SOLARMG S.MIG-QIG Three Phase Hybrid Inverter User Guide
- July 9, 2024
- SOLARMG
Table of Contents
SOLARMG S.MIG-QIG Three Phase Hybrid Inverter
Product Specifications:
- Model : SG 4-20KWHBT
- Type : Hybrid Inverter Three Phase
- Capacity : 4/5/6/8/10/12kW-25A, 10/12/15/20kW-40A
- Language : English
Product Usage Instructions
Installation:
-
Check PackingX List:
Ensure all components are included as per the packing list. -
Installation Location:
Ensure the installation location meets the specified space requirements. -
Installation Space:
Refer to the specified dimensions for the required installation space. -
Installation Angle:
Follow the recommended installation angle guidelines. -
Electrical Connection:
-
Cable Requirements:
-
Electrical Wiring Diagram:
-
-
Monitoring and Meter Connection
Installation
- Check Packing List
- Installation Location
- Installation Space
- Installation Angle****
- Mark the Position and Drill Holes
- Fix Wall Bracket
- Mounting Inverter
- Grounding Terminal Connection
Electrical Connection
Cable Requirements
Cable types
| Cable requirements
---|---
Outside diameter| Conductor core section
AC cable
| ****
13.0-18.0 mm
| ****
2.5-10.0 mm²
PV cable| 5.9-8.8 mm| 2.5-4.0 mm²
Battery power cable| 5.0-8.0 mm| 10 mm²
- AC Connector: Please distinguish the on-grid and back-up connector, On-grid connector is red and Back-up connector is Black.
- Battery power cable: If the conductor core of the battery cable is too small, which may cause poor contact between the terminal and the cable, please use the cable specified in the above table, or contact manufacturer to purchase terminals of other specifications.
Electrical Wiring Diagram
*Smart Meter consists of ACR10R and SM. Define the cable connections for the meter based on the actual meter model and refer to Meter Terminals Definition. This cable diagram is for reference only
Meter Terminals Definition
No.
| | ****
Function
---|---|---
ACR10R| SM
1| L1| ****
L1/L2/L3/N connect to grid to detect power grid voltage
2| L2
3| L3
4| N
5| L1-S1| ****
To detect the CT current and direction
6| L1-S2
7| L2-S1
8| L2-S2
9| L3-S1
10| L3-S2
11| /| PE| Ground connection
12| L| /| ****
Power supplied from grid
13| N| /
RS485
| /| |
RS485| RS485-2|
ANT| /| |
LAN| /|
Type-C| /| Type-C| ****
Communication Connection
Pin
|
Definition
|
Function
---|---|---
METER(RJ45-1)| RS 485| Communicate with Meter
BMS(RJ45-1)| CAN| Communicate with BMS
1| COM|
Multifunction Relay
2| NO (Normally Open)
3-4| /| Reserved
5| DRM4/8|
DRED
For Australia and New Zealand
6| DRM3/7
7| DRM2/6
8| DRM1/5
15| COM D/0
16| REF D/0
9-10| /| Reserved
11| Fast stop +|
Fast stop
12| Fast stop –
13| 485 B1|
EMS
14| 485 A1
17| CANL_P|
CAN for parallel connection of inverters
18| CANH_P
19-20| /| Reserved
Connect the Meter and BMS Communication Cables
Connect Other Cables
Installing the COM Connector
PV String Connection
PV Max. Input voltage is 950V without battery, or 850V with battery, otherwise inverter will be waiting.
Power Cable of the Battery Connection
Commissioning
App Preparation
- Install the Setup App and Monitoring App with latest version. Please refer to the product nameplate on side of enclosure to get the application.
- Register an account on Monitoring APP. If you have got the account and password from the distributor/ installer or manufacturer, skip this step.
Inspection Before Commissioning
Check the following items before starting the inverter:
- All equipment has been reliably installed.
- DC switch(es) and AC circuit breaker are in the “OFF” position.
- The ground cable is properly and reliably connected.
- The AC cable is properly and reliably connected.
- The DC cable is properly and reliably connected.
- The communication cable is properly and reliably connected.
- The vacant terminals are sealed.
- No foreign items, such as tools, are left on the top of the machine or in the junction box (if there is).
- The AC circuit breaker is selected in accordance with the requirements of this manual and local standards.
- All warning signs & labels are intact and legible.
Commissioning Procedure
If all of the items mentioned above meet the requirements, proceed as follows
to start up the inverter for the first time.
- Turn on the AC breaker.
- Turn on the lithium battery breaker. Power on the battery pack manually if a battery is equipped.
- Turn the DC switch, the DC switch may be integrated in the inverter or installed by the customer.
- If the irradiation and grid conditions meet requirements, the inverter will normally operate. The connection time for inverter to gird may take few minutes or even to more according to different country code chosen in the initial settings and the real site grid condition.
- Observe the LED indicator to ensure that the inverter operates normally.
WiFi Module Configuration Guide
LAN Module Configuration Guide
If DHCP is enabled on the router, the LAN module does not need to be configured. Otherwise, the LAN module will need to be configured on inverter screen.
- Find the “General Settings” by short pressing the button on the inverter screen.
- Enter the “General Settings” by long pressing the button on the inverter screen.
- Find “DHCP set” by short pressing the button, then turn off DHCP function by short pressing and long pressing the button on the inverter screen.
- Then set the “IP Address”, “Gateway Address”, “Subnet Mask” and “DNS Address”. Short press to change the number, long press to confirm the number and jump to the next number.
Local configuration App
The local configuration App is designed for quick configuration of hybrid inverters, offering features such as safety code, battery brand and type, work modes, and off-grid application settings through WiFi direct connection, etc.
There are two connection modes, WiFi direct connection and router connection.
-
The smartphone connects WIFI monitoring device directly.
The smartphone and the monitoring device are connected to the router together. -
Open “Setup APP”,Tap“Scan”,A list of inverter WiFi-AP names pop up.
-
Click and select the inverter WiFi-AP which you want to connect.
-
Select the login role.
-
Input the password(123456),Tap“Login In”.
-
If connected and logined, the Setup APP main interface will be displayed.
Indicator
Inverter
Monitoring Device
Indicator Status
| ****
Description
---|---
Off
| ****
Connection abnormal
Always On
| ****
Communicate with the server normally
Slow flashing
| ****
The monitoring device is not connected to the router or is not connected to the base station.
Quick flashing
| ****
The monitoring device is connected to the router or connected to the base station but not connected to the server.
Button
| ****
Description
---|---
Press 1 second
| ****
Reset device, the indicator goes off for 2 seconds, then flashes normally.
Press 5 second
| ****
Restore factory default settings, the indicator goes off for 2 seconds, then flashes once every 2 seconds, until the factory restore is completed.
HYBRID INVERTER THREE-PHASE
FAQ
Q: What should I do if the battery power cable conductor core is too
small?
A: If the battery cable core is too small, it may cause poor contact. In such
cases, use cables specified in the manual or contact the manufacturer for
suitable terminals.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>