SOLARMG S.MIG-QIG Three Phase Hybrid Inverter User Guide

July 9, 2024
SOLARMG

SOLARMG S.MIG-QIG Three Phase Hybrid Inverter

Product Specifications:

  • Model : SG 4-20KWHBT
  • Type : Hybrid Inverter Three Phase
  • Capacity : 4/5/6/8/10/12kW-25A, 10/12/15/20kW-40A
  • Language : English

Product Usage Instructions

Installation:

  • Check PackingX List:
    Ensure all components are included as per the packing list.

  • Installation Location:
    Ensure the installation location meets the specified space requirements.

  • Installation Space:
    Refer to the specified dimensions for the required installation space.

  • Installation Angle:
    Follow the recommended installation angle guidelines.

  • Electrical Connection:

    • Cable Requirements:

    • Electrical Wiring Diagram:

  • Monitoring and Meter Connection

Installation

  1. Check Packing ListSOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig- \(1\)
  2. Installation LocationSOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig- \(2\)
  3. Installation Space
  4. Installation Angle****

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(3\)

  1. Mark the Position and Drill Holes
  2. Fix Wall Bracket
  3. Mounting Inverter
  4. Grounding Terminal Connection

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(4\)

Electrical Connection

Cable Requirements



Cable types

| Cable requirements
---|---
Outside diameter| Conductor core section


AC cable

| ****

13.0-18.0 mm

| ****

2.5-10.0 mm²

PV cable| 5.9-8.8 mm| 2.5-4.0 mm²
Battery power cable| 5.0-8.0 mm| 10 mm²

  • AC Connector: Please distinguish the on-grid and back-up connector, On-grid connector is red and Back-up connector is Black.
  • Battery power cable: If the conductor core of the battery cable is too small, which may cause poor contact between the terminal and the cable, please use the cable specified in the above table, or contact manufacturer to purchase terminals of other specifications.

Electrical Wiring Diagram

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(5\)

*Smart Meter consists of ACR10R and SM. Define the cable connections for the meter based on the actual meter model and refer to Meter Terminals Definition. This cable diagram is for reference only

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(6\)

Meter Terminals Definition


No.

| | ****

Function

---|---|---
ACR10R| SM
1| L1| ****


L1/L2/L3/N connect to grid to detect power grid voltage

2| L2
3| L3
4| N
5| L1-S1| ****




To detect the CT current and direction

6| L1-S2
7| L2-S1
8| L2-S2
9| L3-S1
10| L3-S2
11| /| PE| Ground connection
12| L| /| ****

Power supplied from grid

13| N| /


RS485

| /| |
RS485| RS485-2|

ANT| /| |
LAN| /|

Type-C| /| Type-C| ****

Communication Connection

Pin

|

Definition

|

Function

---|---|---
METER(RJ45-1)| RS 485| Communicate with Meter
BMS(RJ45-1)| CAN| Communicate with BMS
1| COM|

Multifunction Relay

2| NO (Normally Open)
3-4| /| Reserved
5| DRM4/8|

DRED

For Australia and New Zealand

6| DRM3/7
7| DRM2/6
8| DRM1/5
15| COM D/0
16| REF D/0
9-10| /| Reserved
11| Fast stop +|

Fast stop

12| Fast stop –
13| 485 B1|

EMS

14| 485 A1
17| CANL_P|

CAN for parallel connection of inverters

18| CANH_P
19-20| /| Reserved

Connect the Meter and BMS Communication Cables

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(9\)

Connect Other Cables

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(10\)

Installing the COM Connector

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(11\)

PV String Connection

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(12\) PV Max. Input voltage is 950V without battery, or 850V with battery, otherwise inverter will be waiting.

Power Cable of the Battery Connection

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(13\)

Commissioning

App Preparation

  1. Install the Setup App and Monitoring App with latest version. Please refer to the product nameplate on side of enclosure to get the application.
  2. Register an account on Monitoring APP. If you have got the account and password from the distributor/ installer or manufacturer, skip this step.

Inspection Before Commissioning
Check the following items before starting the inverter:

  1. All equipment has been reliably installed.
  2. DC switch(es) and AC circuit breaker are in the “OFF” position.
  3. The ground cable is properly and reliably connected.
  4. The AC cable is properly and reliably connected.
  5. The DC cable is properly and reliably connected.
  6. The communication cable is properly and reliably connected.
  7. The vacant terminals are sealed.
  8. No foreign items, such as tools, are left on the top of the machine or in the junction box (if there is).
  9. The AC circuit breaker is selected in accordance with the requirements of this manual and local standards.
  10. All warning signs & labels are intact and legible.

Commissioning Procedure
If all of the items mentioned above meet the requirements, proceed as follows to start up the inverter for the first time.

  1. Turn on the AC breaker.
  2. Turn on the lithium battery breaker. Power on the battery pack manually if a battery is equipped.
  3. Turn the DC switch, the DC switch may be integrated in the inverter or installed by the customer.
  4. If the irradiation and grid conditions meet requirements, the inverter will normally operate. The connection time for inverter to gird may take few minutes or even to more according to different country code chosen in the initial settings and the real site grid condition.
  5. Observe the LED indicator to ensure that the inverter operates normally.

WiFi Module Configuration Guide

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(14\)SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-
Inverter- fig- \(15\)

LAN Module Configuration Guide

If DHCP is enabled on the router, the LAN module does not need to be configured. Otherwise, the LAN module will need to be configured on inverter screen.

  1. Find the “General Settings” by short pressing the button on the inverter screen.
  2. Enter the “General Settings” by long pressing the button on the inverter screen.
  3. Find “DHCP set” by short pressing the button, then turn off DHCP function by short pressing and long pressing the button on the inverter screen.
  4. Then set the “IP Address”, “Gateway Address”, “Subnet Mask” and “DNS Address”. Short press to change the number, long press to confirm the number and jump to the next number.

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(17\)Local configuration App

The local configuration App is designed for quick configuration of hybrid inverters, offering features such as safety code, battery brand and type, work modes, and off-grid application settings through WiFi direct connection, etc.

There are two connection modes, WiFi direct connection and router connection.

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(18\)

  1. The smartphone connects WIFI monitoring device directly.
    The smartphone and the monitoring device are connected to the router together.

  2. Open “Setup APP”,Tap“Scan”,A list of inverter WiFi-AP names pop up.

  3. Click and select the inverter WiFi-AP which you want to connect.

  4. Select the login role.

  5. Input the password(123456),Tap“Login In”.

  6. If connected and logined, the Setup APP main interface will be displayed.

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(19\)

Indicator

Inverter

SOLARMG-S.MIG-QIG-Three-Phase-Hybrid-Inverter- fig-
\(20\)

Monitoring Device


Indicator Status

| ****

Description

---|---


Off

| ****

Connection abnormal


Always On

| ****

Communicate with the server normally



Slow flashing

| ****

The monitoring device is not connected to the router or is not connected to the base station.


Quick flashing

| ****

The monitoring device is connected to the router or connected to the base station but not connected to the server.


Button

| ****

Description

---|---


Press 1 second

| ****

Reset device, the indicator goes off for 2 seconds, then flashes normally.



Press 5 second

| ****

Restore factory default settings, the indicator goes off for 2 seconds, then flashes once every 2 seconds, until the factory restore is completed.

HYBRID INVERTER THREE-PHASE

FAQ

Q: What should I do if the battery power cable conductor core is too small?
A: If the battery cable core is too small, it may cause poor contact. In such cases, use cables specified in the manual or contact the manufacturer for suitable terminals.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals