SkyCentrics SkyBox MA01-EP-WBNA EcoPort to Modbus AC SGD Adaptor Installation Guide

July 9, 2024
SkyCentrics

SkyCentrics SkyBox MA01-EP-WBNA EcoPort to Modbus AC SGD Adaptor

Product Information

Specifications:

  • Model: SkyBox MA01-EP-WBNA
  • Port: CTA-2045-B
  • Power Cord Options: NEMA 5-15P, NEMA 6-15P, NEMA L21-30P
  • Power Rating : 10A / 125VAC, 10A / 250VAC, 15A / 208VAC

Product Usage Instructions:

Getting to know SkyBox
Your new SkyBox allows your commercial equipment to have a CTA-2045-B port to communicate to the grid to shift the time of use of your device to benefit the grid, reduce your costs, and maintain your comfort.

MA01-EP-WBNA

  • RESET: A button which can be pressed to factory reset the SkyBox. See Table 1 for more information.
  • QR SYMBOL : The QR symbol has information that may be scanned.
  • SN: Serial Number Please copy the Serial number below for your records.

YOUR DEVICE:

Review the Requirements
To start, ensure you have the SkyBox, equipment with modbus or bacnet communications, and the appropriate power cord. Read and follow all instructions in the manual.

To get started, you will need:

  • Your SkyBox
  • Your equipment that has modbus or bacnet communications
  • NEMA 5-15P IEC-320- C13 AC Power Cord
  • (Rating 10 A / 125 VAC) *, NEMA 6-15P IEC-320- C13 AC Power Cord
  • (Rating 10 A / 250 VAC), or NEMA L21-30P to IEC320-C13 Power Cord (Rating 15 A / 208 VAC)
  • included

Read and follow all of the instructions, cautions, and warnings in this manual.

Install the SkyBox

  1. Plug the equipment modbus or bacnet communications into the ethernet RJ-45 port .
  2. Plug power into the SkyBox.
  3. Connect to your LTE network

Your SkyBox only needs to be plugged in to connect automatically to the grid.

Connect to Your LTE Network
The SkyBox will automatically connect to the grid once plugged in.

Participation in Your Utility Energy Management Program
The SkyBox allows your equipment to respond intelligently to grid conditions, supporting efficiency and reliability. Follow LED status indicators for system health. Energy Management Program The SkyBox enables your commercial equipment to be informed of power grid conditions and to respond intelligently when a CTA-2045 Universal Communications Module (UCM) is installed and successfully connects to the grid. This allows your equipment to become a CTA-2045 Smart Grid Device (SGD) to support the grid. Your utility’s energy management program may collectively optimize power use when necessary to support the power grid. The result is a more efficient and reliable system. This also helps maintain lower electricity rates.

Warning :
To reduce the risk of electric shock, this equipment has a grounding type plug, that has a third (grounding) pin. This plug will only fit into a grounding type outlet. If the plug does not fit into the outlet, contact a qualified electrician to install the proper outlet. Do not change the plug in any way.

FAQ:

Q: What does the reset button do?
A: The reset button can be used to factory reset the SkyBox, restoring it to default settings. Refer to table 1 for more details.

Q: How can I tell the status of my SkyBox?
A: The LED indicators provide information on power status and network connectivity. Refer to tables 2 and 3 for details.

Q: What should I do if my SkyBox is not receiving power?
A: Check the power source and connections. If issues persist, contact customer support for assistance.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals