EG4 Brightmount Fixed Angle Ground Mount System Installation Guide

June 3, 2024
Eg4

EG4 Brightmount Fixed Angle Ground Mount System

PARTS DIAGRAM

DIMENSIONS AND LAYOUT

All measurements above are in millimeters.

INSTALLATION

Tools Needed

  • Glove

  • Power Tool

  • Crescent Wrench

  • Meter Rule

  • Drill 12.5 mm

  • Allen Wrench

  • Install leg group
    Using a M8’80 bolt, M8 washers, M8 nut install the U45 connector as shown to the right.

  • Install mounting bracket
    Using M8’65 bolts, M8 washers and M8 nuts to connect the legs to the mounting bracket as shown to the left.

  • Install ‘L’ foot
    M8’65 bolt, M8 washers, and M8 nut to install the ‘L’ foot.

  • Connect the mounting bracket to concrete anchor.

  • Use the expansion screws when mounting.

  • Follow these images for rail installation.

  • Connect the frames together using junction brackets, and M8 allen bolts.

  • Completed construction.

PV ATTACHMENT

  • Install PV modules using the End & Mid clamps
  • Install earth lug on the end of the rails.

www.eg4electronics.com
support@eg4electronics.com
Sulphur Springs. TX
October 2022
Rev A Specifications subject to change without notice

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals