Rama MARIO 5 Folding 8 Inch DC Long Range Frame Installation Guide
- July 16, 2024
- Rama
Table of Contents
Rama MARIO 5 Folding 8 Inch DC Long Range Frame
Installation
- Arm structure installation
-
CNC head installation Note: Double siuce installation of stone lens holder supporting to sizes of 1s and 22mmm.
-
Installation of VTX antenna
-
Combined with completed parts 1-3
-
Precautions for installing capacitors
-
Installing receiver antenna
-
DJI 03 Air Unit Installation Method
DJI 03 Air Unit 525 it -
Install the top plate
Upgrade Kit B Installation (DJ 03 Air Unit Only)
Scan the QR code to get the installation guide. We recommend you scan it through the SpeedyBee App for detailed instructions.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>