CREM C1EX2LG EX2 1 Group Control Light Grey Espresso Machine Installation Guide

June 3, 2024
CREM

CREM C1EX2LG EX2 1 Group Control Light Grey Espresso Machine Installation Guide
CREM C1EX2LG EX2 1 Group Control Light Grey Espresso
Machine

EX2 range install specification

The EX2 is an attractive and extremely versatile professional espresso machine. The EX2 is suitable for any kind of business with an espresso demand, whether an independent café or a national coffee shop chain.
Ergonomics and user experience have been key on this project. Following Crem’s own standards of performance, the EX2 features innovative, highly tested technologies in order to deliver a superior in cup quality.
EX2 range install specification EX2 range install
specification

Standard Features

  • Twin 1/2 turn rotary taps for smooth and precise control
  • Pressure switch control
  • Built-in rotatory pump
  • Pre-infuse chamber group head
  • Volumetric dosing (5 keypad button)
  • Group flush button
  • Electronic pre-nfusion
  • 60mm single pressure gauge
  • Group auto cleaning cycle
  • Takeaway group height allows for positioning and filling of up to 16oz cups

Model Details

Code Variant In the box
C1EX2LG 1 Group EX2 Mini Control High Group* 1 x single portafilter, 1 x

double portafilter, 1 x 0.55 metre water filter hose, 1 x 1.5 metre waste hose, 1 x power cable, 1 x espresso cup stand
C2EX2CLG| 2 Group EX2 Mini compact High Group| 1 x single portafilter, 2 x double portafilter, 1 x 0.55 metre water filter hose, 1 x 1.5 metre waste hose, 1 x power cable, 2 x espresso cup stands
C2EX2LG| 2 Group EX2 Control High Group
| 1 x single portafilter, 2 x double portafilters, 1 x 0.55 metre water filter hose, 1 x 1.5 metre waste hose, 1 x power cable, 2 x espresso cup stands

  • – Light Grey (LG)

EX2 Install Location requirements

EX2 Install Location requirements

Filter Specifications (mm)

WMMR| 500 x 130
WMLR| 530 x 145
WMXLR| 530 x 145
WM2XLR| 600 x 185

INSTALLATION NOTE:
Prior to any connection of either machine or water treatment unit, flush at least 25 litres from the water connection point to clear any plumbing residue from the site water supply.

PLEASE NOTE:
Ensure that the connected drain has a downward flow from the point of connection on the machine to avoid blockages.

Hole location for drain and services
EX2 Install Location requirements

EX2 Install Installation check list

MODEL SUPPLY CONNECTION POWER WIDTH DEPTH HEIGHT WEIGHT
1 Group EX2 Mini Control 1N ~ 220-240V 13A 2800W 515 575 461 48kg
2 Group EX2 Mini Compact 1N ~ 220-240V 13A 2800W 515 575 461 50kg
2 Group EX2 Control 1N ~ 220-240V 16A 3350W 735 575 461 62kg

Preinstallation Check List

Electrical supply within 1 metre and suitable for required load. (above 3000W is not suitable for 13A plug connection)|
15 mm Dedicated cold water supply within 1 metre with 3/4” washer tap.|
35mm Trapped Waste Under worktop within 1 metre|
Worktop area complete and with space for machine|
Space for grinder with 13A socket|
The electrical and water supplies are tested and working?|
Is there coffee and cups on site so the engineer can commission the machine?|
Preferred work surface height 900mm (only for optimum working)|
Has 50mm diameter hole been made through worktop for pipes/cables.|
Space for water filter under work top (see water filter dimensions on p2)|
Is someone on site to help engineer lift the machine.|
Work top capable of supporting weight|
Are there any site access issues that the engineer should be made aware of?|

Installation Details

Full install address: ___

Preferred install date: //_____

Contact name: ___

Contact telephone: ___

Installation Confirmation

Please sign and date the declaration below to confirm all the above is correct and ready. Return completed page back to us (post or email)

If the engineer can not install on arrival due to any of the above being false, a second installation charge will be become payable to cover the engineer expenses.

Signed: ____

Date: _/_/

Welbilt reserves the right to make changes to the design or specifications without prior notice.

Welbilt UK Ltd
Ashbourne House, The Guildway
Old Portsmouth Road
Guildford, GU3 1LR
United Kingdom

Email:[email protected]
Tel: +44 (0) 1483 464 90

www.crem.coffee