LENNOX NATURAL TO LP Gas Changeover Kit Instruction Manual
- June 4, 2024
- Lennox
Table of Contents
- LENNOX NATURAL TO LP Gas Changeover Kit
- Shipping and Packing List
- Requirements
- Application
- Installation
- KIT APPLICATION
- BURNER BOX ASSEMBLY -ZG 036-074
- BURNER BOX ASSEMBLY LGILD/KG 024-090
- BURNER BOX ASSEMBLY LGH 036, 048, 060, 074U
- RURNER BOX ASSEMBLY SG 036 & 060
- CONVERTING SINGLE STAGE GAS VALVE (Natural to LP)
- CONVERTING TWO & FOUR STG GAS VALVES
- CONVERTING TWO-STAGE GAS VALVE
- Install J/P19 Jumper Harness
- Start Up and Adjustment
- Identifying Unit As LP Converted
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
LENNOX NATURAL TO LP Gas Changeover Kit
WARNING
This conversion kit is to be installed by a qualified service agency in
accordance with the manufacturer’s instructions and all applicable codes and
requirements of the authority having jurisdiction. If the information in these
instructions is not followed exactly, a fire, an explosion or production of
carbon monoxide may result causing property damage, personal injury or loss of
life. The qualified service agency is responsible for the proper installation
of this kit. The installation is not proper and complete until the operation
of the converted appliance is checked as specified in the manufacturer’s
instructions supplies with the kit.
Shipping and Packing List
Package 1 of 1 contains
- 7 -Orifices 3 in 21Z24
- 1-Spring kit 2 in 21Z23 & 21Z25
- 1-Bag assembly containing:
- 3-Conversion plates 1 in 21Z25
- 1-Conversion sticker
- 1-Acrylic sheet
- 1-J/P19 harness 21Z23 & 21Z24 only
Requirements
This conversion kit shall be installed by a qualified service agency. A qualified service agency is any individual, firm, corporation or company which either in person or through a representative is engaged in and is responsible for the connection, installation, repair or servicing of gas utilization equipment or accessories, who is experienced in such work, familiar with all precautions required, and has complied with all the requirements of the authority having jurisdiction. Canadian installations only – The conversion shall be carried out in accordance with the requirements of the Provincial authorities having jurisdiction and in accordance with the requirements of the CAN/CGA-B149.1 and .2 Installation Code.
WARNING
Improper installation, adjustment, alteration, service or maintenance can
cause property damage, personal injury or loss of life. Installation and
service must be performed by a licensed professional installer (or
equivalent), service agency or the gas supplier.
Application
The LP/propane gas changeover kit is required for gas conversion as shown in table 1. The 10th character on the unit nameplate determines the type of gas valve. For example, ZGA060S4BH1G would contain a two stage, high heat gas valve.
Installation
- Turn main manual shut-off valve off and turn off electrical supply to unit.
- Set thermostat to Off position.
- Open access panels.
- On LG/LD/KG/SG units, remove the mullion between the heat and compressors sections.
KIT APPLICATION
CAUTION
As with any mechanical equipment, personal injury can result from contact with
sharp sheet metal edges. Be careful when you handle this equipment.
IMPORTANT
The gas supply shall be shut off prior to disconnecting the electrical power, before proceeding with this conversion. Remove and retain four screws securing manifold to burner box; remove manifold. Remove orifices from manifold and install the orifices provided in kit. Unit will have 3, 5, or 7 burners. Replace only the orifices which have a burner installed. On four stage units only, the two left orifices are 0.050 and the right five orifices are 0.052 for proper orifice placement.
CAUTION
Tighten orifices with pipe threads to 6.25 ft lbs. Do not overtighten.
IMPORTANT
Do not use thread compound on gas orifices 5.Replace the manifold and secure
with retained Screws. Install spring kit for single stage gas valves, for two-
stage and four- stage White Rodgers gas valves for two-stage Honeywell gas
valves. Also refer to the manufacturer’s instructions provided with spring
kit. When installing 21Z23 kit, discard the unused spring kit.
BURNER BOX ASSEMBLY -ZG 036-074
BURNER BOX ASSEMBLY LGILD/KG 024-090
BURNER BOX ASSEMBLY LGH 036, 048, 060, 074U
FOUR STAGE HEAT
RURNER BOX ASSEMBLY SG 036 & 060
CONVERTING SINGLE STAGE GAS VALVE (Natural to LP)
- Remove regulator cap screw and pressure regulator adjusting screw.
- Remove existing spring.
- Insert replacement spring.
- Install the new plastic pressure regulator adjustment screw so that the top of the screw is flush (level) with the top of the regulator.
- Turn the pressure regulator adjusting screw clockwise six complete turns.
- This adjustment provides a preliminary pressure setting of about 10.5 w.c. (2.6 kPa) for the LP regulator.
- Check regulator setting either with a manometer or by clocking the gas meter.
- Reinstall cap screw.
CONVERTING TWO & FOUR STG GAS VALVES
White Rodgers Natural to LP/Propane
- Remove both high fire and low fire springs from the gas valve.
- Replace both high fire and low fire springs with the provided LP springs color-coded white.
- Install the high fire adjustment screw and adjust approximately 12 turns.
- Install the low fire adjustment screw and adjust approximately 8 turns.
- Install both regulator screw covers.
CONVERTING TWO-STAGE GAS VALVE
Honeywell Natural to LP/Propane
- Turn off the gas supply to the unit.
- Remove the pressure regulator cover assembly. See the gas valve illustration below.
- Remove the existing stem/spring assembly.
- Insert the replacement stem/spring assembly.
- Replace the pressure regulator cover assembly and tighten the screws.
- Apply the conversion label to the gas control.
Install J/P19 Jumper Harness
Two Stage Gas Valves Only
- Locate J19/P19 combustion air blower connectors in divider panel between heat and compressor sections.
- Disconnect J19/P19 3- Install kit harness between disconnected plugs.
Start Up and Adjustment
- Replace heat section access panels and mullion.
- Close heat section access panel.
To place unit in operation
- Turn main manual shut-off valve on.
WARNING
Danger of explosion
Can cause injury or death. Do not attempt to light manually. has a direct spark ignition system nit.
- Wait five minutes, then open manual knob on gas valve and replace compressor access panel.
- Restore electrical supply to unit and set fan switch to Auto or On.
- Move system selection switch to Heat and adjust thermostat setting above room temperature.
- The combustion air blower will start and bummers will light within 40 seconds.
- If burners do not light first time gas line not fully purged ignition system will attempt to light two more times before locking out gas valve operation.
To shut down unit operation
- Set thermostat selection switch to Off position, remove heat control access panel and turn manual knob on gas valve to Off position.
- Replace heat control access panel.
Heating Adjustment
Check gas line pressure with unit firing at maximum rate. A minimum of 10.8” w. c. and a maximum of 13.5” w. c. should be maintained. Manifold pressure is preset as shown on the appropriate conversion label provided in this kit. No adjustment should be necessary. On multiple unit installations, each unit should be checked in sequence be ginning with the one closest to the supply gas main and progressing to the one furthest from the main.
Identifying Unit As LP Converted
Locate 580207-04, -05, and -08 conversion plate labels provided in kit. Select the appropriate label and discard the other two labels.
Note
21Z25 kits have one conversion plate; there are no further labels to discard.
- Make a check mark in the appropriate box on the conversion plate corresponding to unit model number shown on nameplate.
- Affix appropriate conversion plate near unit nameplate.
- Complete installer information on converter sticker and affix to vestibule panel.
- Affix acrylic sheet over converter sticker.