acer V277 27 Inch Widescreen LCD Monitor User Guide
- June 2, 2024
- Acer
Table of Contents
acer V277 27 Inch Widescreen LCD Monitor
Safety Notice
Any person attempting to service this chassis must familiarize with the
chassis and be aware of the necessary safety precautions to be used when
serving electronic equipment containing high voltage
Important Safety Notice
Product Announcement:
This product is certificated to meet RoHS Directive and Lead-Free produced
definition. Using approved critical components only is recommended when the
situation to replace defective parts. Vender assumes no liability express or
implied, arising out of any unauthorized modification of design or replacing
non-RoHS parts. Service providers assume all liability.
Qualified Repairability:
Proper service and repair is important to the safe, reliable operation of all
series products. The service providers recommended by vender should being
aware of notices listed in this service manual in order to minimize the risk
of personal injury when perform service procedures. Furthermore, the possible
existed improper repairing method may damage equipment or products. It is
recommended that service engineers should have repairing knowledge,
experience, as well as appropriate product training per new model before
performing the service procedures.
NOTICE:
- To avoid electrical shocks, the products should be connect to an authorized power cord, and turn off the master power switch each time before removing the AC power cord.
- To prevent the product away from water or exposed in extremely high humility environment.
- To ensure the continued reliability of this product, use only original manufacturer’s specified parts.
- To ensure following safety repairing behavior, put the replaced part on the components side of PWBA, not solder side.
- To ensure using a proper screwdriver, follow the torque and force listed in assembly and disassembly procedures to screw and unscrew screws.
- Using Lead-Free solder to well mounted the parts.
- The fusion point of Lead-Free solder requested in the degree of 220°C.
Exploded Diagram
Wiring Connectivity diagram
Mechanical Instruction
Tools Required
List the type and size of the tools that would typically can be used to
disassemble the product to a point
where components and materials requiring selective treatment can be removed.
Tool Description:
- working table
- Screw-driver
- Knife
- glove
- cleaning cloth
- ESD protection
Assembly and Disassembly Procedures
Disassembly Procedure
Step. 1 Pull the base & neck assembly out
Step.2 Unscrew four screws
Step.3 Separate hooks between MID_FRAME and Rear cover
Step 4. Pull up the Rear Cover and pull out all connectors
Step.5 Unscrew screws on main shielding and disassemble AL tape
Detail AL tape location as below:
Step.6 Separate speaker from MID_FRAME and LVDS & Backlight FFC from LCM
Step.7 Unscrew two hex nuts and seven screws and remove main board PCBA from main shielding.
Step.8 Remove connecter cable and separate main board and power board, separate mylar and shielding
Step.9 Unscrew eleven screws and separate MID FRAME and panel
Step.10 Separate lens from MID frame
Step.11 Unscrew two screws and disassemble key board from rear cover and separate navi key& cable
Step.12 Separate wall-mount BKT and display key from rear cover
Step.13 Unscrew the screw and separate base & neck assembly
Step.14 Remove six silicon rubbers and unscrew seven screws to separate metal and plastic cover
Step 15. Separate back cover from neck, unscrew five screws and separate front cover from hinge assy.
Assembly Procedure
Step1. Assembly main board into shielding, use screw to fix. Assembly main board on LCM.
Step2. Insert 30 pin LVDS FFC to LCM, then use acetate cloth tape to tape FFC.
Step3. Lock the shielding on panel with screw. (in red circle)
Step4. Use Al tape to fix shielding (tape in blue circle).
Step5. Insert 10 pin back light FFC to panel and main board, use yellow tape to fix. (Tape in red circle).
Step6. Insert 10 pin back light FFC and 30 pin LVDS FFC to main board. Use yellow tape to fix.
Step7. Tape AL tape to fix FFC. (Tape in red circle).
Step8. Assembly middle frame with LCM and fix screw (in red circle)
Step9. Lock middle frame screw (in red circle)
Step10. If with speaker model, assembly speaker on middle frame, and assembly speaker cable on main board. (red and white cable is on left side, yellow and black is on right side.)
Step11. Tape speaker cable with acetate cloth tape (in yellow circle) and yellow tape (in blue circle)
Step12. Insert key board FFC on main board, B277 with USB hub model also need to insert USB FFC on main board.
Step13.Assembly rear cover, and push around the surrounding to assembly well.
Step14. Lock the screw on rear cover (in red circle).
Troubleshooting
Test flow for abnormal machine:
key debug flow:
Panel debug flow (bmipx &bmix&bip):
Panel debug flow (bi):
LED backlight debug flow:
FRU (Field Replaceable Unit) List
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>