Newport OTS-INT-VIS Overhead Shelf User Guide

September 26, 2024
NEWPORT

OTS-INT-VIS Overhead Shelf

Product Information

Specifications:

  • Model: Overhead Shelf (OHS)
  • Compatible with: OTS/INT and VIS tables
  • Mounting Options: Table-mounted or Free Standing
  • Additional Feature: Power Strip Installation compatibility

Product Usage Instructions

Table-Mounted OHS Shelf Installation

  1. Determine desired location based on clearance and accessibility
    needs.

  2. Position the vertical supports in front of the mounting holes
    and loosely install them to the frame.

  3. Lift the shelf assembly with assistance and attach it to the
    vertical supports using appropriate hardware.

  4. Tighten all connections securely.

Free Standing OHS Shelf Installation

  1. Attach leveling feet to the bottom of vertical supports.

  2. Position the supports at the ends of a table.

  3. Lift the shelf assembly with assistance and attach it to the
    vertical supports using appropriate hardware.

  4. Ensure all connections are tightened securely.

Power Strip Installation

Power strips can be mounted to the overhead shelf using the
provided hardware.

  • OHS-PS-US for US version: Mount via (4X) M4x0.7 holes on the
    shelf brace.

  • OHS-PS-FR for France, OHS-PS-DE for Germany, OHS-PS-UK for
    United Kingdom, OHS-PS-IL for Israel: Mount via (4X) M6x1.0
    threaded holes.

Frequently Asked Questions (FAQ)

Q: Can the overhead shelf support heavy items?

A: The overhead shelf is designed to support a certain weight
limit. Please refer to the product specifications for weight
capacity details.

Q: Are additional mounting hardware included with the

product?

A: The necessary mounting hardware for standard installations is
included. Specific additional hardware may need to be purchased
separately based on installation requirements.

Overhead Shelf Installation Quick Guide
OTS/INT/VIS Table-mounted OHS Shelf Installation
The table-mounted shelf for OTS/INT and VIS can attach at three locations (only one for OTS/INT 3ft (900mm) version along the depth of the frame. Determine your desired location based upon clearance and accessibility needs and inspect those mounting holes prior to installation.
1. Position the vertical supports in front of the mounting hole location and use fasteners to install the supports to frame. At this point, install but do not fully tighten down.
2. Have a colleague assist with lifting the shelf assembly into position and attachment hardware to fasten shelf to the vertical supports. Make sure all connections are secure by tightening down the bolts.

OHS-OTS-X on OTS/INT OHS-VIS-XX on VIS

1 of 3

Free Standing OHS Shelf Installation
1. After removing the vertical supports from crate, attach (3) leveling feet at the bottom of each of the supports. Then position the them at the ends of a table as shown on the picture.
2. Have a colleague assist with lifting the shelf assembly into position and attachment hardware to fasten shelf to the vertical supports. Make sure all connections are secure by tightening down the bolts.

OHS-XX with optical table supported by S-2000A isolators

2 of 3

Power Strip Installation
Power strips may be purchased separately and mounted directly to an overhead shelf using provided hardware. OHS-PS-US the power strip version for US is mounted via (4X) M4x07 holes on the shelf brace
OHS-PS-FR for France, OHS-PS-DE for Germany, OHS-PS-UK for United Kingdom, and OHS-PS-IL the Israel version are mounted via (4X) M6x1.0 threaded holes.
3 of 3

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals