msi EV Series Charger User Guide

July 7, 2024
MSI

msi EV Series Charger

msi-EV-Series-Charger

msi EV Series Charger

Hardware Setting

  • Installation The EVSE must only be installed by licensed electricians in accordance with all applicable local and national electrical codes and standards, in a location with nonrestricted access.
  • Do not open the EVSE, except by qualified service person.
  • The EVSE must be connected to a grounded, metal, permanent wiring system or an equipment grounding conductor must be run with the circuit conductors and connected to the equipment grounding terminal or lead on the EVSE
  • Use a measuring instrument to check that there is no voltage.

Step 1: location definitionmsi-EV-Series-Charger-
fig-1

Recommended installation space Installers shall follow applicable accessibility requirements for the mounting position. The EVSE shall be mounted at a height between 600 mm (23.6 inches) and 1200 mm (47.2 inches) above ground. The EV AI requires the installation of the Wall Mount bracket at a distance of 760 mm (29.9 inches) from the ground to ensure proper detection of the license plate by the camera.

Step 2: Installation Stepsmsi-EV-Series-Charger-
fig-2

  1. Choose a suitable location and ensure it is a masonry wall. Determine the installation position of the EVSE and mark the top two holes and the bottom two holes on the wall for drilling in alignment with the wall mount bracket.

  2. Use a suitable drill bit to drill holes with a diameter of 12.7 mm (0.5 inches or 1/2”) and a depth of 40 mm (1.57 inches or 1 9/16”).

  3. Insert four expansion bolts into the drilled holes. Ensure the bolts are fully inserted. (Note: Expansion bolts are not included and must be purchased separately.)

  4. Loosen the nuts and remove the washers from the expansion bolts.

  5. Align the wall mount bracket with the expansion bolts. Place the bracket onto the wall, ensuring that the bolts align with the corresponding holes on the bracket. Install washers and nuts on each of the four expansion bolts. Tighten the nuts to a torque of 10.9Nm to securely attach the bracket to the wall.

  6. Use a screwdriver to remove the 2 screws on the camera cover of the EVSE, and remove the cover. (Note: The diagrams shown below are based on the model with a camera feature.)

  7. Remove the 4 screws that secure the plastic cover. Then, remove the plastic cover.

  8. Install 4*M6 screws (included in the screw bag) on the back of the EVSE

  9. Hang the EVSE onto the wall mount bracket.

  10. Use 2*M6 waterproof screws (included in the screw bag) to secure the EVSE onto the wall mount bracket.

  11. Insert the AC input power cable with the appropriate amperage rating through the bottom entry of the EVSE. Connect it to the L1, L2/N, and Ground terminals using UL-approved and insulated ring terminals. For the connections to L1 and L2/N, use M6 ring terminals with an inner diameter of 6.4 mm. Tighten them to a torque of 18-20 kgf.cm. For the Ground terminal, use M4 ring terminal with an inner diameter of 4.3 mm. Tighten it to a torque of 8.0 kgf.cm +/-10%.
    Amps| AC input power cable
    ---|---
    60| 4AWG (22mm²), 90°C XLPE
    32| 6AWG (14mm²), 90°C XLPE

Important

  * When securing the AC input power cable, the cable must be straightened and cannot be skewed or overlapping.
  * The LAN cable within the charger should be wrapped in a heat shrink tube rated for 300 volts to ensure safety.
  * Please make sure the house grounding connection quality is good enough.
  1. There are optional components located above the screw terminal blocks. Please follow the instructions as below:
    • A. LAN Port (Optional): EV Life Plus, EV Premium offer an optional LAN port for wired connection if required.
    • B. SIM Card Slot (Optional): EV Life Plus, EV Premium offer an optional SIM card slot for LTE/4G connection. Insert a SIM card into the SIM card slot, if required.
    • C. Testing Switch: Please always keep the switch in the down position. Note the switch is for internal testing purposes only and should not be switched to the up position, as it may cause in abnormal startup or crashes.
    • D. USB-C Port: This port is for internal testing purposes by the manufacturer.msi-EV-Series-Charger-fig-12
  2. Assemble the bottom cover onto the EVSE using the new M3*8 screws (included in the screw bag). Tighten the screws with a torque of 5 kgf·cm ±10%. Lock the screws in the following order: first, lock the 2 screws on the bottom; then lock the screws on the top left, top right, bottom right, and finally bottom left.

m-Connect Setting

  • The quick start manual is applicable to household MSI EV Life Plus / EV Premium models.
  • Before use, please confirm that external network connection and the signal is good and can connect to internet.
  • Network recommendation: To connect to the wired LAN or Wi-Fi or please build a “power line”.
  • Initial settings can be completed through mobile phones, computers, or tablets.
  • Please download EV Life APP and complete registration and activate your account before start setting.

Initialize settings for EV charger

Step 1 : Connect to the charging station by Wi-Fi.

EV Premiummsi-EV-Series-Charger-fig-14

  • Use mobile phone/tablet (turn off mobile network)

    1. Camera scanning Step 1 QR code
      (The charging station Wi-Fi password will be automatically brought in, and some mobile phones need to be entered by manually)

    2. camera scanning Step 2 QR code pops up the m-connect+ screen (If the “Privacy Settings” message pops up, please click “Continue”)

  • Please refer to the EV Life Plus method when using a laptop

Use mobile phone/tablet (turn off mobile network)

  1. Camera scanning the QR code label inside charger or from the label in zipper bag (The charging station Wi-Fi password will be automatically brought in, and some mobile phones need to be entered by manually)
  2. Open an explorer (Chrome or Firefox will be recommend)
  3. Enter the URL https://mconnect.msi.com (If the “Privacy Settings” message pops up, please click “Continue”)
  4. The screen displays m-Connect+ (that is, the background of this product)

Step 2: Log in m-Connect

  1. Select “Personal Mode”msi-EV-Series-Charger-fig-16

  2. Default ID: msi
    Password: msi123msi-EV-Series-Charger-fig-17

  3. Setup new ID account and password
    The password needs to be reset. It needs to be 8~20 characters, including numbers and English uppercase and lowercase letters.msi-EV-Series-Charger-
fig-18

Step 3: Setup m-Connect

  1. Setup static IP (wired LAN)

    • If you do not use static IP, please click Next.msi-EV-Series-Charger-fig-19
  2. Configure the Wifi (wireless network)

    • Choose a SSID which can use and “Enter Password” then click “Next”.
    • If you do not need to setup it, please press “Skip”
      Note : Recommended the signal quality which better to over than 85%.
  3. Connect with MSI EV Life account

    • Please confirm the external network connection status must be ok.
    • Enter the ID and password which registered the same with APP.
    • Login failed: please check internet connection problem.
    • Login error displayed: Please confirm ID or password.msi-EV-Series-Charger-fig-21

Step 4: Basic setting

msi-EV-Series-Charger-fig-22

  1. Emergency button Behavior after button released
    • Automatic reset No need to turn on the power switch again
    • Manual reset Need to turn on the power switch again
  2. EV charger ID (naming)
  3. Time zone choose your location.
  4. Interface language Language for display.
  5. output current Please setup according to Breaker. 32A 8A~32A 60A 8A~60A
  6. ID card setting
    • all allow
    • reject all
    • Identification card (only accepted cards can be authorized)

Step 5: Add identification cardmsi-EV-Series-Charger-
fig-23

  1. Place the identification card at induction area, and the card number is detected and shows in the ID position.
  2. Set a card name and charging permission (agree or reject)
  3. Click + to add another new card. If you do not need to set card permissions, please click “Skip”.

Step 6: Complete settings

Once the initial settings are configured successfully, you will see an “All Done” message. You will also see “Go to m-Connect+ Management” button as shown in the screenshot below.msi-EV-Series-Charger-fig-25