Quik Stik Rafter and Truss Fastening System
Instruction Manual
Raising the Bar on Overhead Fastening
Introducing the new standard for overhead assembly installations of rafter and truss connections. The Simpson Strong-Tie® Quik Stik installation tool provides contractors with a versatile solution that makes fastening rafter and truss connections fast, safe and easy.
- Fast installation: Drive screws overhead from a standing position with no ladders
- Safe on the jobsite: Designed for use inside the structure — no need to work outside the building
- Easy to operate — less-experienced users can work quickly and efficiently
- Proven fastener solution: Tested and code-listed
- Precise: Bright orange guidelines facilitate proper alignment for each of the approved installations
- Special purpose: Designed specifically for use with the Strong-Drive® SDWC Truss screw for rafter/truss connections
Quik Stik and Strong-Drive SDWC Truss screws are designed to work together for
a safe, reliable solution from the leader in structural fastening.
Features
Easy to Install
Efficiently Installs a Variety of Top-Plate-to-Rafter/Truss Assemblies
Instantly Positions Fastener at the Optimal Installation Angle
In this type of installation, when the angle
guideline is vertical (or if bubble is visible in
level), the SDWC screw is at the optimal angle
for top plate to rafter/truss connections.| In this type of installation, when
the centerline
guide is vertical, the screw is at the optimal
90° angle for vertical connections into an offset
rafter/truss assembly.| In this type of installation, when the centerline
guide points to the middle of the rafter/truss and the angle guideline is
vertical (or if the bubble is visible in the level), the SDWC Truss screw is
at the optimal compound angle.
A Proven Connection
The Quik Stik system was designed for installing the Strong-Drive® SDWC
Truss screw (sold separately). The Strong-Drive SDWC Truss screw provides a
connection that fastens rafters and trusses to top plates. Strong-Drive SDWC
Truss screw features:
- The fully threaded shank engages the entire length of the fastener, providing a secure connection
- 6-lobe drive recess provides a secure connection between the driver bit and the SDWC cap head for consistent drive performance
- Drives easily without splitting wood
- Orange topcoat for easy inspection of code-listed 6″ truss screws
- The SDWC is tested in accordance with ICC-ES AC233 (screw) and AC13 (wall assembly and roof-to-wall assembly) for uplift and lateral loads between wall plates and vertical wall framing and between the top plate and the roof rafters or trusses
- Codes/Standards: IAPMO UES ER-262
SDWC15600-KT contains:
- (50) Strong-Drive SDWC screws
- (1) Matched-tolerance driver bit (Part no. BIT30T-RT1; also sold separately)
SDWC15600B-KT contains:
- (500) Strong-Drive SDWC screws
- (2) Matched-tolerance driver bits (Part no. BIT30T-RT1; also sold separately)
Rafter/Truss-to-Top-Plate Connections
These instructions apply to rafter/truss-to-top-plate connections. Allowable
loads for Installations 1–5 are shown below.
Note: SDWC screws install best with a minimum 18V (if cordless) drill
using the matched-tolerance bit included in the SDWC15600KT or Quik Stik
system using the included bit.
Allowable Roof-to-Wall Connection Loads — DFL, SP, SPF, HF
Model No.| Minor Diameter (in.)| Length(in.)| Thread Length (in.)| Allowable
Loads (lb.)
---|---|---|---|---
DF/SP| SPF/HF
Uplift| F1| F2| Uplift| F1| F2
SDWC15600| 0.152| 6| 53⁄4| 615| 130| 225| 485| 115| 190
- Loads have been increased for wind and earthquake loading (C D = 1.6), no further increases allowed; reduce where other loads govern.
- Allowable loads are for SDWC installed per the installation instructions. SDWC screws are shown installed on the interior side of the wall. Installation on the exterior side of the wall is also acceptable.
- An SDWC screw may be used in each ply of two- or three-ply rafters or trusses. The allowable uplift load for each screw shall be multiplied by 0.90, but may be limited by the capacity of the plate or the connection between the top plate to the framing below. SDWC screws in multi-ply assemblies must be spaced a minimum of 1 1⁄2″ o.c.
- Loads assume a minimum overhang of 3 1⁄2″.
- For uplift connection load path, the Designer shall verify complete continuity of the uplift path.
- When the screw is loaded simultaneously in more than one direction, the allowable load must be evaluated using the following unity equation: (Design Uplift ÷ Allowable Uplift) + (Design F2 ÷ Allowable F2 ) ≤ 1.0
- Top plate, stud and top plate splice fastened per applicable Building Code.
- Table loads do not apply to trusses with end-grain bearing.
Installation 1 Instructions — Rafter/Truss Offset from Stud:
Fasten Straight up Through Double Top Plate
These instructions apply only if the rafter/truss is offset from the stud
below.
Installation Steps: Position the Quik Stik head directly under the top plate
so that the screw is pointing toward the centerline of the rafter/truss.
Ensure the Quik Stik centerline guide is vertically perpendicular to the top
plate.
Drive the SDWC Truss screw straight up through the top plates and into the
rafter/truss until the head is flush with the board’s surface.
Installation 2 — Rafter/Truss Offset from Stud:
Fasten from Front-Bottom Corner of Double Top Plate
These instructions apply only if the rafter/truss is offset from the stud
below
Installation Steps: Position Quik Stik so that the positioning prongs straddle
the bottom edge of the double top plate and with the SDWC screw set to enter
the bottom member along its edge. Ensure the Quik Stik centerline guide points
to the center of the rafter/truss and that the orange angle guide is
perpendicular to the top plate (alternatively, check to ensure that the bubble
is visible in the level window).
Drive SDWC screw through the top plates and into the rafter/truss.
Installation 3 Instructions — Rafter/Truss Aligned with Stud:
Fasten from Wide Face of Stud
These instructions apply to rafter/truss-to-top-plate connections utilizing
one or two screws when installed from the underside of the top plate and from
the wide face of the rafter/truss.
Installation Steps: Position the Quik Stik head so that its positioning prongs
are in contact with the framing where the top plate meets the wide face of the
stud. Sight along the Quik Stik centerline guide to align the tool with the
centerline of the rafter/truss. If the rafter/truss is offset from the stud,
be sure to install the screw on the overhanging side. Adjust the installation
angle of the head to align with the rafter/truss centerline. For a one screw
installation: position the screw in the central one third of thewide face.
For a two-screw installation: see Configuration A on p. 10 for screw locations
and edge distances. Drive the SDWC Truss screw through the top plates and into
the rafter/truss.
Installation 4 Instructions— Rafter/Truss Aligned with Stud: Fasten
from Narrow Face of Stud
These instructions apply if the rafter/truss is aligned wi th the stud belowor
if there is blocking directly below the top plate.
Installation Steps: Put the point of the screw in the seam between the top plate and stud — or on the desired spot for installation — and pivot the whole tool up past 45°.
Drive the SDWC Truss screw point into the wood surface so that the first two screw threads embed into the wood. Pivot the tool downward until the bubble appears in the level window, and continue to drive the SDWC Truss screw through the top plates and into the rafter/truss.
Installation 5 — Rafter/Truss Aligned with
Stud: Fasten from Corner of Stud
These instructions apply if the rafter/truss is aligned with the stud below,
and the installation of the screw is from the corner where the stud meets the
top plate below the rafter/truss. The configuration would be similar to that
of Installations 2 and 3.
Installation Steps: Position Quik Stik so the positioning prongs straddle
the front corner where the stud meets the top plate. Ensure the centerline
guide is pointed at the center of the rafter/truss.
Align the angle guide with the vertical edge of the stud (or if using the
bubble level, the bubble should appear in the level’s window).
Drive the SDWC Truss screw through the top plates and into the rafter/truss
until the screw head is flush with the bottom of the top plate.
Two-Screw Configurations
These illustrations apply to rafter/truss-to-top-plate connections utilizing
two-screw configurations.
Allow loads using a two-screw configuration per the detail configurations
shown on the following pages.
Allowable Loads for Rafter/Truss-to-Top-Plate Two-Screw Connections
Configuration| Model No.| Minor Diameter (in.)| Length(in.)| Thread Length
(in.)| Quantity
Required| Allowable Loads (lb.)
---|---|---|---|---|---|---
DF/SP| SPF/HF
Uplift| F1| F2| Uplift| F1| F2
A| SDWC15600| 0.152| 6| 5 3⁄4| 2| 1,200| 685| 995| 1,045| 495| 670
B| 1,195| 680| 925| 1,195| 405| 680
C| 905| 535| 790| 850| 330| 595
- Loads have been increased for wind and earthquake loading (CD=1.6) with no further increase allowed; reduce where other loads govern.
- For Uplift Connection Load Path, the Designer shall verify complete continuity of the uplift load path.
- When cross-grain tension cannot be avoided, supplemental reinforcement shall be considered by the Designer.
- Proper installation angles for all configurations are the responsibility of the installer.
- SDWC screws must be offset min. 1/4″ from top plate splices for full values.
- Loads assume minimum overhang of 3 1⁄2″.
- When a screw is loaded simultaneously in more than one direction, the allowable load must be evaluated using the unity equation: (Design Uplift ÷ Allowable Uplift) + (Design F1 ÷ Allowable F1) + (Design F2÷ Allowable F2) ≤ 1.0. The three terms in the unity equation represent the possible generated force directions. The number of terms that must be considered for simultaneous loading is the sole discretion of the Designer and depends on the method of calculating wind forces and the utilization of the screws within the structural system.
- An SDWC screw may be used in each ply of two- or three-ply rafters or trusses. The allowable uplift load for each screw shall be multiplied by 0.90, but may be limited by the capacity of the plate or the connection between the top plate to the framing below. SDWC screws in multi-ply assemblies must be spaced a minimum of 1 1⁄2″ o.c.
Configuration A:
Using Quik Stik Installation 3
Truss Aligned with Stud — Install through Top Plate into Rafter/Truss
Both screws installed at a 4°–14° angle, offset 3⁄4″–1 1/4″ from opposite
edges of the top plate.
Configuration B:
Using Quik Stik Installation 1
Truss Offset from Stud — Install through Top Plate into Rafter/Truss
Both screws installed vertically ±5° into the center of the rafter/truss from
the underside of the top plate,
1⁄2″–1″ from opposite edges of the top plate.
Configuration C:
Using Quik Stik Installation 4
Install through Top Plate into Rafter/Truss
Both screws installed at a 16°–30° angle, offset 1⁄2″ from the opposite edges
of rafter/truss.
Top-of-Wall Assemblies for Factory-Built Structures
SDWC — Allowable Uplift Loads for Factory-Built Structures
Model No.| Minor Diameter (in.)| Length (in.)| Thread Length (in.)| Allowable
Uplift SPF/DF/SP (lb.) (160)
---|---|---|---|---
With Overhang| Without Overhang
SDWC15600| 0.152| 6| 5 3⁄4| 415| 370
- Loads have been increased for wind or earthquake (CD =1.6); no further increase allowed; reduce where other loads govern.
- Allowable loads apply to spruce-pine-fir, hem-fir, Douglas fir–Larch and southern pine.
- Allowable loads are for an SDWC installed per the “With Overhang” or “Without Overhang” installation details.
- SDWC must be installed on the exterior side of the wall.
- SDWC must be installed at an angle between 15° and 22°. Guide provided with screws is at 22°.
- For Uplift Continuous Load Path, top plate to stud connections must be located on the exterior side of the wall.
- Table loads do not apply to trusses with endgrain bearing.
- Top plate, stud and top-plate splice fastened per applicable building code.
Use Quik Stik Installation 4
The allowable uplift loads are provided for the Strong-Drive® SDWC Truss screw
(SDWC15600) installed with a 5/8″ OSB bearing strip between the truss and the
top plate.
Raising the Bar on Overhead Fastening
Installations with the Strong-Drive® SDWC TRUSS Screw
Building codes require structures to be designed to create a continuous load
path. Forces must be transferred from their point of origin to the building
elements that are designed to resist them. When uplift forces act on a roof,
the roof must be tied to the wall below it; and the wall must be tied down to
the foundation or wall below.
Like hurricane ties, the SDWC truss screw fastens the rafter or truss directly
to the top plate of the wall. See pp. 5–15 of this guide for installation
requirements and load transfer capacities. The wall top plate alone does not
offer sufficient resistance to roof uplift forces, and therefore must be tied
to the studs or framing below. The Simpson Strong-Tie Quik Stik allows for
fast, easy overhead installation of SDWC Truss screws in rafter and truss
assemblies.
Note: In the following pages, truss plate applications have been simplified to improve illustration clarity. Fastener installations are not intended to replace diaphragm boundary members. Designed details to prevent cross-grain bending and cross-grain tension may be necessary.
Strong-Drive® SDWC TRUSS Screw
Clear Zinc Coating (with Orange Topcoat)
Size| Thread Length (in.)| Fasteners Per Pack| Retail Pack| Model No.| Mini-
Bulk Bucket
---|---|---|---|---|---
Retail Per Master Carton| Fasteners Per Bucket| Model No.
0.152 x 6| 5 ¾| 50| 6| SDWC15600-KT| 500| SDWC15600B-KT
Allowable Shear Loads — DFL, SP, SPF
Allowable Shear Loads (lb.)
Model No.| Fastener Length (in.)| Thread Length (in.)| Side Member| Main
Member| Zpara| Zperp
SP| DFL| SPF| SP| DFL| SPF
SDWC15600| 6| 5 3⁄4| (2)2x (Face)| 2x (Edge)| 245| 240| 180| 240| 240| 240
2x (Face)| 2x (End Grain)| —| —| —| 225| 205| 190
(2)2x (Face)| 2x (End Grain)| —| —| —| 225| 225| 190
- Allowable loads are shown at the wood load duration factor of CD = 1.0. Loads may be increased for load duation up to a CD = 1.6.
- Tabulated values must be multiplied by all applicable adjustment factors per the NDS.
- The main and side members shall be sawn lumber or structural composite lumber with a specific gravity or equivalent specific gravity 0.42 to 0.55.
- Zpara — Parallel-to-grain loading in the side member and perpendicular-to-grain loading in the main member.
- Zperp — Perpendicular-to-grain loading in the side member and perpendicular-to-grain loading in the main member, except for 2x (edge) where main member is loaded parallel to grain.
- The connection conditions of this table are for specific intended applications. Reference lateral design values for all other shear connections are calculated following the NDS.
Allowable Withdrawal and Pull-Through Loads — DFL, SP, SPF
Model No.| Screw Length (in.)| Thread Length (in.)| Main Member| Allowable
Withdrawal Loads (lb./in.)| Allowable Pull-Through Loads (lb./in.)
---|---|---|---|---|---
SP| DFL| SPF| SP| DFL| SPF
SDWC15600| 6| 5 3⁄4| 2x (Face)| 210| 180| 120| 255| 195| 160
(2) 2x (Face)| 220| 200| 160| 240| 225| 190
- Allowable loads are shown at the wood load duration factor of CD = 1.0. Loads may be increased for load duration up to a CD = 1.6.
- Tabulated values must be multiplied by all applicable adjustment factors per the NDS.
- The reference withdrawal and pull-through values are in pounds per inch of the thread penetration into the main member and a minimum 1 1⁄2″-thick side member, respectively.
Quik Stik Rafter and Truss Fastening System Includes:
- Quik Stik fastening tool
- Sturdy carrying case (optional and also sold separately)
- Detachable/adjustable bubble level
- T30 6-lobe driver bit (replacement driver bit: BIT30TU-2-RC3)
- Limited lifetime warranty (Strong-Drive® SDWC Truss screws sold separately)
Quik Stik System
Product| Model No.
Quik Stik Rafter and Truss Fastening System| QUIKSTIK
Quik Stik Rafter and Truss Fastening System Case| QSCASE
Strong-Drive® SDWC Truss Screw
Size (in.) | Thread Length (in.) | Retail Pack | Mini-Bulk | |
---|---|---|---|---|
Coating | Fasteners per Pack | Retail per Master Carton | Model No. | Fasteners |
per Bucket | Model No. | |||
0.15 x 6 | 5 3⁄4 | Clear zinc with orange topcoat | 50 | 6 |
SDWC15600B-KT
The results are in: the new Strong-Drive® SDWC TRUSS Screw is another clear solution for fastening trusses and rafters to wall top plates. Featuring a fully threaded shank, the SDWC screw requires no predrilling, has a sharp tip for faster starts and countersinks flush for a smooth finish. The screw can be installedbefore or after sheathing is applied from inside the structure, which eliminates exterior work on the upper stories and increases job safety. SDWC Truss screws are sold with a matched-tolerance driver bit.
This flier is effective until December 31, 2022, and reflects information
available as of November 1, 2018.
This information is updated periodically and should not be relied upon after
December 31, 2022, Contact Simpson Strong-Tie for current information and
limited warranty or see strongtie.com. © 2018 Simpson Strong-Tie Company Inc.
• P.O. Box 10789, Pleasanton, CA 94588
800-999-5099
strongtie.com
F-F-QUIKSTIK18 11/18 exp. 12/22