SOLAX POWER Box-II G2 Energy Storage Inverter User Manual

July 9, 2024
SOLAX POWER

Box-II G2 Energy Storage Inverter

Specifications

  • Product Name: Triple Power BMS Parallel Box- G2

  • Manufacturer: SolaX Power Network Technology (Zhejiang) Co.,
    Ltd.

  • Address: No. 288, Shizhu Road, Tonglu Economic Development
    Zone, Tonglu City, Zhejiang Province, 310000 P.R. CHINA

  • Contact: Tel.: +86 (0) 571-5626 0011, E-mail:
    info@solaxpower.com

  • Model Number: BMS Parallel Box- G2

Product Usage Instructions

1. Safety

1.1 Appropriate Usage

Ensure the product is used with compatible battery systems as
specified in the manual.

1.2 Important Safety Instructions

Follow all safety guidelines provided in the manual to prevent
accidents or damage.

1.3 Qualified Installer

Installation and maintenance tasks should be carried out by
qualified electricians only.

2. Commissioning

2.1 Configuring Battery System

Refer to section 5.1 in the manual for instructions on how to
configure the battery system with the BMS Parallel Box- G2.

2.2 Commissioning

Follow the steps outlined in section 5.2 for commissioning the
product properly.

2.3 Status Indicators

Understand the status indicators as explained in section 5.3 to
monitor the functioning of the parallel box.

3. Troubleshooting

Refer to section 6 of the manual for troubleshooting tips in
case of issues.

4. Maintenance

Regular maintenance is essential for optimal performance. Follow
the guidelines in section 8 for maintenance procedures.

FAQ

Q: Can I use the BMS Parallel Box- G2 with any type of battery

system?

A: The BMS Parallel Box- G2 is designed to work with specific
battery systems as mentioned in the manual. Ensure compatibility
before use.

Q: What should I do if the status indicators show an

error?

A: Refer to the troubleshooting section in the manual to
identify and resolve any errors indicated by the status
indicators.

Q: Is it necessary to register for warranty coverage?

A: Yes, it is recommended to fill out and submit the warranty
registration form to avail warranty benefits.

Triple Power BMS Parallel Box- G2 User Manual

SolaX Power Network Technology (Zhejiang) Co., Ltd.
Add.: No. 288, Shizhu Road, Tonglu Economic Development Zone, Tonglu City, Zhejiang Province, 310000 P.R. CHINA Tel.: +86 (0) 571-5626 0011 E-mail: info@solaxpower.com
320101064101

EN
Copyright © SolaX Power Technology (Zhejiang) Co., Ltd. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of SolaX Power Technology (Zhejiang) Co., Ltd. (hereinafter referred to as SolaX). SolaX reserves the right of final interpretation.

CHANGE HISTORY
Changes between document versions are cumulative. The latest version contains all updates made in previous versions.
Version 01 (Oct. 26, 2023) Updated all pictures that include the appearance and port details of the parallel box.
Version 00 (Sept. 21, 2023) Initial release

Contents
1 NOTE ON THIS MANUAL ……………………………………………………………………1 1.1 SCOPE OF VALIDITY…………………………………………………………………….1 1.2 TARGET GROUP…………………………………………………………………………..1 1.3 SYMBOLS USED……………………………………………………………………………1
2 SAFETY ………………………………………………………………………………………..2 2.1 APPROPRIATE USAGE …………………………………………………………………2 2.2 IMPORTANT SAFETY INSTRUCTIONS…………………………………………3 2.3 QUALIFIED INSTALLER ………………………………………………………………..4
3 PRODUCTION INTRODUCTION ……………………………………………………….6 3.1 PRODUCTION OVERVIEW ………………………………………………………….6 3.1.1 DIMENSIONS………………………………………………………………….6 3.1.2 APPEARANCE …………………………………………………………………7 3.2 BASIC FEATURES …………………………………………………………………………8 3.2.1 FEATURES ………………………………………………………………………8 3.2.2 CERTIFICATIONS……………………………………………………………8 3.3 TECHNICAL DATA ……………………………………………………………………….8
4 INSTALLATION ………………………………………………………………………………….10 4.1 INSTALLATION PREREQUISITES………………………………………………..10 4.2 SAFETY GEAR …………………………………………………………………………….10 4.3 TOOLS ………………………………………………………………………………………11 4.4 INSTALLATION ……………………………………………………………………………11 4.4.1 CHECK FOR TRANSPORT DAMAGE …………………………….11 4.4.2 UNPACKING………………………………………………………………….11 4.4.3 ACCESSORIES ………………………………………………………………12 4.4.4 MOUNTING STEPS……………………………………………………….12 4.5 OVERALL INSTALLATION …………………………………………………………..14 4.6 CABLE CONNECTION……………………………………………………………….16 4.6.1 CONNECTING CABLES TO INVERTER ………………………..16 4.6.2 CONNECTING BATTERY MODULES ……………………………18 4.6.3 CONNECTING COMMUNICATION CABLES……………….20
5 COMMISSIONING …………………………………………………………………………….21 5.1 CONFIGURING BATTERY SYSTEM…………………………………………….21 5.2 COMMISSIONING ……………………………………………………………………..22 5.3 STATUS INDICATORS ………………………………………………………………..23

6 TROUBLESHOOTING……………………………………………………………………….24 7 DECOMMISSIONING ……………………………………………………………………….26
7.1 DISMANTLING THE BOX …………………………………………………………..26 7.2 PACKAGING ………………………………………………………………………………26 8 MAINTENANCE…………………………………………………………………………………27 9 WARRANTY ……………………………………………………………………………………..28 * WARRANTY REGISTRATION FORM

Notes on this Manual
1 Note on this Manual
1.1 Scope of Validity
This manual is an integral part of the Parallel Box Series. It describes the assembly, installation, commissioning, maintenance and failure of the product. Please read carefully prior to operation.

Model:

BMS Parallel Box- G2

NOTE! The BMS Parallel Box- G2 can be used with T-BAT-SYS-HV-5.8 or T-BAT- SYSHV-3.0. Please refer to section 4 “Installation “from page 10 to page 20 for details.
1.2 Target Group
This manual is for qualified electricians. The tasks described in this manual should only be performed by qualified electricians.

1.3 Symbols Used
The following types of safety instructions appear in this document are descri- bed below:
DANGER! “DANGER” indicates a hazardous situation which, if not avoided, will result in serious injury or death.
WARNING! “WARNING” indicates a hazardous situation which, if not avoided, could result in serious injury or death.
CAUTION! “CAUTION” indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
NOTE! “NOTE” provides tips that are valuable for the optimal operation of your product.

Safety
2 Safety
2.1 Appropriate Usage
For safety reasons, installers are responsible for familiarizing themselves with the contents of this manual and all warnings before performing installation. Connect with T-BAT-SYS-HV-5.8
Connect with T-BAT-SYS-HV-3.0
2

Safety
2.2 Important Safety Instructions
DANGER! Danger to life due to high voltages in the parallel box!
Y All work must be carried out by qualified electrician. Y The appliance is not to be used by children or persons
with reduced physical sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction. Y Children should be supervised to ensure that they do not play with the appliance.
CAUTION! Danger of burn injuries due to hot enclosure parts! Y During operation, the upper lid of the enclosure and the enclosure body may become hot. Y Only touch the lower enclosure lid during operation.
CAUTION! Possible damage to health as a result of the effects of radiation! Y Do not stay closer than 0.66 ft/20 cm to the parallel box for any length of time.
WARNING ! Do not operate the parallel box when the device is running.
WARNING ! Risk of electric shock!
WARNING Authorized service personnel must disconnect the cables before attempting any maintenance or cleaning or work-ing on any circuits connected to the box.
3

Safety
· Prior to the application, please read this section carefully to ensure correct and safe application.
· Please keep the user manual properly. · Use only attachments recommended or sold by our company. Otherwise, it may
result in a risk of fire, electric shock, or injury to person. · Make sure that the existing wiring is in good condition and that the wire is not
undersized. · Do not disassemble any parts of the box which are not mentioned in the user
manual. The parallel contains no user-serviceable parts. · See Warranty for instructions on obtaining service. Attempting to service the box
yourself may result in a risk of electric shock or fire and will void your warranty. · Keep the parallel box away from flammable, explosive materials to avoid fire
disaster. · The installation place should be away from humid or corrosive substance. · Authorized service personnel must use insulated tools when installing or working
with this equipment.
2.3 Qualified Installer
WARNING! All operations of box relating to electrical connection and installation must be carried out by qualified personnel.
A skilled worker is defined as a trained and qualified electrician or installer who has all of the following skills and experience:
· Knowledge of the functional principles and operation of grid-tied systems · Knowledge of the dangers and risks associated with installing and using
electrical devices and acceptable mitigation methods · Knowledge of the installation of electrical devices · Knowledge of and adherence to this manual and all safety precautions and
best practices
4

Safety

2.4 Explanation of Symbols
This section gives an explanation of all the symbols shown on the warning label.

Symbol

Explanation

CE mark of conformity

UKCA mark of conformity TUV certification The system must be disposed of at a proper facility for environmentally-safe recycling. Wear protective glasses. Read the enclosed documentation.

Keep the battery system away from open flames or ignition sources.
Keep the battery system away from children.

Caution, risk of electric shock

Caution, risk of danger

5

Product Introduction
3 Product Introduction
3.1 Product Overview
For safety reasons, installers are responsible for familiarizing themselves with the contents of this manual and all warnings before performing installation. 3.1.1 Dimension

6.04 in. 153.50 mm

12.28 in./312.00 mm

6.04 in. 153.50 mm

14.48 in./368.00 mm

14.48 in./368.00 mm

6.79 in. 172.50 mm

13.15 in./334.00 mm

6.79 in. 172.50 mm

6

Product Introduction

3.1.2 Appearance Y Terminals of the BMS Parallel Box- G2

Bottom view:
I III V VII IX

XI XIII

Right side view:

S-

Object

Mark

Description

HEAT+ Connector “Heat+” of the parallel box to “Heat+” of Slave

HEAT- Connector “Heat-” of the parallel box to “Heat-” of Slave

Slave

BAT+ Connector “BAT+” of the parallel box to “B+”/”+” of Slave BAT- Connector “BAT-” of the parallel box to “B-“/”XPLUG” of Slave

CAN Battery module communication of Slave

485 Battery module communication of Slave

BAT+ Connector “BAT+” of the parallel box to “BAT+” of Main

Main BAT- Connector “BAT-” of the parallel box to “BAT+” of Main CAN Connector “BAT-” of the parallel box to “BAT+” of Main

X

/

Air Venue

XI

BAT+ Connector “BAT+” of the parallel Box to “BAT+” of inverter

XII Inverter BAT- Connector “BAT-” of the parallel Box to “BAT-” of inverter

XIII

BMS Connector “BMS” of the parallel Box to “BMS” of inverter

XIV

GND

XV

ON/OFF Circuit Breaker

XVI

POWER

Power Button

XVII

DIP

DIP Switch

NOTE! The cable connection between the BMS Parallel Box- G2 and T-BAT-SYS- HV-5.8 is different from that between the BMS Parallel Box- G2 and T-BAT-SYS- HV-3.0. Please refer to Section 4. Installation starting from page 10 for detailed information.
7

Product Introduction

3.2 Basic Features
3.2.1 Features The box has advanced technology, high reliability and convenient control functions, as shown below:
· Interact with inverter · According to the interactive information, judge and control the
running state of the battery system · BMS related control processing · Realize the corresponding fault identification and processing · Ensure the safe operation of the battery system. · Secondary protection by hardware · IP65 protection level · Safe and reliable · Small occupied area · Wall mounting

3.2.2 Certifications
Safety EMC

IEC 62477-1, IEC 61439-1, IEC 61439-2 IEC 61000-6-1/2/3/4

3.3 Technical Data

Model Dimension (W/H/D)(in/mm) Dimension of Packing (W/H/D)(in/mm) Net Weight (lbs/kg)
Recommend charge/discharge current [A] Maximum Charge/Discharge Current (A) Overvoltage Category (OVC) Protective Class

BMS Parallel Box-II G2
14.4813.156.04/368334153.5 17.3215.6310.12/440397257
19.12/8.7 25 35 II I

8

Product Introduction

Environment Requirement Input/Output voltage Range (V) Environment Standard Power (kW) Maximum Power (kW) Altitude (ft/m) Pollution Degree Noise Level
Operating Temperature
Ingress Protection

70-550 Outdoor
11.5 16.1 6561.68/2000
PD 3 <30dB T-BAT-SYS-HV-3.0: -30°C~55°C (with heating function) -10°C~55°C (no heating function) T-BAT-SYS-HV-5.8: 0°C ~ 55°C (no heating function)
I P65

System one Nominal Operating Total capacity Usable capacity Nominal Max power

(T-BAT-SYS-HV-5.8) voltage [V] voltage [V] [kWh] [kWh]

power [kW] [kW]

T-BAT S 5.8 G2 115.2 110-131

5.8

5.1

2.8

4.0

T-BAT S 11.5 G2 230.4 200-262

11.5

10.3

5.7

8.0

T-BAT S 17.3 G2 345.6 300-393

17.3

15.5

8.6

12.0

T-BAT S 23.0 G2 460.8 400-524

23.0

20.7

11.5

16.1

T-BAT P 5.8 G2 115.2 100-131

11.5

10.3

2.8

4.0

T-BAT P 11.5 G2 230.4 200-262

23.0

20.7

5.7

8.0

T-BAT P 17.3 G2 345.6 300-393

34.6

31.1

8.6

12.0

T-BAT P 23.0 G2 460.8 400-524

46.1

41.4

11.5

16.1

System two Nominal Operating Total capacity Usable capacity Nominal Max power

(T-BAT-SYS-HV-3.0) voltage [V] voltage [V] [kWh] [kWh]

power [kW] [kW]

T-BAT S 3.0 G2 102.4 90-116

3.1

2.7

2.5

3.0

T-BAT S 6.0 G2 204.8 180-232

6.1

5.5

5.1

6.1

T-BAT S 9.0 G2 307.2 270-348

9.2

8.2

7.6

9.2

T-BAT S 12.0 G2 409.6 360-464

12.3

11.0

10.2

12.2

T-BAT P 3.0 G2 102.4 90-116

6.1

5.5

2.5

3.0

T-BAT P 6.0 G2 204.8 180-232

12.3

11.0

5.1

6.1

T-BAT P 9.0 G2 307.2 270-348

18.4

16.5

7.6

9.2

T-BAT P 12.0 G2 409.6 360-464

24.6

22.1

10.2

12.2

9

Installation
4 Installation
4.1 Installation Prerequisites
When assembling the system, avoid touching the terminal with any metal objects or bare hands. The box provides a safe source of electrical energy when operated as designed. The previous safety precautions and the warning messages described in this section must be observed. If any of the previous precautions are not fully understood, or if you have any questions, contact customer service for guidance. The Safety Section may not include all regulations for your region. Ensure that the installation location meets the following conditions:
· The building is designed to withstand earthquakes · The location is far from the sea to avoid salt water and humidity, over 0.62
miles/997.79 meters · The floor is flat and level · No inflammable or explosive materials within a range of at least 3 ft/0.91 m. · The ambiance is shady and cool, away from heat and direct sunlight · The temperature and humidity remain at a constant level · There is minimal dust and dirt in the area · There are no corrosive gases present, including ammonia and acid vapor In practice, the requirements of the parallel box installation may be different due to enviroment and locations. In that case, please follow up the exact requirements of the local laws and standards.
4.2 Safety Gear
Installation and maintenance personnel must operate according to applicable federal, state, and local regulations as well as industry standards regarding product installation. Personnel must wear safety gear as indicated below in order to avoid short circuit and personal injury.
Insulated Gloves Safety Goggles Safety Shoes
10

4.3 Tools
The following tools are required to install the box.

Installation

Torque Screw Driver

Phillips-Screw Driver

Hexagon Wrench

Phillips-Head Screw Driver Flat-Head Screw Driver Torque Wrench

Tape Measure

Drill

Pencil or Marker

4.4 Installation
4.4.1 Check for Transport Damage Ensure the box is intact during and after transportation. If there are visible damages such as cracks, contact your supplier immediately. 4.4.2 Unpacking Unpack the box package by removing the packing tape. Ensure the box modules and relevant items are complete. See the package items on section 4.4.3 and check the packing list carefully. If there is any items missing, please contact our company or your distributor directly.
CAUTION! According to regional regulations, it may require several people to move the equipment.
WARNING! Please follow the installation steps strictly. Our company will not be responsible for any injuries or loss incurred by incorrect assembly and operation.
11

Installation
4.4.3 Accessories For use with T-BAT-SYS-HV-5.8

Power cable (+) x1 Power cable (-) x1
(6.56ft/200cm)

Power cable (+) x2 Power cable (-) x2
(7.22ft/220cm)

BMS Communication Cable (6.56ft/200cm) x1
CAN/485 Communication Cable (7.22ft/220cm) x2

Series-connected plug x2

Expansion tube x2 Expansion Screw x2 Power Cable Disassembling
Tool x1

Rotation Wrench x1

Grounding Terminal x2

Documents

For usewith T-BAT-SYS-HV-3.0

Power cable (+) x1 Power cable (-) x1
(6.56ft/200cm)

Power cable (+) x1 Power cable (-) x1
(7.22ft/220cm)

Power Cable (Heat+) x1 Power Cable (Heat-) x1
(6.56ft/200cm)

RS485 Communication Cable (7.22ft/220cm) x2
BMS Communication Cable (6.56ft/200cm) x1

Expansion tube x2 Expansion Screw x2 Power Cable Disassembling
Tool x1

Rotation Wrench x1

Grounding Terminal x2

Documents

12

Installation
4.4.4 Mounting Steps Wall Mounting: Step 1: Fix the wall bracket on the wall
· The bracket needs to be removed from the box. Measure it and mark the position of the two holes. The bubble of the spirit level should be centered. The height difference from battery modules to here should be >50cm.
· Drill holes at the depth of at least 2.36 inches/60 mm by a drill. · Install the expansion screw tubes on the wall, and screw the wall bracket by
a torque wrench. Step 2: Match the box with the wall bracket
· Hang the box over the wall bracket, move the box close to it and match it on the wall bracket. Clip the buckle on the back of the box into the three slots of the back plate accurately. (Torque: 1.0-1.2 N·m)
M4*10 1.0-1.2 N·m
Ø 10 drill Depth:>60 mm

M6*L55 5 N·m

M4*10 1.0-1.2 N·m

CAUTION!

Ensure that the system is always exposed to ambient air. The system

is cooled by natural convection. If the system is entirely or partially

13

covered or shielded, it may cause the system to stop operating.

Installation

4.5 Overall Installation
Depending on the connection with different battery systems, there are two parallel options, with details as follows:

Connect with T-BAT-SYS-HV-5.8

Connect with a T-BAT H 5.8 (BMS) and a HV11550 battery module:

Connect with a T-BAT H 5.8 (BMS) and 3 HV11550 battery modules:

Inverter

Inverter

Battery module 1

BMS+Battery module 1

Connect with a T-BAT H 5.8 (BMS) and 5 HV11550 battery modules:
Inverter

Battery module 1

BMS+Battery module 1

Battery module 2

Battery module 2

Connect with a T-BAT H 5.8 (BMS) and 7 HV11550 battery modules:

Inverter

Battery module 1
Battery module 2
Battery module 3
14

BMS+Battery module 1
Battery module 2
Battery module 3

Battery module 1
Battery module 2
Battery module 3
Battery module 4

BMS+Battery module 1
Battery module 2
Battery module 3
Battery module 4

Connect with T-BAT-SYS-HV-3.0 Connect with a MC0600 (BMS)
inverter

Installation
Connect with a MC0600 (BMS) and 4 HV10230 battery modules:

Battery module 2-1

BMS
Battery module 1-1

Battery module 2-1
Battery module 2-2

Connect with a MC0600 (BMS) and 6 HV10230 battery modules:

inverter

BMS
Battery module 1-1
Battery module 1-2

BMS

Battery module 2-3

Battery module 2-1
Battery module 2-2
*Wiring at the back

Battery module 1-1

Battery module 1-2

Battery module 1-3

*Wiring at the back

Connect with a MC0600 (BMS) and 8 HV10230 battery modules:

inverter

Battery module 2-4

Battery module 2-1

BMS
Battery module 1-1

Battery module 1-4

Battery module 2-3

Battery module 2-2

Battery module 1-2

Battery module 1-3

*Wiring at the back

*Wiring at the back

CAUTION!

It is supported to only connect the slave battery modules.

It is not supported to only connect the master battery modules.

The number of modules connected at the master side and the slave side should

15

be consistent. At most four modules can be connected at one side.

Installation
NOTE! The recommended installation distance between the box and the battery group (including slave group and master group) is 11.81-23.62 inches /300-600 mm, and the distance between the modules is 9.84 inches/250.00 mm. Before installation, please make sure that the wall can bear the weight of the batteries installed. If not, please take the mode of floor installation.
4.6 Cable Connection

slave

main

inverter

NOTE!

Remember to always keep the unused port plugged.

4.6.1 Connecting Cables to Inverter

Cable connection from the parallel box to the inverter:

“BAT+” to “BAT+”;

BMS

“BAT-” to “BAT-“;

“BMS” to “BMS”.

BATBAT+

To Inverter

BMS

NOTE!

BAT- BAT+

*It is recommended to protect the cables by using corrugated pipe.

*If you plug the cable into the wrong port, you can insert the power cable disas-

-semblingtool into the gap on the side of the joint to unplug the cable easily.

  • Please refer to “battery connection” section of the inverter’s user manual/quick 16 installation guide for details about inverter connection.

Installation

  • If the connector of the T-BAT-SYS-HV-3.0 controller does not match the connector provided with the accessory cable, you can trim the blue connector and replace it with a black connector. The replacement should follow the rule of male-to-male and female-to-female connections. The Installation mode of black connector is as follows:

screw connection

screw connection

chamber

DC plug housing(-) spring

DC socket housing(+)

wire strands

· Connecting the BMS Communication Cable

The wire order of the communication cable is as follows:

123 45 67 8

  1. Orange stripes on white 2) Orange 3) Green stripes on white 4) Blue 5) Blue stripes on white 6) Green 7) Brown stripes on white 8) Brown

Sequence 1

2

3

4

5

6

7

8

BMS

/

GND

/ BMS_H BMS_L /

A1

B1

It is required for the BMS to communicate with the inverter for proper operation.

NOTE! The BMS communication cable is shielded by aluminum foil.
17

Installation

4.6.2

Connecting Battery Modules

For BMS Parallel box- G2 + T-BAT H 5.8 + 1/3/5/7 HV11550 battery pack(s)

From BMS Parallel box- G2 to T-BAT-SYS-HV-5.8: Main “BAT+” to T-BAT H 5.8 “BAT+”; Main “BAT-” to T-BAT H 5.8 “BAT-“.

Installation
For BMS Parallel box- G2 + MC0600 + 2/4/6/8 HV10230 battery modules From BMS Parallel box- G2 to T-BAT-SYS-HV-3.0: Main “BAT+” to MC0600 “BAT+”; Main “BAT-” to MC0600 “BAT-“.

Slave “BAT+” to HV11550 “+”; Slave “BAT-” to HV11550 “XPLUG”.

Slave “BAT+”, Slave “Heat+” to HV10230 “B+”; Slave “BAT-“, Slave “Heat-” to HV10230 “B-“.

NOTE!
If there is(are) a port(s) that is(are) not wired after wiring is completed, please don’t forget to put the waterproof cap(s) on the port(s). To form a complete circuit, connect “-” and “YPLUG” with series-connected cable on the right side of the last battery module. Please check T-BAT-SYS-HV-5.8 User Manual/Quick installation guide for detailed tutorial 18 on cable-connecting between T-BAT H 5.8 and HV10230 battery modules.

B +

B –

NOTE!

Regardless of how many battery modules installed, please put a waterproof cap

on the communication port of the unconnected port of battery module.

Please check T-BAT-SYS-HV-3.0 User Manual/Quick installation guide for detailed

tutorial on cable-connecting between MC0600 and HV10230 battery modules.

19

Installation

4.6.3 Connecting Communication Cables 1) There is a protection cover for the RS485 connector. Unscrew the cover and plug one end of the RS485 I communication cable to the RS485 I connector. Tighten the plastic screw nut which is set on the cable with a rotation wrench. The operation is the same as above if connecting to the COM1/BMS connecter. For T-BAT-SYS-HV-5.8 (RS485 I, BMS): For T-BAT-SYS-HV-3.0 (COM1, BMS):
B +
B –
2) Connect the communication cable from the parallel box to the COMM/BMS/RS485 I communication port that is on the left side of the battery module. HV11550 to Parallel box SLAVE “RS485 I”; HV10230 to Parallel box SLAVE “S-CAN”; T-BAT H 5.8 or MC0600 to Parallel box MAIN “M-CAN”.
Slave Main

The wire order of the communication cable is as follows:

Sequence

1

2

3

4

5

6

7

8

SLAVE RS485 I VCC_485 GND_485 B2

N- P+

A2 VCC_485_2 GND_485

SLAVE CAN VCC_1 GND VCC_2 CANH CANL GND

N-

P+

MAIN CAN

/

GND

/ BMS_H BMS_L /

A1

B1

4.6.4 Connecting the Ground Wire

Remove the M5*10 screw from the bottom of the BMS Parallel box- G2 with a

screwdriver, and then screw the groung wire(10 AWG/6 mm) to the corresponding

grounding port.

M5*10

20

2.5-3 N·m

Commissioning
NOTE! When BMS Parallel box- G2 is connected to T-BAT-SYS-HV-5.8 battery modules, if master group’s CAN is connected to slave group’s CAN port, it can operate and function normally. However, the master group cannot be upgraded properly in this configuration.
5 Commissioning
5.1 Configuring the Box
· The DIP switch is used to configure the communication between battery module(s) and the device. By default, only two groups of batteries can be matched for use. · The black-start function is only used in an off-grid application and when there is no other power supply. To Black-start, hold down the button for 20 seconds until the soc light starts flashing blue to indicate successful black-start. If the box is started in the black-start mode, remind that even when there is no BMS communication, the port still contains high voltage with risk of electric shock. If the BMS communication has still not been established within 3 minutes after starting the black-start mode, it indicates that the black start fails to start. · After the BMS Parallel box- G2 is powered on, if the indicator lights alternate flashing red and green for more than two minutes, and then change to green flashing with the inverter reporting “Batt_ClusterCommuCountMis-Match”, please check the communication connection of the second group of BMS Parallel box- G2, as well as the power- on status of T-BAT H 5.8 or MC0600 connected to the second group. · After the BMS Parallel box- G2 is powered on, if the indicator lights alternate flashing red and green for more than three minutes, and then change to flashing red for one second and off for three seconds, with the inverter reporting “BMS_Internal_Err 1”, it indicates that the corresponding slave at position 1 failed to connect to the communication successfully. According to the error number, please check if the communication line of the slave at the corresponding position is properly connected.
21

Commissioning
· The BMS Parallel box-II G2 must be connected to two groups of batteries simultaneously in order to function properly, and the number of slaves in both groups must be the same. The second group of BMS Parallel box-II G2 must contains a T-BAT H 5.8 or Mc0600. And the two battery circuits connected to the BMS Parallel box- G2 must be all HV11550 or all HV10230, and it is not allowed to connect one group with HV11550 batteries and the other group with HV10230 batteries. · It is prohibited to plug or unplug the power line during the operation of the BMS Parallel box- G2.
5.2 Commissioning
Verify the model number of each battery module to ensure that they are all the same model. After all battery modules are installed, please follow the following steps to start the box: 1) Open the waterproof cover board of the box; 2) Move the circuit breaker switch to “ON”; 3) Press the POWER button to start the box; 4) Reinstall the cover board to the box; 5) Turn on the inverter DC switch; 6) After starting the box, please confirm that the waterproof cover board is closed again.
3
2
NOTE! Frequently pressing the POWER button may cause a system error. Allow at least 10 22 seconds after pressing the POWER button prior to making another attempt.

Commissioning

5.3 Status Indicators

The LED indicators on the front panel of the BMS and the battery modules indicate

the operating status.

Capacity

SOC 25% 50% 75% 100%

Status Light 1 Status Light 2

Status Light

Description of the status indicators of BMS is shown as follows:

No.

Status of BMS

1 Green LED flashes on 1 sec and off for 4 sec

Mode
Inverter sends Idle command

(1) When both groups have faults, the status lights of the two

groups will flash red at intervals of 0.5 seconds. The general

status light will keep the red light on.

(2)When one of the two groups has a fault, and the status light

2 of one group flashes red (light for 1 second and off for 4 seconds), while the other group keeps the green light on. * When the fault is reported, the fault light of the

Protection

corresponding branch will stay red.

3 The status light of one of the two groups is off if it works normally. The general status light will flash green (light for 1 second and off

Normal

for 4 seconds) will stay on green light if an inverter is connected.

4 Green LED flashes once every 0.5 sec

Upgrade for BMS

5 Light off

Power off

The capacity indicators show the state of charge (SOC):

· When the battery module is neither charging nor discharging, the indicator lights are off.

· When the battery module is charging, a part of the blue LED flashes once

every 5 seconds, and a part of the blue LED is on. Take SOC 60% for instance,

when in charging state:

  1. The last two blue LED indicators are on

  2. The third blue LED indicators flash once evey 5 seconds

· When the battery module is discharging, the blue LED indicators flash once

every 5 seconds. Take SOC 60% for instance, when in discharging state:

  1. The last three blue LED indicators flash once every 5 seconds

23

Troubleshooting

6 Troubleshooting
Check the indicators on the front to determine the state of the box. A warning state is triggered when a condition, such as voltage ortemperature, is beyond design limitations. Boxperiodically reports its operating state to the inverter. When the box falls outside the prescribed limits, it entersinto a warning state. When a warning is reported, the inverter immediately stops its operation. Use the monitoring software on the inverter to identify what caused the warning. The possible warning messages are as follows:

Warning Messages BMS_Internal_Err

Description

Troubleshooting

  1. DIP switch on the wrong position 2) The communication between battery modules is interrupted.

1.) Move the DIP switch to the correct position; 2.) Check if the communication cable between bthaettbeartytery modules is correctly and well cporonpneerclytecdo.nnected.

BMS_OverVoltage Battery over voltage

Contact your distributor or our company directly for servicing.

BMS_LowerVoltage Battery under voltage

Contact your distributor or our company directly for servicing.

BMS_ChargeOCP

Battery charge over current protection

Contact your distributor or our company directly for servicing.

BMS_DishargeOCP

Battery discharge over current protection

Contact your distributor or our company directly for servicing.

24

Troubleshooting

Warning Messages BMS_TemHigh

Description
Battery over temperature

Troubleshooting
Wait until the temperature of the cells returns to the normal state.

BMS_TemLow BMS_CellImblance

Battery under temperature

Wait until the temperature of the cells returns to the normal state.

The capacities of Contact your distributor or our cells are different company directly for servicing.

BMS_Hardware_Protect

Battery hardware under protection

Contact your distributor or our company directly for servicing.

BMS_Insulation_Fault

Battery insulation Contact your distributor or our

fault

company directly for servicing.

BMS_VoltSensor_Fault

Battery voltage sensor fault

Battery
BMS_TempSensor_Fault temperature sensor fault

Contact your distributor or our company directly for servicing.
Contact your distributor or our company directly for servicing.

BMS_CurrSensor_Fault

Battery current sensor fault

Contact your distributor or our company directly for servicing.

BMS_Relay_Fault

Battery relay fault

  1. Ensure the power cable is correctly and properly connected to the power connector (XPLUG) of the BMS
  2. If the first step still does not work, contact your distributor or our company directly.

BMS_Type_Unmatch

The type of BMS isunmatched

Contact your distributor or our company directly for servicing.

BMS_Ver_Unmatch

The version of

Contact your distributor or our

BMS isunmatched company directly for servicing.

25

Decommissioning
7 Decommissioning
7.1 Dismantling the Box
To shut down the system and dismantling the box, please follow the steps below: · According to the actual situation, please turn off the breaker located between the inverter and the parallel box. · Press the POWER button to shut down the box. · Move the circuit breaker switch to the OFF position. · Ensure that every indicator on the box is off. · Disconnect the cables between the box and inverter. · Disconnect the series wiring terminal on the box. · Disconnect the rest of cables. · If needed, unmount the box from the wall bracket to remove it from the wall.
7.2 Packing
Pack the box in the original packaging. If the original packaging is no longer available, use an equivalent carton or box that meets the following requirements:
· Suitable for loads over 154.32 lbs/69.94 kg · Properly closed and sealed
26

Maintenance
8 Maintenance
· If the ambient temperature for storage is 86°F~122°F/30~50, recharge · the batteries at least one time every 6 months. · If the ambient temperature for storage is -4°F~-86°F /-20~30, recharge
the batteries at least one time every 12 months. · If the batteries have not been used for more than 9 months, these batteries
must be charged to at least SOC 50 % each time. · For the first installation, the interval among manufacture dates of battery
modules shall not exceed 3 months. · If a battery is replaced or added for capacity expansion, each battery’s SOC
should be consistent. The max. SOC difference should be between ±5%. · If users want to increase their battery system capacity, please ensure that
the SOC of the existing system capacity is about 40%. The manufacture date of the new battery shall not exceed 6 months; in case of exceeding 6 months, please charge the new battery to around 40%. · Maintain periodically Only qualified person may perform the following works. During the process of using the box,the manage person shall examine and maintain the machine regularly.The concrete operations are as follows. 1) Check that if the cooling fans on the rear of house are covered by dirts, and the machine should be cleaned and absorbed dust when necessary. This work shall be check time to time. 2) Check that if the indicators of the box are in normal state,check if the keys of the box are in normal state,check if the display of the system is normal. This check should be performed at least every 6 months. 3) Check that if the input and output wires are damaged or aged. This check should be performed at least every 6 months. 4) Check whether the ground terminal and ground cable are securely con-nected and all terminals and ports are properly sealed every 12 months. 5) You should get the box panels cleaned and their security checked at least every 6 months.
27

Warranty
9 Warranty
Triple Power protects this product under warranty when it is installed and used as listed in this manual. Violation of the installation procedure or use of the product in any way not described in this manual will immediately void all warranties on the product. Triple Power does not provide warranty coverage or assume any liability for direct or indirect damages or defects that result from the following causes: · Force majeure (flooding, lightning strike, overvoltage, fire, thunderstorm, etc.) · Improper or noncompliant use · Improper installation, commissioning, start up or operation (contrary to the
guidance detailed in the installation manual supplied with each product) · Inadequate ventilation and circulation resulting in minimized cooling and
natural air flow · Installation in a corrosive environment · Damage during transportation · Unauthorized repair attempts · Failure to adequately maintain the equipment. An on-site inspection by a
qualified technician is possible following 120 months of continuous use. · Warranty claims made beyond 120 months from date of commissioning may
be declined if it cannot be demonstrated that the equipment has been adequately maintained. · External influence including unusual physical or electrical stress (power failure surges, inrush current, etc.) · Use of an incompatible inverter or devices · Connect to other brands of inverter without authority from our company.
28

Warranty Registration Form

For Customer (Compulsory)

Name Phone Number Address State Product Serial Number Date of Commissioning Installation Company Name Installer Name

Country Email Zip Code
Electrician License No.

For Installer

Module ( If Any )
Module Brand Module Size(W) Number of String

Number of Panel Per String

Battery ( If Any )
Battery Type Brand Number of Battery Attached Date of Delivery

Signature

Please visit our warranty website: https://www.solaxcloud.com/#/warranty to complete the online warranty registration or use your mobile phone to scan the QR code to register.
For more detailed warranty terms, please visit SolaX official website: www.solaxpower.com to check it.

PLEASE REGISTER THE WARRANTY IMMEDIATELY AFTER INSTALLATION! GET YOUR WARRANTY CERTIFICATE FROM SOLAX! KEEP YOUR INVERTER ONLINE & WIN SOLAX POINTS!

1
Open your camera app
and point your device
at the QR code

3
Click banner or notification when it appears on the screen

Notification Click the notification banner
OK

2
Wait for the camera to recognize
the QR code
4
Warranty registration page will be
loaded automatically

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

SOLAX POWER User Manuals

Related Manuals