SOLAX POWER TBMS-MCS60060 Triple Power Lithium-ion Battery Installation Guide

July 21, 2024
SOLAX POWER

TBMS-MCS60060 Triple Power Lithium-ion Battery

“`html

Specifications:

  • Triple Power Lithium-ion Battery 100 Ah
  • BMS Model: MCS60060
  • Battery Module Model: TP-HS50
  • Rated at IP65 for outdoor and indoor installation

Product Usage Instructions:

Installation Prerequisites:

Ensure that the installation site meets the following
conditions:

  • Follow local laws and standards for battery installation.
  • Avoid direct sunlight and moisture for optimal performance if
    installed outdoors.

Steps (Floor Mounting):

Follow the steps below for floor mounting:

  1. Step 1: Place the Base

  2. Remove the dust cover.

  3. Insert four M8*85 adjustment screws through the Base bottom to
    ensure stability.

  4. Step 2: Locate the Base

  • Keep the Base 1.57 in./40 mm away from the wall.
  • Mark the location accurately on both sides with a pen.

Overview (Floor Mounting):

Refer to the following schemes for floor mounting
configurations:

  • Scheme A: Description of Scheme A configuration.
  • Scheme B: Description of Scheme B configuration.
  • Scheme C: Description of Scheme C configuration.

Frequently Asked Questions (FAQ):

Q: Can the Triple Power battery be installed outdoors?

A: Yes, the battery module is rated at IP65 and can be installed
outdoors as well as indoors. Ensure to avoid direct sunlight and
moisture for optimal performance if installed outdoors.

Q: How many adjustment screws are required for placing the Base

during installation?

A: Four M8*85 adjustment screws are required to stabilize and
level the Base during installation.

“`

Quick Installation Guide
—- Triple Power Lithium-ion Battery 100 Ah

I

Packing List

Note: The Quick Installation Guide briefly describes required installation steps. If you have any question, please refer to the User Manual delivered with the BMS for details.

BMS (TBMS-MCS60060): Hereinafter referred to as “MCS60060”

All Accessories Required for Two Installation Modes (T50 Battery) Hereinafter referred to as “Accessories Required”

A

A

B

C

BMS x 1

Document

Battery Module (TP-HS50): Hereinafter referred to as “TP-HS50”

A

A

Battery module x 1

B

C

Wall bracket x 1 D

Wall bracket x 1 E

ST6*55 self-tapping Washer x 2 screw x 2

Expansion bolt x 4

F

G

M5*10 phillips-head screw x 10
H

Platen (3 holes) x 2

Platen (2 holes) x 2

Document

M8*85 expansion screw x 6
D

M5*8 countersunk screw x 4
E

M5*20 countersunk screw x 6
F

M8*88 self-tapping screw x 6

Washer x 6

Adjustment screw x 4

Transverse plate x 1

Base support x 2

Base for TP-HS50 Battery:

Base x 1

II

Installation Prerequisites

Ensure that the installation site meets the following conditions:
Y The building is designed to withstand earthquakes Y The site is over 3280.84 ft/1000 m. away from the sea to avoid salt water and humidity Y The floor is flat and level Y There are no flammable or explosive materials, at a minimum of 2.95 ft/0.9 m Y The ambience is shady and cool, and is away from heat and direct sunlight Y The temperature and humidity remain at a constant level Y There is minimal dust and dirt in area Y There are no corrosive gases present, including ammonia and acid vapor Y Where charging and discharging, the ambient temperature ranges from 32°F/0°C to 113°F/45°C Y For both mounting methods, the wall tilt must not exceed 5 degrees
In practice, the requirements of battery installation may be different due to enviroment and locations. In that case, follow up the exact requirements of the local laws and standards.
Note!
The Triple Power battery module is rated at IP65 and thus can be installed outdoors as well as indoors. However, if installed outdoors, the battery pack should avoid direct sunlight and moisture for optimal performance .
Note!
If the ambient temperature exceeds the operating range, the battery pack will stop running to protect itself. The optimal temperature range for operation is 14°F/-10°C to 122°F/50°C. Frequent exposure to harsh temperatures may deteriorate its performance and lifetime.

IV

Steps (Floor Mounting)

Please reserve enough distance from the equipment to the ceiling/ground for capacity expansion. Take Scheme C as an example.

Step 1: Place the Base. (1) Remove the dust cover.

(2) Insert four M8*85 adjustment screws (Accessories Required: Part F) through the Base bottom to ensure that it is stable and level.

Step 2: Locate the Base 1.57 in./40 mm away from the wall, and accurately mark the location of the Base on both sides with a pen.

III

Overview (Floor Mounting)

Scheme A

BMS

2 Wall bracket 2 Self-tapping screw

31.81 in./808 mm

Battery

2 Expansion bolt 2 Washer

Battery

14 M510 screw 2 * Platen (3 holes)

Base

4 * Platen (2 holes)

Distance from the equipment:

To left side: 11.81 in./300 mm

To right side: 11.81 in./300 mm

Scheme B

BMS

Battery Battery Battery

43.62 in./1,108 mm

4 Wall bracket 4 Self-tapping screw 4 Expansion bolt 4 Washer 20 M510 screw 4 Platen (3 holes) 4 Platen (2 holes)

Base Distance from the equipment: To left side: 11.81 in./300 mm To right side: 11.81 in./300 mm
Scheme C
BMS

Battery Battery Battery Battery

55.43 in./1,408 mm

4 Wall bracket 4 Self-tapping screw 4 Expansion bolt 4 Washer 24 M510 screw 4 Platen (3 holes) 6 Platen (2 holes)

Base
Distance from the equipment: To left side: 11.81 in./300 mm To right side: 11.81 in./300 mm

BMS Battery Module Battery Module
Base
BMS Battery Module Battery Module Battery Module
Base

BMS
Battery Module Battery Module
Base
BMS
Battery Module Battery Module Battery Module
Base

BMS Battery Module Battery Module
Battery Module Battery Module
Base

BMS
Battery Module Battery Module Battery Module
Battery Module Base

M8*85×4

Note!

(a) Use a spirit level to measure the sides of the Base to ensure they are even. (b) If not, please adjust the adjustment screws by a torque wrench being to ensure that the Base is even.

14.507minm
1.57 in 40 mm

Step 3: Place the Battery Module onto the Base. (1) Remove the top and bottom dust covers. (2) Place the Battery Module on the Base.

Note!

Mark

Right View

· For installation against concrete wall, strictly perform the following steps. · For installation against solid wood wall, directly go to step 7.

(1)

(2)

Note! If the Base is shifted after placing the Battery Module, move it to its
original location according to the mark previously drawn.

Step 5 (Optional): (1) On each side, feed a M5*10 screw (TP-HS50: part E) through the platen (3 holes) (TP HS50: part F) and the wall bracket (TP HS50: part A) , but not tighten the screw; (2) Attach the wall brackets to the wall, align their holes to the holes on the Battery Module, and use a spirit level to ensure that they are even; (3) Accurately mark the location of the wall brackets; (4) Draw circles according to the actual stud spacing; (5) Remove the wall brackets, and then drill holes (at least 3.54 in./ 90 mm) by a drill (drill bit: Ø 0.39 in./10 mm, at least 9.84 inch/250mm long).

(3) On each side, use two M5*10 phillips-head screws (TP-HS50: part E) and a platen (2 holes) (TP-HS50: part G) to secure the combination.

2 Mark

Step 7: Align the wall brackets to the wall based on the hole marks, insert two ST6*55 self-tapping screws (TP-HS50: part B) and two washers (TP-HS50: part C) into the holes, and then use a torch wrench (extender length: at least 9.84 inch/250 mm) to secure them.
Mark
Attach screw but not tighten, and align the hole location of
battery Self-tapping screw × 2 Washer × 2 Wall bracket × 2 Torque: 6-8 N·m
Step 8: Place the fourth battery module.

Platen (2 holes) × 2 M510 screw × 4 Torque: 2.2-2.5 N·m
Step 4: Place two Battery Modules in sequence, and secure both sides using M5
10 phillips-head screws (TP-HS50: part E) and platens (2 holes) (TP-HS50: part G). Refer to the Step 3 (3). Please secure the platens and M510 screws immediately after placing a Battery Module.
Step 3 (3)
Platen (2 holes) × 4 M5
10 crew × 8
Torque: 2.2-2.5 N·m

1 Attach screw but not tighten it

Ø 0.39 in./10 mm for Wall Bracket

3.54 in./ 90° 90 mm

Note!
Electric drill dust collector is recommended.

Step 6 (Optional): Hammer in the expansion bolts (TP-HS50: part D) into the holes.

Note!
For installation against solid wood wall, expansion bolts are not required.

Let the platen down
Step 9: Fix the platen, and then tighten all the M510 screws on both sides.
Platen (3 holes) × 2 M5
10 screw × 6 Torque: 2.2-2.5 N·m

Note! · For installation against concrete wall, strictly perform the following steps. · For installation against solid wood wall, directly go to step 10-(6), and expansion
bolts are not required. Step 10: (1) On each side, feed a M510 screw (TP- HS50: part E) through the platen (3 holes) (TP HS50: part F) and the wall bracket (TP HS50: part A) , but not tighten the screw; (2) Attach the wall bracket to the wall, align its holes to the holes on the Battery Module, and use a spirit level to ensure it’s even; (3) Accurately mark the location of the wall brackets with a pen; (4) Draw circles according to the actual stud spacing; (5) Remove the wall brackets, and drill holes (at least 3.54 in/90 mm) by a drill (drill bit: Ø 0.39 in./10 mm, at least 9.84 inch/250mm long); (6) Secure the wall brackets using ST655 self-tapping screws (TP-HS50: part B) and washers (TP-HS50: part C), and then use a torch wrench (extender length: at least 9.84 inch/250 mm) to secure them. Refer to the Step 6, 7 and 8.
Step 6, 7 and 8
Mark
Let the platen down
Self-tapping screw × 2 Washer × 2
Wall bracket × 2 Torque: 6-8 N·m
Note! Electric drill dust collector is recommended.
Step 11: Place BMS onto the Battery Module. (1) Remove the dust cover from BMS bottom.
(2) Place the BMS, fix the platens (3 holes), and then tighten all the M510 screws on both sides. Refer to Step 9.
Step 9
Platen (3 holes) × 2 M5
10 screw × 6 Torque: 2.2-2.5 N·m Note! The holes on BMS are for securing the inverter. For details, see A1-ESS-G2 User Manual.

V

Overview (Wall Mounting)

Note! For wall mounting, make sure the BMS breaker is no more than 6.56 ft/2 m above the ground so that you can easily shut down the system in emergencies. Scheme A

BMS Battery
Battery Base

31.81 in./808 mm

2 Wall bracket 2 Self-tapping screw 2 Expansion bolt 2 Washer 14 M510 screw 2 Platen (3 holes) 4 Platen (2 holes)

BMS Battery
Battery Base

BMS Battery
Battery Base

Distance from the equipment: To left side: 11.81 in./300 mm To right side: 11.81 in./300 mm To the ground : 23.62 in./600 mm (The distance is reserved for increase of battery, and a battery’s height is 11.81 in./300 mm.)
Scheme B

BMS Battery Battery
Battery Base

43.62 in./1,108 mm

4 Wall bracket 4 Self-tapping screw 4 Expansion bolt 4 Washer 20 M510 screw 4 Platen (3 holes) 4 Platen (2 holes)

BMS Battery
Battery
Battery Base

BMS Battery
Battery Battery Base

Distance from the equipment: To left side: 11.81 in./300 mm To right side: 11.81 in./300 mm To the ground: > 11.81 in./300 mm (The distance is reserved for increase of battery, and a battery’s height is 11.81 in./300 mm.)
Scheme C

BMS Battery Battery
Battery Battery
Base

55.43 in./1,408 mm

4 Wall bracket 4 Self-tapping screw 4 Expansion bolt 4 Washer 24 M510 screw 4 Platen (3 holes) 6 Platen (2 holes)

BMS Battery Battery
Battery Battery
Base

BMS Battery Battery Battery
Battery Base

Distance from the equipment: To left side: 11.81 in./300 mm To right side: 11.81 in./300 mm To the ground: It shall be decided according to the local regulations.
Step 5: Place the Battery Module onto the Base. (1) Remove the top and bottom dust covers from the Battery Module. (2) Place the Battery Module onto the Base.

Note!
· For installation against concrete wall, strictly perform the following steps. · For installation against solid wood wall, please go directly to step 9.
Step 7: (1) On each side, feed a M5*10 screw (TP-HS50: part E) through the platen (3 holes) (TP HS50: part F) and the wall bracket (TP HS50: part A) , but not tighten the screw; (2) Attach the wall brackets to the wall, align their holes to the holes on the Battery Module, and use a spirit level to ensure that they are even; (3) Accurately mark the location of the wall brackets; (4) Draw circles according to the actual stud spacing; (5) Remove the wall brackets, and then drill holes (at least 3.54 in./ 90 mm) by a drill (drill bit: Ø 0.39 in./10 mm, at least 9.84 inch/250 mm long).

VI

Steps (Wall Mounting)

Please reserve enough distance from the equipment to the ceiling/ground for capacity expansion. Take Scheme C as an example.
Step 1: There are two ways to install the transverse plate onto base support due to 4 kinds of stud spacing, with details as follows: (a) 28 in./711.20 mm or 32 in./812.80 mm; (b) 20 in./508.00 mm or 24 in./609.60 mm. (1) Attach the transverse plate to the base supports. Ensure that the bubble level on the transverse plate is facing towards you and on the left base support side. (2) Secure the transverse plate to the base supports using two M5*8 countersunk screws (Accessories Required: part B).

32 28

in./812.80 in./711.20

mm mm

2204inin././560089.0.600mmmm

Bubble level

M5*8 × 2

Bubble level

(a)

Torque: 2.2-2.5 N·m

M5*8 × 2

(b)

Torque: 2.2-2.5 N·m

Step 2: (1)Place the assembled transverse plate and base support to the wall, and look the cylindrical plastic bubble level on the transverse plate. If the bubble isn’t in the center, slightly bow it to the horizontal. (2) Determine the position of holes. (3) Mark four holes with a pen. (4) Remove the assembled support, and then drill holes (at least 3.54 in./90 mm) by Drill (Ø 0.47 in./12 mm for concrete wall, or Ø 0.24 in./6 mm for solid wood wall).

32 in./812.80 mm

Ø 0.47 in./12 mm for Base support

90º 3.54 in./ 90 mm

Step 3: (1) Place the assembled transverse plate and base support to the wall (or solid wood stud); (2) Attach screws to the holes, but ensure not to tighten them; · For installation against concrete wall, attach four M885 expansion screws
(Accessories Required: part A) to the holes. · For installation against solid wood wall, attach four M8
88 self-tapping screws
(Accessories Required: part D) to the holes. (3) Check whether the bubble level is horizontal; · (4) Tighten the screws. · For concrete wall, hammer in the expansion screws with a rubber mallet , and then
tighten them with a torque wrench. · For solid wall, directly tighten the screws with a torque wrench.
32 in./812.80 mm

(1) Concrete Wall

Bubble level

Ø 0.24 in./6 mm for Base support

Ground
Note: The distance from the Base to the ground is decided according to the local regulations.

90º 1.97 in./ 50 mm
(2) Solid Wood Wall

Bubble level

x 4
Ø 0.47 in./12 mm For concrete wall
14-16 N·m

x 4
Ø 0.24 in./6 mm For solid wood wall
20-25 N·m

Note: The bubble level on the transverse plate can be used as an auxiliary tool, additionally, please prepare a spirit level to measure whether the plate is even or not.

Step 4: Place the Base. (1) Remove the dust cover.

(2) Place the Base onto the assembled base support, and then secure both sides with four M5*20 countersunk screws (Accessories Required: part C).

32 in./812.80 mm

M5*20 screw × 4 Torque: 2.2 – 2.5 N·m

Step 9: Align the wall brackets to the wall based on the hole marks, insert two ST6*55 self-tapping screws (TP-HS50: part B) and two washers (TP-HS50: part C) into the holes, and then use a torch wrench (extender length: at least 9.84 inch/250 mm) to secure them.
Mark
Attach screw but not tighten, and align the hole
location of battery Self-tapping screw × 2 Washer × 2 Wall bracket × 2 Torque: 6-8 N·m

Note!
· For installation against concrete wall, strictly perform the following steps. · For installation against solid wood wall, directly go to step 12-(7), and
expansion bolts are not required.
Step 12: (1) On each side, feed a M510 screw (TP-HS50: part E) through the Platen (3 holes) (TP HS50: part F) and the wall bracket (TP HS50: part A) , but not tighten the screw; (2) Attach the wall bracket to the wall, align its holes to the holes on the Battery Module, and use a spirit level to ensure it’s even; (3) Accurately mark the location of the wall bracket with a pen; (4) Draw a circle according to the actual stud spacing; (5) Remove the wall bracket, and drill the hole (at least 3.54 in/90 mm) by a Drill (drill bit: Ø 0.39 in./10 mm, at least 9.84 inch/250 mm long); (6) Secure the wall bracket using ST655 self-tapping screws (TP-HS50: part B) and washers (TP-HS50: part C), and then use a torch wrench (extender length: at least 9.84 inch/250 mm) to secure them. Refer to the Step 8, 9 and 10.

Step 10: Place the fourth battery module.

Steps 8, 9 and 10 Mark

(1)

(2)

(3) On each side, use two M5*10 phillips-head screws (TP-HS50: part E) and a platen (2 holes) (TP-HS50: part G) to secure the combination.

2 Mark
1 Attach screw but not tighten it

Ø 0.39 in./10 mm for Wall Bracket

Platen (2 holes) × 2 M510 screw × 4 Torque: 2.2-2.5 N·m
Step 6: Place two Battery Modules in sequence, and secure both sides with M5
10 phillips-head screws (TP-HS50: part E) and platens (2 holes) (TP-HS50: part G). Refer to the Step 5 (3). Please secure the platens and M5*10 screws immediately after placing a Battery Module.
Step 5 (3)

3.54 in./90 mm 90°
Note! Electric drill dust collector is recommended.
Step 8 (Optional): Hammer in the expansion bolts (TP-HS50: part D) into the holes.
Note! For installation against solid wood wall, expansion bolts are not required.

Step 5 (3)

Let the platen down
Step 11: Fix the platen, and then tighten all the M510 screws on both sides.
Platen (3 holes) × 2 M5
10 screw × 6 Torque: 2.2-2.5 N·m

Platen (2 holes) × 4 M5*10 screw × 8 Torque: 2.2-2.5 N·m

Let the platen down
Self-tapping screw × 2 Washer × 2
Wall bracket × 2 Torque: 6-8 N·m
Note! Electric drill dust collector is recommended.
Step 13: Place BMS onto the Battery Module. (1) Remove the dust cover from BMS bottom.
(2) Place the BMS, fix the platen (3 holes), and then tighten the M510 screws on both sides. Refer to Step 11.
Step 11
Platen (3 holes) × 2 M5
10 screw × 6 Torque: 2.2-2.5 N·m
Note! The holes on BMS are for securing the inverter. For details, see A1-ESS-G2 User Manual.

VII

Wiring

Making a BMS communication cable
To ensure normal operation of BMS and inverter, a BMS communication cable is required to be made before wiring. The specific definition of the communication cable is shown as follows:

Sequence 1

2

3

4

5

6

7

8

BMS

/

GND / BMS_H BMS_L /

A1

B1

The wire order of the communication cable is as follows:

123 4567 8

  1. Orange stripes on white 2) Orange 3) Green stripes on white 4) Blue 5) Blue stripes on white 6) Green 7) Brown stripes on white 8) Brown

Note! The BMS communication cable shall have a shield layer.

Before wiring, 1. Unscrew the cap at BMS clockwise; 2. Unscrew the screws at BAT+ and BAT- respectively.

BMS DIP

BAT+

BAT-

POWER

After wiring

Insert the orange power cable into the orange socket Insert the black power cable into the black socket Screw the communication cable into the communication socket
Note! Don’t violently remove cables when they are locked.

VIII

Commissioning

Steps for commissioning are shown as follows: Press the left side door panel Open the air switch’s guard and toggle switch, to ensure that the inverter does charge to the battery Press the right side door panel Press the button for 1 to 2 sec, and then the system starts

Press the left side door panel

On

Off

Press the right side door panel

Black Start: Press the POWER button and hold it for 20 sec; release the button after the four SOC indicators flash blue alternately. But, we do not recommend the use of Black Start as it may cause the port to be charged, resulting in an electric shock.
If the batteries have not been used for more than 9 months, these batteries must be charged to at least SOC 50 % each time. For the first installation, the interval among manufacture dates of battery modules shall not exceed 3 months. If a battery is replaced or added for capacity expansion, each battery’s SOC should be consistent. The max. SOC difference should be between ±5%. If users want to increase their battery system capacity, please ensure that the SOC of the existing system capacity is about 40%. The manufacture date of the new battery shall not exceed 6 months; in case of exceeding 6 months, please charge the new battery to around 40%.
The equipment can support capacity expansion. There are two circumstances in case the user wants to increase a battery module: 1. For floor mounting, remove the inverter before increase of battery module; 2. For wall mounting, if the distance from the equipment to the ground is enough, do not remove the inverter; otherwise, the inverter shall be removed.
320102033207

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

SOLAX POWER User Manuals

Related Manuals