HBEZON B0CM8T1L7G Round corner Mirror Door Built In Mirror Cabinet Installation Guide
- September 28, 2024
- HBEZON
Table of Contents
- HBEZON B0CM8T1L7G Round corner Mirror Door Built In Mirror Cabinet
- Specifications
- FAQs
- IMPORTANT SAFETY INSTRUCTIONS
- ELECTRIC CONNECTIONS
- HARDWARE AND TOOLS ( Tools not included)
- INSTALLATION INSTRUCTIONS
- SURFACE MOUNT INSTRUCTION
- INTRODUCTION OF TOUCH FUNCTION
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
HBEZON B0CM8T1L7G Round corner Mirror Door Built In Mirror Cabinet
Specifications
- Power Requirement: 120 VAC 20 Amp GFI protected Circuit
- Grounding: Must be connected to a grounded metal permanent wiring system
FAQs
- Q: Can I use this product outdoors?
- A: No, this product is not intended for outdoor use.
IMPORTANT SAFETY INSTRUCTIONS
When using an electrical furnishing, basic precautions should always be followed, including the following:
WARNING: To reduce the risk of burns, fire, electric shock, or injury to persons. Use this furnishing only for its intended use as described in these instructions. Do not use attachments not recommended by the manufacturer. Never drop or insert any object into any opening. Do not use outdoors.
WARNING: Risk of electric shock. Connect this furnishing to a properly grounded circuit only. See grounding instructions.
ELECTRIC CONNECTIONS
ALL WIRING SHOULD BE DONE BY A QUALIFIED LICENCED ELECTRICIAN.
WARNING: Shut off power before wiring. Requires 120 VAC 20 Amp GFI protected Circuit.
GROUNDING INSTRUCTIONS:
- CAUTION: This product must be connected to a grounded metal permanent wiring system or an equipment-grounding conductor must be run with the circuit conductors and connected to the equipment grounding terminal or lead on the product.
- WARNING: An Electrical option mirror must be wired to a 20 Amp GFI(Ground Fault Interrupter) protected circuit when used in bathrooms and all other locations required by the National Electric Code.
HOW TO CONNECTIONS
HARDWARE AND TOOLS ( Tools not included)
INSTALLATION INSTRUCTIONS
APPLY TO THE BELOW STYLE OF LED MEDICINE CABINET
- Please read carefully and save these instructions
- Don’t discard any of the packaging until you are sure that you have all of the parts and the fittings
- Make sure the power to the junction box is off before commencing installation.
IMPORTANT
- Unpack the LED cabinet. DO NOT lay cabinet on tiled or concrete surface before installation Cabinet must be on a protected surface to prevent chipping of the corners
- Care must be taken before drilling pilot holes to avoid any existing wiring or pipe work that may be concealed.
- A certified electrician must perform all work. The mirror must be connected to a GFI
MAINTENANCE
- Wipe clean with a soft damp cloth. Apply glass cleaner to the cloth and do not apply directly to the mirror
- Never use abrasive cleaners as these could damage the finish or exposed LEDstrip 2
INSTALLATION
- Please refer to below surface mount or recess mount method below.
SURFACE MOUNT INSTRUCTION
RECESS MOUNT INSTRUCTIONS
NOTE: Rough opening is not an exact measurement. The extra space allows the cabinet to be inserted into the opening. Add shims to level and tighten space if necessary. Additional framing might be required.
Rough Wall Opening
Overall Size | Rough Wall Opening |
---|---|
20 in.(W) x 28 in.(H) x 5 in.(D) | 19-1/4 in.(W) x 22-7/8 in.(H) x 3-7/8 in.(D) |
24 in.(W) x 36 in.(H) x 5 in.(D) | 23-1/4 in.(W) x 30-7/8 in.(H) x 3-7/8 in.(D) |
36 in.(W) x 36 in.(H) x 5 in.(D) | 35-1/4 in.(W) x 30-7/8 in.(H) x 3-7/8 in.(D) |
48 in.(W) x 36 in.(H) x 5 in.(D) | 47-1/4 in.(W) x 30-7/8 in.(H) x 3-7/8 in.(D) |
60 in.(W) x 36 in.(H) x 5 in.(D) | 59-1/4 in.(W) x 30-7/8 in.(H) x 3-7/8 in.(D) |
- Step 1
- NOTE: Before cutting the rough opening, check for pipes, electrical cables, or heating ducts. If it is required to remove part of the stud, make sure that the wall is not a load-bearing wall.
- Prepare the opening in the wall for the cabinet body. Make sure that there is support on both sides of the opening to attach the cabinet body, as shown.
- NOTE: The cabinet height should be a minimum of 2 in. above the faucet.
- Step 2
- Connect the hardwire to the power line. Make sure the power is off (Voltage: AC110-12V,50/60Hz)
- Step 3
- Position the cabinet body in the rough wall opening. Make sure that the cabinet body flange covers the wall opening uniformly.
- Secure both sides of the cabinet body to the wall supports using mounting screws.
- NOTE: The cabinet body must be level for the door to work properly.
- Step 4:
- As for the shelf and cabinet door installation and adjustment.
INTRODUCTION OF TOUCH FUNCTION
- Click the power button to turn the light ON/OFF.
- Long press the button to make the light gradually dim Long press the button again and the light gradually brightens.
- Click this button to turn the defogger ON/OFF.
- Click to switch the color temperature of light by 3000k-4000k-6000k.
- Time & Room Temperature Display: Time and room temperature auto switch every 8-10 seconds.
- Clock Setting: Long press the defogger button first.
- Short press: The clock setting ‘hour – minute – Fahrenheit/celsius’ switches in a cycle, and the corresponding hour/minute/Fahrenheit/celsius of the digital number will blink.
- Long press: Save the clock Settings, exit the clock setting state, return to the normal display state.
- Short press: clock hour/minute adjustment reduced.
- Short press: clock hour/minute adjustment increase.
- A – Width
- B – Height
- C – Depth
- Unit: Inch
SKU# A | B | C |
---|---|---|
Aura-2028SL-L | 20 | 28 |
Aura-2028SL-R | 20 | 28 |
Aura-2436SL-L | 24 | 36 |
Aura-2436SL-R | 24 | 36 |
Aura-3636SL-D | 36 | 36 |
Aura-4836SL-D | 48 | 36 |
Aura-6036SL-T | 60 | 36 |
Note: All dimensions & specifications are approximate and subject to change without notice.
Customer Service:
For any questions or queries regarding our products, please contact our support team:
- Email:cs@hbezon.com.
- Website:www.hbezon.com.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>