to improve the user experience.

  5. Press the Charge controller button [A] for about 3 seconds until the network indicator light changes from yellow to flashing blue.
    A message will appear in the app to indicate that the device has been added.
    Pair the load controller to the Allia  ecosystem

Customer Support

Visit our website to get more information, learn everything there is to know about Allia or view the complete user guide.
www.stelpro.com/allia

STELPRO  logo

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals