EG4 Brightmount Fixed Angle Ground Mount System Installation Guide
- June 3, 2024
- Eg4
Table of Contents
EG4 Brightmount Fixed Angle Ground Mount System
PARTS DIAGRAM
DIMENSIONS AND LAYOUT
All measurements above are in millimeters.
INSTALLATION
Tools Needed
-
Glove
-
Power Tool
-
Crescent Wrench
-
Meter Rule
-
Drill 12.5 mm
-
Allen Wrench
-
Install leg group
Using a M8’80 bolt, M8 washers, M8 nut install the U45 connector as shown to the right. -
Install mounting bracket
Using M8’65 bolts, M8 washers and M8 nuts to connect the legs to the mounting bracket as shown to the left. -
Install ‘L’ foot
M8’65 bolt, M8 washers, and M8 nut to install the ‘L’ foot. -
Connect the mounting bracket to concrete anchor.
-
Use the expansion screws when mounting.
-
Follow these images for rail installation.
-
Connect the frames together using junction brackets, and M8 allen bolts.
-
Completed construction.
PV ATTACHMENT
- Install PV modules using the End & Mid clamps
- Install earth lug on the end of the rails.
www.eg4electronics.com
support@eg4electronics.com
Sulphur Springs. TX
October 2022
Rev A Specifications subject to change without notice
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>