FU1013CABDVUPBT Ecosoft Pink Softeners Instruction Manual

September 23, 2024
ecosoft

FU1013CABDVUPBT Ecosoft Pink Softeners

“`html

ECOSOFT PINK SOFTENERS

Specifications

Dimensions:

  • FU1013CABDVUPBT: 469 x 387 mm
  • FU1016CABDVUPBT: 539 x 457 mm
  • FU1024CABDVUPBT: 741 x 659 mm

Technical Specification:

Parameter FU1013CABDVUPBT FU1016CABDVUPBT FU1024CABDVUPBT
Operating/maximum flow rate, m3/h 1.0/1.2 1.3/1.5 16/18

Product Usage Instructions

1. Safety Precautions

Before starting work with the water softening system,
ensure:

  • Use an adapter or battery supplied with the equipment.

  • Check compatibility of power supply unit with local power
    supply network.

  • Use 230V, 50Hz input voltage for connection.

  • Avoid touching live parts to prevent electric shock.

2. Installation Process

To install the softener:

  1. Prepare the installation site as per the manual.
  2. Follow the installation diagram provided.
  3. Connect the water inlet, outlet, drain outlet, and brine inlet
    as instructed.

FAQ

Q: What should I do if I encounter a water leak after

installation?

A: If you notice a water leak, immediately turn off the water
supply to the softener and check all connections for tightness. If
the issue persists, contact our service center for assistance.

“`

MANUAL FOR ECOSOFT PINK SOFTENERS

MANUAL FOR ECOSOFT PINK SOFTENERS 2
CONTENTS

1. Introduction

3

1.1 General provisions

3

1.2 Manufacturer

3

1.3 Safety rules

3

2. Technical data

5

2.1 Dimensions

5

2.2 Pink series

6

3. Product package

7

4. Preparation of the installation site

8

5. Procedure for installing softeners

8

5.1 Optional equipment

9

6. Quick Set Up Guide

11

7. Installation diagram

16

8. Service

17

8.1 Maintenance work

17

8.2 User responsibility

17

8.3 Service and spare parts

17

8.4 Disposal

17

9. Troubleshooting

18

10. Guarantee

20

11. Serial information

21

This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 3
1. INTRODUCTION
1.1 GENERAL PROVISIONS Filter installation should be carried out by a specialist with appropriate qualifications and experience. Children aged 8 years and older, as well as people with limited physical, sensory and mental abilities, with the lack of necessary knowledge and experience to use this device, they can use softener only under supervision and in compliance with the specified data security rules equipment and understand the hazards involved. Cleaning and user maintenance shall not be made by children without supervision. Do not allow children to play with the device! If the softener is not used for a long time used: If you do not plan soon sometimes use the equipment (for example, during holidays) put it in bypass mode and turn it off it from the water supply network. For this it is necessary move the three taps to the opposite position (according to the installation section of this manual softener); or carry out the necessary procedures for using the Multiblock block (depending on what you are the one using it). If the installation has not been used for a long time, we recommend softener regeneration in manual mode, in accordance with Section 4.2. given instructions Protection against extreme temperatures: Do not install the softener where it is joining it (including drainage pipes and overflow hose) can be exposed to temperature below 5 °C or above 40 °C.

1.2 MANUFACTURER
ECOSOFT 22 BV Leuvensesteenweg 633, 1930, Zaventem, Belgium

ECOSOFT SPC LTD 1, Pokrovska Str., 08203, Irpin,
Ukraine

1.3 SAFETY RULES
Electrical safety — we ask you use an adapter or battery (option) supplied with equipment before using the device, check compatibility of the technical characteristics of the power supply unit with characteristics of the local power supply network.
A 50 Hz 230 V input voltage must be used to connect the water softener.

ELECTRIC SHOCK!

Danger to life due to electric shock.
Work with electrical equipment is allowed only to authorized service centers or qualified electricians who have been instructed.

This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 4
1. INTRODUCTION
TOUCHING LIVE PARTS CAN LEAD TO ELECTRIC SHOCK.
When carrying out service work with the control valve of the softener, turn off the power supply from the outlet. The power cord cannot be replaced. If the power cord is damaged, the appliance should not be used. If the power cord is damaged, please ask consultation with a qualified electrician. In the event of a power outage during regeneration, ensure the draining of wastewater into the drain. So BE SURE to connect to a softener overflow hose and drainpipes and connect them to suitable for this drainage / sewage system to avoid spillage of water in the room. Warning: Do not use aggressive detergents. Wipe contaminated surfaces dry with a damp cloth. Maintenance: When carrying out installation and technical works maintenance and repair of the softener isolate it. To make the softener last longer maintained good work results, necessary regularly carry out service work service. In more detail you can find out about it by contacting the nearest one partner service organization of the Ecosoft company.
PIPELINES OF WATER SOFTENING SYSTEMS ARE UNDER PRESSURE.
Before starting work with water softening systems, it is necessary to eliminate the pressure in the water supply. Opening threaded connections or taps can cause injury! Unauthorized modification or changes to the system design may adversely affect the safety of people and the operation of the system.
This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 5
2. TECHNICAL DATA
2.1 DIMENSIONS

469 387

539 457

741 659

270 78
430

Model FU1013CABDVUPBT FU1016CABDVUPBT FU1024CABDVUPBT

Control valve port sizes (port height, mm)

Water Inlet

Water Outlet

Drain Outlet

1 (540)

1 (540)

¾ (640)

1 (970)

1 (970)

¾ (1070)

1 (970)

1 (970)

¾ (1070)

Brine Inlet CF (640) CF (1070) CF (1070)

This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 6
2. TECHNICAL DATA

2.2 PINK SERIES Technical specification:

Parameter

FU1013CABDVUPBT FU1016CABDVUPBT FU1024CABDVUPBT

Operating/maximum flow rate, m3/h

1.0/1.2

1.3/1.5

16/18

Quantity of media, L

10

15

20

Volume capacity, m3 250 mg/L CaCO influent hardness

2

3

5

3

Usage of salt per regeneration, kg

0.8

1.2

1.6

Usage of water per regeneration

(discharge per regeneration), m3

0.08

0.09

0.1

Duration of regeneration, minutes

80­110

Pressure drop in service mode, bar

0.5

Inlet pressure, bar

2­6

Electrical requirements

230 V, 50 Hz

Power consumption, W

30

Inlet/outlet pipe connections

3/4

Dry weight, kg Overall dimensions, (Width × Depth × Height), mm

18.8 270 430 469

22.2 270 430 539

32.5 270 430 741

Influent water limitations:
Hardness Iron Manganese Chemical Oxygen Demand Sediment prefilter rating Temperature of water

750 mg/L CaCO 3 0.2 mg/L 0.05 mg/L 5 mg/L O 2 100 m
+4…+30 °C

This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 7
3. PRODUCT PACKAGE
Ecosoft fabric softener comes in kit with the following parts and blocks:

a) Softener body assembly (includes pressure tank with media inside, Clack DV control valve)

MANUAL FOR ECOSOF T PIN K SOFTENER S

b) Cnnection kit

c) Plug connector for connection to power grids (EU)

d) Equipment manual

This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 8
4. PREPARATION OF THE INSTALLATION SITE
· Installation area must meet all relevant building code. Water and power supply, and ambient conditions must meet Specification requirements of this manual.
· Observe all local plumbing and electrical code when connecting system to utilities.
· Install check valve when connecting the filter to water mains. Install second check valve after the system to prevent back flow.
· Particles such as sand, scale or rust can damage the control valve. Install a point-of-entry sediment filter.
· Equip the system with sampling taps and pressure gauges as shown on drawings. It will help in case any maintenance or troubleshooting is necessary.
· Install a vacuum relief valve as shown if there is a booster pump downstream of Ecosoft filter. The FRP tanks may implode if subjected to negative pressure.
· If your system does not include bypass valve assembly, run a bypass pipeline along the entire system. This may be necessary for diagnostics and maintenance.
5. PROCEDURE FOR INSTALLING SOFTENERS
If your cabinet was delivered pre-loaded with media, place the cabinet in the installation spot, fill salt compartment with salt pellets, and then only carry out steps 5 ­ 8 of the procedure, skipping steps 1 ­ 4. If the resin was shipped in bag, then carry out all of the following steps.
1. Disconnect the flexible tube from brine inlet of the control valve. Unmount the valve by screwing it counterclockwise.
2. Put a plug or cap on the top end of the riser pipe to prevent getting any media inside the pipe. Pour the media in the tank using the funnel. When loading the tank, keep riser pipe vertical. If the pipe tilts, restore it to straight vertical direction. When finished, rinse the thread of tank opening with water to remove any beads of media stuck in the groove.
3. Mate the top distributor with the top end of riser pipe, then screw control valve in the tank opening. Connect the free end of brine tube back to the brine inlet of the control valve.
4. Place the cabinet in the installation spot. Open top lid and fill the salt compartment with softener salt pellets at least half full.
5. Connect drain pipe to the male threaded drain outlet of the control valve. Run the drain pipe to floor drain or gravity drain pipe socket. Secure the drain pipe end above the receiving fixture with at least 1 air gap.
6. Mount the pipe thread elbow adapters to the control valve’s In and Out ports and tighten the coupling nuts. Do not put any mechanical load on fittings or use them to support pipes.
Connect the system to water supply and downstream pipework without turning on the water supply. Do not confuse In and Out ports. They are embossed with direction arrows.
This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 9
5. PROCEDURE FOR INSTALLING SOFTENERS

7. Remove the front panel by pulling the locking tabs on the left and right side. Run the power cord through the cord guide in the control valve’s backplate and connect it to 12 VAC socket on the circuit board. Plug the power supply in the mains to power up the system.
8. Start manual regeneration of the system. Scroll regeneration to backwash if it isn’t the 1st step of the sequence. When the control valve starts the backwash, turn on mains water supply slightly at first. Air will be displaced from the system via drain line while the pressure tank is being filled with water. When the tank is full, water will start flowing down the drain line. At this point, fully
open mains water supply.
Let the system complete regeneration, then perform one more manual regeneration.

5.1 OPTIONAL EQUIPMENT
Softening systems can be additionally equipped with a Clack or Multiblock bypass valve. The Clack bypass valve is attached directly to the inlet and purified water pipes and has 4 operating modes, listed below:

NORMAL OPERTION

BYPASS OPERTION

“TREATED” WATER EXIST

SUPPLY WATER ENTERS

SUPPLY WATER EXIST

SUPPLY WATER ENTERS

DIAGNOSTIC MODE

SUPPLY WATER EXIST

SUPPLY WATER ENTERS

SHUT OFF MODE
NO WATER SUPPLY WATER IS SHUT EXIST OFF FROM THE HOUSE AND THE VALVE

This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 10
5. PROCEDURE FOR INSTALLING SOFTENERS
The multiblock performs a bypass function, is equipped with a sampler and has 2 modes of operation:

Open position — Supply via softener/limescale protection system: handwheel in UPPER position (stop)

Bypass position — Supply via softener/ limescale protection system: handwheel in LOWER position (stop)

For flushing the household water system

Overflow hose of

a household water

2

softening system

1

90

H

DN 40

90°

90°

For connection to the drainage system

Place the fitting of the overflow hose (1) at least 20 mm below the height of the safety overflow of the domestic water softening system. Fix vertically with the bracket (H).
Connect the flush water hose with a downward slope to the fitting (2) and insert to a depth of approx 90 mm.
Connect the overflow hose from the brine tank to the fitting (1) and fix with a hose clamp.
The flush water hose and the overflow hose mustnt be connected and mustnt have narrowing in the cross section.

This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 11
6. QUICK SET UP GUIDE After installing and powering up an Ecosoft FU or FK system,set display language, water hardness, current time, and regeneration options in the Installer menu of control valve. Use and buttons to change setting; NEXT button to save and go to next step; CLOCK to save and exit menu; REGEN to move back one step. To proceed, hold NEXT and buttons simultaneously for 3 seconds.
STEP 2I. Hardness: Set the amount of hardness as calcium carbonate per PPM, using or . Press NEXT to go to Step 4I. Press REGEN to exit Installer Display Settings
STEP 3I. Service Water Hardness (PPM): If a mixing valve is installed in the valve, service hardness needs to be set. Setting range is always less than the setting in Step 2I. This screen will only appear if Step 4S is set to rES. Press NEXT to go to Step 4I. Press REGEN to return to previous step.
STEP 4I. Set Day Override to 1 ­ 28 days or OFF using or . Press NEXT to go to Step 5I. Press REGEN to
return to previous step.
This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 12
6. QUICK SET UP GUIDE STEP 5I. Time of Regeneration, Hour: Set the time (hour) for regeneration using or . The default time is 2:00 a.m. This display will show on 0 if Step 4S or Step 3F is set to on 0. Press NEXT to go to Step 6I. Press REGEN to return to previous step.
STEP 6I. Time of Regeneration, Minutes: Set the time (minutes) for regeneration using or . The default time is 2:00 a.m. This display will not appear if Step 4S or Step 3F is set to on 0. Press NEXT to go to Step 7I. Press REGEN to return to previous step.
STEP 7I. Backlight Operation: Set the normal activity of the LCD backlight using or . If value is set to: · On, the backlight is always on. · Off1, the backlight turns off after 5 minutes of no activity. · Off2 + l/min, the backlight turns off after 5 minutes of no activity except with water flow
detection. Press NEXT to exit Installer Settings. Press REGEN to return to previous step.
NORMAL MODE
This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 13
6. QUICK SET UP GUIDE
To change the factory settings, press the and NEXT buttons at the same time. Use and buttons to change setting; NEXT button to save and go to next step; CLOCK to save and exit menu; REGEN to move back one step.
To proceed, hold NEXT and buttons simultaneously for 3 seconds.
STEP 2S. Set System Type to SOFT using or . Press NEXT to go to Step 3S. Press REGEN to exit OEM System Setup.
STEP 3S. Select Hardness Unit using or . If value is set to: · P, the unit will be PPM. · FH, the unit will be °fH. · dH, the unit will be °dH. Press NEXT to go to Step 4S. Press REGEN to return to previous step.
STEP 4S. Select Regeneration Type using or . If value is set to: · rES, regeneration will be delayed with variable
reserve until the time of day set inStep 5I and Step 6I. · dELY, regeneration will be delayed until the time of
day set in Step 5I and Step 6I. · on 0, regeneration will occur immediately when capacity
remaining reaches zero. Press NEXT to go to Step 5S. Press REGEN to return to previous step.
This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 14
6. QUICK SET UP GUIDE
STEP 5S. If Step 4S is set to rES, set Ionic Capacity using or . If Step 4S is set to dELY or on 0, set Volume Capacity. Volume Capacity can be set to 0.02 m3 ­ 5700 m3 or OFF. Press NEXT to go to Step 6S. Press REGEN to return to previous step.
STEP 6S. Set Fill Type to POST or PrE using or . Press NEXT to go to Step 7S. Press REGEN toreturn to previous step.
STEP 7S. Set Regenerant Draw Typeto dn or UP using or . Press NEXT to go to Step 8S.Press REGEN to return to previous step. Note: The following displays can differ depending on system type and fill type. See Control Valve Function and Cycles of Operation for more detail.
STEP 8S. Set the length of the backwash to 1 ­ 95 minutesor OFF using or . Press NEXT to go to Step 9S. PressREGEN to return to previous step.
STEP 9S. Set the length of the regenerant draw to 1 ­ 180 minutes or OFF using or . Press NEXT to go to Step 10S. Press REGEN to return to previous step.
This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 15
6. QUICK SET UP GUIDE
STEP 10S. Set the length of the second backwash to 1 ­ 95 minutes or OFF using or . Press NEXT to go to Step 11S. Press REGEN to return to previous step.

STEP 11S. Set the length of rinse to 1 ­ 95 minutes or OFF using or . Press NEXT to go to Step 12S. Press REGEN to return to previous step.

STEP 12S. Set the length of fill to 0.05 ­ 90.0 kg of NaCI or OFF using or . Press NEXT to exit OEM Softener System Setup. Press REGEN to return to
previous step.

RETURN TO NORMAL MODE

This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 16
7. INSTALLATION DIAGRAM Compact water softener.
This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 17
8. SERVICE
8.1 MAINTENANCE WORK
To ensure proper operation softener, the user should regularly carry out the following checks: Check the presence of salt and if necessary, add.
Check water hardness: hardness of drinking water and the hardness of mixed water should be checked no less than 2 times a year, if necessary, it should be adjusted the hardness of the mixed water (see the “Installation” section).
Check for tightness, carry out: visual inspection: check for possible leakage of all connections and pipelines. Check the cleanliness of the salt and saline solution storage capacity 1 time in 2 months, if necessary, clean and rinse clean water.
The indicated terms of the recommended inspections are available are minimal and must be adjusted, depending on operating conditions.
8.2 USER RESPONSIBILITY
Any technical equipment requires regular maintenance.
Constantly monitor the quality and level of softened pressure water If the water quality has changed, change it too parameter settings are set. If necessary, consult a specialist.
Regular checks by the operator are required as a guarantee normal functioning of the device. Emollient water should be regularly inspected compliance with the conditions of its operation.
Frequency of checks performed by the user: After use: add salt for regeneration. 2 times a year: check the pressure. 2 times a year: check water quality. Once a year: clean the salt tank.
8.3 SERVICE AND SPARE PARTS
Parts that wear out must also be replaced in the specified maintenance period so that to guarantee flawless operation of the installation and perform warranty conditions. Softener maintenance it is recommended to carry out once a year.
Replacement of wearing parts can be performed only qualified personnel (specialists of the organization water supply or service).
We recommend concluding a service contract service with our service department.
Cleaning: do not use alcohol for cleaning or alcohol-based detergents to avoid damage surfaces of plastic parts.
8.4 DISPOSAL
After the end of the service life of the installation contact Ecosoft Service to arrange softener replacement. Disposal of softener and of all electrical parts is carried out only in specialized recycling centers.
This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 18
9. TROUBLESHOOTING

Problem

Cause

Correction

Decreased supply water pressure Increase supply water pressure

1se. rDveiccereflaoswed capacity

Clogged filter bed Obstructed/clogged drain line Clogged control valve

See paragraph 3 Clean the drain line Inspect and clean the control valve

NHWBP/MAV failure (if used)

Inspect and repair the motorized valve

Faulty chemical analysis of water

Perform one more test using freshly prepared reagents

Supply water chemistry has changed

Make new check analysis and if changed contact your dealer

Bypass valve is set to bypass

Turn bypass valve to operating position

2q.uDaleitcyreoafsteredated Riser pipe or seals are damaged water
Clogged filter bed

Take apart the filter, inspect and replace or lubricate pipe and seals if necessary
See paragraph 3

Filter media loss

See paragraph 4

Improper filter regeneration

See paragraph 6

Leakage of raw water inside the control valve

Take apart the control valve, inspect and replace or lubricate the seals if needed

Insufficient backwash flow rate

Check backwash flow rate. If supply pressure is within the limits and the flow rate is insufficient, inspect and clean the drain line flow control or replace it if needed

3. Clogged filter bed

Insufficient backwash stage Clogged top distributor

Increase the duration of backwash stage Clean the top distributor

Excessive backwash flow rate

Measure backwash flow rate. If supply pressure is normal and the flow rate is exceeding, consider changing the drain line flow control

4. Filter media entrainment

Fdiilstcehramrgeeddiadiusreinngtrbaaincekdwaasnhd Fdiilstcehramrgeeddiadiusreinngtrsaeinrveidceand

Replace the top distributor if needed Replace the bottom distributor if needed

This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 19
9. TROUBLESHOOTING

Problem

Cause

Correction

No electric power

Check power supply

No/insufficient salt in brine tank

Chech the amount of salt in brine tank and add salt if needed

Brine is not sucked in during regen., 5. System will not or not all brine is drawn regenerate
Control valve is out of order or settings were changed

See paragraph 6 Check the control valve and its settings (see the manual for the control valve)

Brine tank is not refilled or is refilled with not enough water

See paragraph 7

Low supply water pressure

ICheck supply water pressure

Clogged injector or brine tube

Clean brine injector and/or brine tube

6. Brine will not drergaewndeurartiniogn or not all brine will draw

Cbalollgigneadirbcahsekectkovralsvaelt crystals on High pressure drop on the filter (control valve, distributors or filter media are clogged)

Clean air check valve basket and/ or ball See paragraphs 1 and 4

Air is injected due to brine line not being airtight

Check airtightness of the drain line

Control valve settings changed

Increase brine stage duration

Low supply water pressure

Check supply water pressure

7. Brine tank is not refilled or refilled with less water than needed

Clogged injector or brine tube Stuck ball in the air check valve Control valve settings changed

Clean brine injector and/or brine tube Clean the air check valve Check the duration of brine tank refill and correct if necessary

8. Excess use orefnseagltepraetrion

Control valve settings changed Brine tank filled with excess water

Decrease the amount of salt per regeneration in the control valve settings See paragraph 9

9. Brine tank is reexfciellessdwwaittehr

High main water pressure Control valve settings changed

Check water pressure. Install pressure regulator if needed Check the duration of brine tank refill and correct if necessary

This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 20
10. GUARANTEE
WARRANTY OBLIGATIONS
The warranty period of the water purification system is 12 months and is counted from the day of sale of the system through the retail network (unless otherwise stated in the product warranty card).
The manufacturer guarantees that this water purification system does not contain manufacturing defects and that such defects will not be detected during the warranty period specified in the warranty card, from the moment of sale from the manufacturer’s warehouse or retail network, in the event that the purification system is installed and operates in accordance with the technical requirements and operating conditions. Before using the water purification system, be sure to read the instructions for connecting and operating the water purification system and the terms of the warranty obligations.
Carefully check the appearance of the water purification system and its completeness. Submit all claims regarding appearance and completeness to the seller upon receipt of the product.
We reserve the right to make changes to the design, configuration, or manufacturing technology, such changes do not impose obligations to replace or improve previously released products.
The warranty card is valid only if the model, date of sale, and clear stamps of the seller are correctly specified.
Consumer claims, in accordance with current legislation, can be submitted during the warranty period of operation, provided that the defects of the water purification system did not arise as a result of:
– non-observance of the conditions of operation and storage of systems specified in the instructions for connection and operation of the system;
– caused by transport damage, incorrect installation, careless use or misuse, connection to a power supply voltage that does not correspond to that specified in the operating instructions, failure to follow the attached connection and operating instructions;
– operation with unremedied defects, or with defects that arose as a result of maintenance or repair by persons or organizations that are not representatives of an authorized service center;
– causes independent of the manufacturer, such as: power supply voltage drops, natural phenomena, and natural disasters, fire, ingress of foreign objects (liquids) or other substances into the product;
– external and internal contamination, scratches, cracks, bruises, abrasions, and other mechanical damage that occurred during operation;
– changing the design or unauthorized opening of system nodes, when changing the serial number of the product or the date of manufacture;
– untimely replacement of elements, the terms of which are indicated in the instructions for connection and operation, as well as when using replaceable elements of other manufacturers.
This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

MANUAL FOR ECOSOFT PINK SOFTENERS 21
10. GUARANTEE
WARRANTY OBLIGATIONS Warranty obligations do not extend to: · replaceable elements (cartridges, reverse osmosis membrane, carbon postfilter, mineralized, and
other replaceable elements that can be equipped with the system) and sealing rings; · components that need to be replaced as a result of their wear and tear; · types of work, such as adjustment, cleaning, replacement of consumables, and other care of water
purification systems, stipulated by the instructions for connecting and operating the product. The manufacturer shall not be liable for any damage or any other damage, including lost profits, arising incidentally or as a result of the use or inability to use this product. The material liability of the Manufacturer under this Warranty cannot exceed the cost of the water treatment system. In the case of an independent connection of the system, the manufacturer is not responsible and does not accept claims that may be caused by incorrect connection and incorrect operation of the system as a whole. The list of authorized service centers is indicated on the website https://ecosoft.ua/contacts/ All claims regarding the quality of water, taste, smell and other properties of water purified with the help of water purification systems are accepted only in the presence of a confirming protocol of analysis performed by a research accredited laboratory in accordance with the ISO 17025 standard. Cases not covered by this Warranty are regulated by the Legislation.
11. SERIAL INFORMATION
INSTALLATION

date of installation address and phone accepted (customer`s name and signature)
INSTALLER

organization

date of sells

address and phone

dealer company

works accomplished (name and signature)

saller name

This manual is the intellectual property of Ecosoft. Copying and reprinting is prohibited. © 2024

ecosoft.com

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals