Yfisher Expandable Container House Installation Guide

August 16, 2024
Yfisher

Yfisher Expandable Container House Installation Guide

Product Introduction

The expandable container house is an innovative residential design concept that has attracted much attention for its unique structure and space utilization. The design of the house is inspired by the natural shape of spread wings, creating a more spacious, airy and flexible living space through the wingspan on both sides of the structure.

Installation Guidance

[1] Preparation before installation

Before installing the house, you need a level ground or support point. It should be super flat. The main body of the house should be placed directly on the ground. A 20-foot expandable container house needs 40mm support points on both sides, and a 40-foot expandable container house needs 80mm support points on both sides, with at least three support points on one side. Determine whether piling is required to install the foundation based on the specific ground conditions (generally, soft ground such as beaches and mud requires foundation installation)

[2] Things to prepare for installation

  • Installation without a manual winch requires at least six people;
  • You need to prepare gloves, helmets, electric drills, electric wrenches or spanners and other tools;
  • When you start to open the top plate, after the top plate opens a gap, please note that at least two people are required to push the inner vertical plate by hand, and then check whether the inner vertical plate has signs of movement; check whether the latch device inside is in a locked state or damaged. Avoid the top plate rising and the folding surface latch device inside is damaged, causing it to fall directly and cause an accident.

[3]Installation steps

  1. To unfold the main wall panels on both sides of the house: first open the packaging of the house and the shipping screws, then lift or prop up the outermost roofs on both sides of the house, then open the fixings (latches) on the inner side bottom, slowly lower the floor, then open the side wall panels of the house, and finally unfold the front and back wall panels of the house, as shown below, or refer to the video. Please refer to the video of house unfolding.

  2. Fix the fixing screws around the house’s exterior wall panels. If the reserved bolt holes are deviated, please fine-tune the height of the nearby pads until the screws can be inserted.

  3. Check whether the waterproof tape at the gap between the side top plate and the main top is damaged. If damaged, please re-glue and stick the waterproof tape; and re-glue and stick the waterproof tape at both ends of the gap.

  4. Use glue gun to apply glue to the gaps inside the room.

  5. Install handles for the main entrance door, bedroom doors and windows (https://www.dxhcontainer.com/video/handle-installation.html)

  6. Install the mouth piece on the left side of the door (https://www.dxhcontainer.com/video/mouth-piece-installation.html)

  7. Installing gap (https://www.dxhcontainer.com/video/floor-gap-installation.html)

  8. Install socket/switch(Please refer to the socket installation video)

  9. Install skirt(https://www.dxhcontainer.com/video/skirting-boards-installation.html

  10. Install sink (https://www.dxhcontainer.com/video/sink-installation-1.html)

Parts List

Table 1. Accessories list and description

Important Notes

  • The wall of this product is heavy, please pay attention to safety during installation.
  • The warranty period for this product is one year.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals