LEZYNE Y15-HP Digital Hand Pump User Guide

June 4, 2024
Lezyne

LEZYNE Y15-HP Digital Hand Pump User Guide

LEZYNE Y15-HP Digital Hand Pump

  1. Remove hose from pump handle
  2. thread or slip hose onto open Presta valve, thread opposite end of hose onto pump
  3. Pump to inflate
  4. Use ABS to release hose pressure/ease valve removal

FIG 1 Overview

FIG 2 Overview

To reset the gauge: TURN THE PUMP ON FIRST, then press and hold the power buon for 10 seconds. The gauge will turn off and on during this process, do not let go of the buon unl the gauge turns on again.

For more info go to: www.lezyne.com/support.php

Lezyne USA, 645 Tank Farm Rd., Unit F, San Luis Obispo, California 93401

Read More About This Manual & Download PDF:

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals