GENEVA AVIATION BELL 204 VDC Power Converter Instruction Manual

June 12, 2024
GENEVA AVIATION

INSTRUCTIONS FOR CONTINUED AIRWORTHINESS
FOR
28 to 14 VDC POWER CONVERTER
GENEVA AVIATION BELL 204 VDC Power Converter
FOR

BELL 204/205/212/214/412 SERIES HELICOPTERS
Report No.: ICA204-1

APPROVED BY: C. Bonar
Rev. N/C DATE: 06/03/2014
This technical data package being provided to the FEDERAL AVIATION ADMINISTRATION (FAA)
It includes, but is not limited to drawings, specifications and other technical data attached hereto and are the Property of Geneva Aviation (GA) and constitute trade secrets for the purpose of the Trade Secrets and Freedom of Information Act.
Disclosures to any party for any reason without the permission of GA is prohibited, except that disclosures may be made within the FAA’s organization consistent with the need to evaluate GA’s technical data.

SUBJECT REF.DRAWING NO. REPORT NO.
INSTRUCTIONS FOR CONTINUED AIRWORTHINESS GA204 ICA204-1

Rev. N/C
06/03/2014

DETAILS OF REVISIONS

REV. DATE PAGE DESCRIPTION APPROVED
N/C 6/3/2014 All Initial Release C. Bonar

RECORD OF SERVICE BULLETINS

S/B NO. DATE DESCRIPTION
None
SUBJECT    REF.DRAWING NO.         REPORT NO.
--- --- ---
INSTRUCTIONS FOR CONTINUED AIRWORTHINESS GA204 ICA204-1

Rev. N/C
06/03/2014

LIST OF EFFECTIVE PAGES
Title Page Revision No. 

Cover 1 N/C
Details of Revisions 2 N/C
Record of Service Bulletins 2 N/C
List of Effective Pages 3 N/C
Table of Contents 4 N/C
List of Figures 5 N/C
List of Applicable Documents 5 N/C
Section 1.0 Introduction 6-7 N/C
Section 2.0 Airworthiness Limitations 8 N/C
Section 3.0 Inspection Requirements and Overhaul Schedule 8 N/C
Section 4.0 Power Converter Removal, Inspection and Re-Installation Section
19-10 N/C
Section 5.0 Cable Maintenence 11-12 N/C
Section 6.0 System Testing 13 N/C
Section 7.0 Weight and Balance 13 N/C
SUBJECT    REF.DRAWING NO.         REPORT NO.
--- --- ---
INSTRUCTIONS FOR CONTINUED AIRWORTHINESS GA204 ICA204-1

Rev. N/C
06/03/2014

LIST OF APPLICABLE DOCUMENTS

Document Number Description
None

Section 1.0 Introduction

1.1 Scope
This manual provides description, operation, removal, inspection, and installation, for the 28 – 14 VDC Power Converter.
1.2 Purpose
The purpose of this manual is to maintain the 28 – 14 VDC Power Converter in peak operating efficiency with the greatest service life.
1.3 Revision Control Procedure
All revisions to this document shall be identified in the Details of Revisions. All pages will be summarized on page 2, “List of Effective Pages.”
1.4 Service Difficulty Reporting
A record of sales shall be maintained by Geneva Aviation. Any changes to these instructions resulting from service difficulties (ref: 14 CFR § 21.3) shall be distributed to all previous recipients.
1.5 Applicability
This manual shall be used to maintain the 28 – 14 VDC Power Converter for Bell 204/205/212/214/412 Series Helicopters.
1.6 Abbreviations and Units of Measure
in = inches
lbs = pounds
P/N = part number
I/N = item number
LH = left hand
RH = right hand
1.7 Orientation
All references to direction, such as left, right, up, down, forward and aft, are in reference to the airframe. Forward is toward the nose of the aircraft, etc.
1.8 Precautions
The following precaution definitions will be used to indicate the seriousness of the hazard or condition.
WARNING: May be a maintenance procedure, practice, condition, etc., which could result in personal injury or loss of life.
CAUTION: May be a maintenance procedure, practice, condition, etc., which could result in damage or destruction of equipment.
NOTE: May be a maintenance procedure, practice, condition, etc., or a statement that needs to be highlighted
1.9 Distribution

This manual will be distributed to end users (or their mechanics or maintenance departments). A copy of this ICA shall be provided by Geneva Aviation with each kit sold.
1.10 Description
The Geneva Aviation 28 – 14 VDC Power Converter comes in two amperage ratings: The P168 (G12980) 20 Amp Power Converter and the P174 (G13053) 27 Amp Power Converter.
Both the P168 and P174 are identical in form factor, weight and installation instructions.
The Power Converter is used to provide power to non-essential 12 VDC devices (accessories).This STC does not approve the installation of these other devices and it is the installer’s responsibility to obtain the proper approval for their installation.
The Power Converter includes a trim pot that may be adjusted through an access hole in the side in order to adjust the output voltage from 12 – 15.5 VDC to suit the device that is being powered.
There are no restrictions as to the quantity of power converters installed. However, it is the installer’s responsibility to verify that the installation of this device does not interfere with other equipment installed and to perform an electrical analysis to verify that the aircraft accessory buss can support the installation of the power converter.

Section 2.0 Airworthiness Limitations

There are no Airworthiness Limitations associated with the STC.
The Airworthiness Limitation Section is FAA approved and specifies inspections required under Part 43.16 and 91.403 of Federal Regulations unless an alternate program has been FAA approved.

Section 3.0 Inspection Requirements and Overhaul Schedule

3.1 Inspection Requirements
3.1.1 500 Hour Inspection
Inspect all cable connectors, fasteners and hardware for security and condition.
3.1.2 2 year / 2000 hour Inspection
a. Remove the 28 – 14 VDC Power Converter from the aircraft. See Section 4.0.
b. Inspect all metal components for damage and corrosion. If damage or excessive corrosion is found, replace the affected parts per Section 4.0 Corrosion that has penetrated more than 0.01” is cause for replacement of sheet metal components.
c. Inspect system cabling for damage, loose connectors and chafing. If damaged refer to Section 5.0 for instructions for repairing cabling.
3.2 Overhaul Schedule
There is no Overhaul Schedule for this kit.

Section 4.0 Power Converter Removal, Inspection and Re-Installation

4.1 Power Converter Removal
a. Disconnect cable connector from the Power Converter.
b. Disconnect (4) #8-32 screws securing the Power Converter to the mounting structure.
4.2 Power Converter Inspection
a. Carefully inspect the Power Converter for signs of damage, cracks, or corrosion. Any corrosion that has penetrated the base metal by more than .01 inches is cause for replacement.
b. The Power Converter contains no user serviceable internal components. Do not disassemble Power Converter or the factory warranty will be voided. Return the unit to Geneva Aviation for service.
4.3 Power Converter Reinstallation
a. The Power Converter is designed to be mounted in a variety of locations within the airframe, provided it is protected from the environment. It may be mounted to a deck, bulkhead, tray, avionics shelf or other structure rated to carry a 1.50 lb load. The exact mounting location is left to the installer’s discretion provided that the installation of the Power Converter does not interfere with other equipment installed.
b. Mount the Power Converter using (4) #8-32 screws, washers and locknuts or nutplates. When mounting into composite structure, #8-32 potted inserts should be used.
c. Unless otherwise specified, follow aircraft manufacturer’s standard practices and maintenance manuals for installation of all hardware.
d. Maintain a minimum 2 e/d edge margin for all installed fasteners.
e. Refer to Figure 1 and Figure 2 and for Power Converter reference dimensions that may be used when planning the installation.
GENEVA AVIATION BELL 204 VDC Power Converter -
Footprint

Section 5.0 Cable Maintenence

5.1 Cable Maintenance
a. Unless otherwise specified, follow the aircraft manufacturer’s electrical wiring practices and maintenance manuals for installation of all system wiring.
b. Refer to Figure 3 for cable harness fabrication instructions.
c. Unless otherwise noted, all shielded wire is M27500-(ga)TG(n)T14 and all unshielded wire is M22759/16-(ga)-9, where (ga) is the wire gauge and (n) is the number of wires inside the shield.
d. Unless otherwise noted, all wire is 22 GA.
e. The circuit breaker must have a 20 amp rating. Use MS3320-20 or refer to the Aircraft Maintenance Manual for the appropriate circuit breaker part number for the bus that the power supply is being connected to.
f. Route all system cabling through existing cable runs.
g. Secure all cabling using nylon cable ties and/or cable clamps using standard practices.GENEVA AVIATION BELL 204 VDC Power Converter - Cable
Wiring

5.2 Pin Designation
a. Refer to Figure 4 for Power Converter pin designation. GENEVA AVIATION
BELL 204 VDC Power Converter - Pin Designation

Section 6.0 System Testing

6.1 System Testing
a. Before applying power, perform a continuity check of all power and ground leads to confirm they are connected properly.
b. Test power output of Power Converter by applying input power to Pin C and measuring voltage level output on Pin B using a voltage meter.
c. Adjust voltage level to desired value by turning trim pot on side of converter.
d. Connect to 12VDC device and test for proper operation. Re-adjust voltage if required under load.

Section 7.0 Weight and Balance

Weight of the power converter and mounting hardware = 1.50 lbs.
The arm will depend on the exact location that it is installed.
The installer will record the location for the power converter along with its installed weight on the aircraft’s weight and balance record.

Copyright 2014 Geneva Aviation
SEE NON-DISCLOSURE NOTICE ON THE COVER PAGE
All Rights Reserved
19717 62nd Ave. South
Suite E-101, Kent, WA 98032
PH: 800-546-2210 FAX: 800-546-2220
Website: www.genevaaviation.com/

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals