heater shop A-FRM1195B Blue Satin Towel Rail Installation Guide

June 3, 2024
heater shop

A-FRM1195B Blue Satin Towel Rail
Installation Guide

A-FRM1195B Blue Satin Towel Rail

This product must be fitted only by a fully qualified installer.

DESCRIPTION


RADIATOR x 1

END PLUG x 1

|

RADIATOR BRACKETS x 4

---|---

AIR VENT x 1

|

WALL ANCHORS x 4

|

RAD. SCREWS x 4

DESCRIPTION ILLUSTRATION
Fixing choose the appropriate fixing for the wall material if required
PTFE tape
Electric drill
Masonry drill bit appropriateto the fixings
Adjustable spanner
Radiator valve hex key
Flat head and philips head screw drivers
1 lock shield valve and 1 gate or thermostatic valve
Spirit level
Measuring tape

GENERAL RECOMMENDATION

  • Before fitting the radiator it is necessary to wash out the heating system to remove any existing mud, scale, work residues, traces of flux, oil, etc.
  • When the system water pH is outside the 5,5-8,5 range and/or when the dissolved is above 0,1mg/liter, it is always needed to protect the heating system components (the radiator is one of these) with a proper chemical treatment compatible with all parts in contact with water (silicon rubber too).
  • In order to fit the radiator to the wall, it is necessary to choose the proper fixings for the wall material.
  • If the system water exceeds 50°C, please install a warning mark near the radiator to avoid any accidental scalding.
  • Maximum working temperature 95°C, maximum working pressure 4 bar.
  • Clean the radiator surface only with a soft cloth to avoid scratching the finish and do not use chemical agents during cleaning operations. It is prohibited to climb on the radiator.

heater shop A-FRM1195B Blue Satin Towel Rail - fig18

1 RADIATOR
2 RADIATOR BRACKET
3 WALL SCREW
4 WALL ANCHOR
5 WALL
NAMES A
--- ---
FERMO 710
FERMO 1190
FERMO 1550

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals