Allparts Equipment Accessories CAC-1120 Replacement Brass Kit Instruction Manual
- June 3, 2024
- Allparts Equipment Accessories
Table of Contents
Installation Instructions for CAC-1120B Replacement Kit
CAC-1120 Replacement Brass Kit
NOTE: To properly install the CAC-1120B Service kit fitting make sure to
clean the threads in the aluminum head of any debris from the previous
silicone sleeve.
The threads are not an exact fit… we do realize this but after the Loctite
cures we have never had a problem with the fitting coming loose
Step 1
Apply a liberal amount of the Loctite 271 Thread Locker to the brass
threads of the new fitting and to the thread of the aluminum head.
Step 2
Install the brass fitting into the aluminum head and tighten securely be
careful not to over tighten and damage the threads of either the brass fitting
or the aluminum head.
Step 3
Allow the Loctite 271 Thread Locker to cure for 24 hours! After the Loctite
271 has cured install the 3/8 Compression fitting and nut to the 3/8 aluminum
outlet pressure tube.
Step 4
Push the tube into the 3/8 fitting that was previously installed into the
head.
Step 5
While holding the outlet pressure tube firmly into the brass fitting, tighten
the 3/8” compression nut to the compression fitting.
www.allpartsinc.com
1-269-685-4123
customerservice@allpartsinc.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>