REMORAN WAVE 3 300W Hydrogenerator Instruction Manual
- June 3, 2024
- REMORAN
Table of Contents
- REMORAN WAVE 3 300W Hydrogenerator
- Connection illustration
- Outboard unit and charger components
- Rail installation
- Mounting the turbine
- Charger installation
- Connecting the cables
- Adjustments before operation
- Attaching the outdoor unit to the rail
- Charger installation guide
- Remoran Oy
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
REMORAN WAVE 3 300W Hydrogenerator
Read the entire operating instructions carefully before using the hydro generator. The instructions can be found on our website: www.remoran.eu
Connection illustration
- Install the rail on the boat
- Attach the turbine to the outboard unit
- Install the charger in a dry place
- Drill the feedthrough for the cable and install the connectors
- Install the generator cable to the charger
- Install the charging cables in the charger (Be sure to install a fuse and a ferrite filter)
Outboard unit and charger components
Outboard unit components
- Angle adjustment knob
- Angle guide
- Locking handle
- Frame
- Generator cable
- Telescopic blade
- Locking pin and cotter
- Generator
- Turbine
Charger components
- Cooling profile
- Charging wire (pos.)
- Charging wire (neg.)
- Screw terminals of the generator wires
- Bluetooth® wireless connection indicator
- Charger’s LED indicator
- Plastic cover
- Fastening slots (4 pcs)
The Bluetooth® word mark and logos are registered trademarks owned by Bluetooth SIG, Inc. and any use of such marks by Remoran Oy is under license.
Rail installation
- Mounting parts
- Mark the locations of the holes
- Drill the holes Ø 8 mm
- Slide the bolts into place
- Add Sealant
- Place the rubber mat on the rail
- Insert the rail
- Apply sealant around the bolts on the inside
- Place the reinforcement plate, rubber washers, washers and nuts on top of the bolts and tighten
Mounting the turbine
- Slide the turbine onto the shaft
- Insert the screw and washers and tighten
- When the turbine has been installed correctly, there is a gap of ~3mm between the turbine and the generator
Charger installation
- Select the lenght of the screws according to the thickness of the base
- Mark the location of the charger in a dry place with the help of the included stencil
- Screw on the charger. Space must be left around the charger for cooling
Installing the cable feedthrough
- A feedthrough is made to the transom of the boat for the connector (1)
- Drill a hole for the connector in the transom
- Insert the cable through the hole and insulate the feedthrough with sealant
- Fasten the connector with two wood screws
Connecting the cables
- The numbered wires should be connected to the corresponding numbered screw terminals of the generator connection of the charger
- Carefully connect the charging wires to the appropriate apertures with the + and – wires in their appropriate locations
Adjustments before operation
- Detach the locking pin cotter and pull out the pin to adjust the blade to a suitable height
- Lock the blade by securing the pin and locking pin cotter back in place
- We recommend to use a safety rope
- Do not tie the safety rope to the locking handle
Attaching the outdoor unit to the rail
- Lift the locking handle to the top position
- Slide the outboard unit down the frame along the rail
- Lock the outboard unit to the rail by pushing the handle down to the bottom position
- To adjust the angle, first press the angle adjustment knob so that its bottom rises.
- Then slide the knob along the angle guide to a desired position
- The angle of the outboad unit should be perpendicular to the surface of the water
- Connect the cable connector to the feedthrough connector installed in the boat
- The device is ready for use! Charging starts automatically when the turbine starts rotating
Charger installation guide
Scale
Remoran Oy
- Harventajankuja 3, FI-24130 Salo, Finland
- www.remoran.eu
- info@remoran.eu
References
Read User Manual Online (PDF format)
Loading......