ecotap 65458061 Duo Wide Charging System User Manual

June 29, 2024
ecotap

ecotap 65458061 Duo Wide Charging System

INTRODUCTION

Thank you for choosing for an Ecotap® charging station. This manual is regarding the charge point DUO Wide Plus. This manual contains important information for properly and safely installing and using the charging station. This charging station is designed for vehicles that are equipped with a mode 3 charging system that complies with IEC 61815-1 (version 2.0) and a plug system that complies with VDE-AR-E 2623-2-2. Together with the vehicle and system, the charging station will select the best option for charging the vehicle quickly and safely. The entire charging station complies with the 2014/35/EU directive dealing with the harmonisation of regulations regarding electric materials within certain voltage limits (a recast of all previously published versions). This manual explains how to safely install and use the charging station. This manual was drawn up in such a way as to ensure the charging station’s maximum functioning and lifespan. This manual was drawn up with great care. However, should anything remain unclear after reading it, please contact your supplier before you install the charging station. We cannot guarantee that this charging station will function properly unless it is installed by an authorised or certified installer / mechanic.

Read this manual carefully before you install or use the charging station. Save this manual and store it near the station so that the instructions and safety regulations will always be readily available.
© Copyright No part of this publication may be copied, reproduced or saved in a retrieval system without Ecotap® B.V.’s prior written consent. This is an English translation of the original Dutch manual.

GENERAL

Warranty
The Ecotap® B.V. General terms and conditions for delivery apply here. Ecotap® B.V. cannot be held accountable for any injury or damage to goods should the charging station be altered, damaged, refitted or expanded upon with other components, or not used in accordance with the instructions and conditions set out here.

Symbols used in this manual and on the charging system

DEVICE DESCRIPTION

Use
This charging station is especially designed for public areas. The station can be installed in various environments: in paved areas, in open soil/sand, or in asphalt surfaces.

The following environments, however, are not suitable:

  • All grounds that can flood
  • Loading quays
  • Slope at an angle of more than 4%

Accessories
The following accessories will not be provided: tools, foundation.

Safety provisions

  • 2 half euro profile cylinders
  • Extra caps behind front cap
  • 12 Volt control voltage
  • Components comply with IP2 at least
  • Strain reliefs
  • 4 mm steel casing
  • IP54 (lowest waterproof class for Mennekes outlets).

SAFETY

Read the following safety regulations carefully before you install and use the charging station.

Safety regulations
Before you install the charging station, you must make sure the location is safe for all bystanders. NEVER allow children onto this worksite. Never allow ANYONE who has nothing to do with the work onto the worksite.

  • Never be distracted while you are performing the work.
  • Make sure you maintain a healthy posture at all times while doing the work.
  • Do not leave any tools or charging station components unattended.
  • Make sure any tools you are using are clean and dry.
  • Make sure that the charging station, tools and components will stay dry when it is raining.
  • Make sure that there is no danger of anyone tripping over objects or paving while you are digging the hole for the foundation.
  • Make sure to wear good, suitable gloves for any special actions throughout the entire installation and connection process.
  • Always check any measuring instruments you will be using to disconnect the installation from its power supply before you use them, checking them several times to make sure they are working properly.

MANDATORY CHECKS BEFORE INITIAL USE
The following checks are mandatory before the charging station goes live. NEVER use the charging station if one or more of the checks indicate that the power supply or stability of the charging station does not suffice. Check the insulation resistance of the various conductors in accordance with NEN1010 provision 61.3.3. Always perform the checks below before voltage is applied to the DUO charging station.

  • All of the activities listed below must be performed in accordance with NEN 3140.
  • Check whether the wires have been connected to the terminals in the right order.
  • Check whether the conductors on the terminals have been screwed on properly (4 to 5 NM).
  • Check whether the grounding connector has been connected to the coded terminal and whether it has been connected to the grounding electrode or the supplied grounding device. The entire grounding system must comply with the

NEN1010/EU/35.

  • Check whether the charging station is stable.
  • Check whether the seals on the charging station’s caps have been installed properly during installation (IP54).
  • Check whether any actions still need to be performed, so that they may be performed safely.
  • Make sure there are no obstacles surrounding the worksite.
  • Before any voltage is applied to the charging station, make sure to contact Ecotap® B.V. by calling 0031 (0) 411-210210 so that we can activate that particular station’s software; we will need the station’s unique code to do so.

USER / INSTALLATION MANUAL

Mounting the casing on the foundation

  • The foundation must be installed in a hole of 50×50 cm in size and 80 cm deep.
  • The bottom of the hole must be stable and flattened out properly. Place the foundation in the hole and check whether it level using a spirit level. You can correct any small deviations while you are closing the hole.
  • Place the charging station on the foundation without its 2 bent steel cap sections and mount it using the bolts and nuts supplied (the nuts go on the top).
  • Leave the transparent lids on the front of the charging station in place for now. Make sure the station faces the right way (i.e. the connecting side is at the front).
  • Close the hole using around 20 cm of soil/sand.Install the cap in the back using the nuts that have been supplied.
  • Keep in mind that there is sufficient space for the operation of the charging station. For this we advise to keep at least 1 meter of free space around the charging station.

T1.1

T1.2

T 1.3

Opening and closing the charging station
Always de-energise the charging column and read the operating instructions before handling maintenance or malfunctions. The lock that locks the entire Duo Wide charging column is situated at the back of the charging point, at the bottom of the door. (See Picture T 1.4)

There is a cover in front of the lock that stops sand and dirt.

  • Remove the cover plate with Allen 2.5.
  • Open the charging point with the supplied key.
  • Put your key in the right lock.
  • Turn the key all the way to the right.
  • Turn the entire cylinder (incl. 2 locks) completely anti-clockwise.

For this purpose use a flat screwdriver which you can place in the slot.

  • After unlocking the lock, the door can be disconnected from the charging point:

    • Grab the door.
      Slide the door up (± 1cm).

    • move the bottom of the door away from the charging point and then down.

T1.4

Installing the protective casing
The casing pipe is delivered in the box. After the charging station is mounted on the foundation, the transparent plastic protective plate can be removed from the bottom of the charging station. Fit the casing as shown in drawing 1.3 and secure with the size of strain relief provided..

Insert cable and secure with supplied strain relief
Feed the power cable through the casing pipe. Avoid making it too long. Fit the cable clamp to the cable and secure it (max. 3 Nm).

Connecting the power cable
The meter board setup must be mounted fully as per the specifications, as required by the network manager in the region concerned. In addition, the network-operators-materials (connection box, cable and meter) must be connected in accordance with the installation instructions, guidelines and BEI safety instructions (provided by the network operator) by a contractor appointed by the network operator.

Connecting the grounding electrode/grounding conductor
Connect the earth wire of the connection cable to the main earth bar (HAR). Also connect the earth wire, which is connected to the earth connector, to the main earth bar (HAR) terminal, positioned as in Drawing 1.3. Fit the earthing fully in compliance with the applicable NEN1010 /EU/35 regulations.

Fuses per connection value
Below you will find a table with an explanation of which fuses must be used per socket per phase based on the network operator’s network connections used. With the right settings, the right software selectivity per socket can be applied by means of the back office.

  • Net connection value Fuses to be placed per socket
  • 3×25 A 20 A Gg fuses per socket per phase
  • 3×35 A 25 A Gg fuses per socket per phase
  • 3×50 A 32 A Gg fuses per socket per phase
  • 3×63 A 32 A Gg fuses per socket per phase
  • 3×80 A 32 A Gg fuses per socket per phase

MAINTENANCE

  • Always disconnect the charging station from its power supply completely and read the manual before performing any maintenance or fixing any malfunctions.
  • Repairs or replacements of components may only be done if using products that are approved by the supplier. When in doubt, please contact Ecotap® first.
  • Repairs and replacements must always be performed by an authorised person / specialist. The maintenance must always comply with and be performed in compliance with NEN3140 and NEN50110 low voltage European standards.
  • Check the charging station for any leaks.
  • Test the heating element and the thermostat together to make sure they are working correctly. The thermostat must be set to five degrees or to frost protection mode. Check the connections on the power supply cable and ensure a fixed connection of between 4 and 5 Nm.
  • Treat any minor damage to the charging station with corrosion-resistant paint in the right shades (Ecotap® green ral.6018 & white ral.9016).
  • Treat the cylinder locks with graphite powder or a suitable oil product if they require any maintenance.

TRANSPORTATION AND STORAGE
Transport the charging station (the core housing all of the technology) upright and prevent the coating from being damaged; any such damage might result in corrosion. Provided that they are properly protected to prevent them being damaged, the caps can be transported in a variety of positions. The charging station should be stored in a dry, damp-free area.

IN CASE OF MALFUNCTIONS
In case the DUO Wide charging station is not functioning (properly), please contact the Ecotap® 24/7 helpdesk immediately (phone number: 0031 (0) 411-745020) or a licensed mechanic in possession of measuring and testing equipment with auto simulation.
WARNING!
All work performed on and modifications made to the charging station must comply with NEN1010 at the very least.

OPERATION AND CONTROL OF CHARGING COLUMN

  • The charging column can be operated with a charging card.
  • This charging station is operated via a charging pass.
  • The charging pass first needs to be registered in the Open Charge Point Protocol (OCPP).
  • This necessary registration can be completed by phone by calling Ecotap® B.V. at 0031 (0) 411-210210 during office hours.
  • Once registration is complete, the charging column can be used with any Electric Transport Charging Card (EV Charging Card) or other suitable cards, mobile and key holders. When unused, the charging column will give an illuminated green signal with some regularity.
  • Operation : Starting or stopping charging is done by holding the charging card in front of the scan point, you hear 1 sound signal and the lamp starts flashing green.First, the plug is locked in the Mennekes charging socket.Then the charging column communicates with the vehicle and the BackOffice system. Once all safety and payment requirements have been checked, the maximum permissible charging current is transmitted. The charging procedure is now automatically switched on and the lamp lights blue. When stopping the charging process, hold the pass in front of the scan point again. You will hear 2 beeps and the lamp will flash green and go out as soon as the plug is unlocked. You can now safely remove the plug.

TECHNICAL SPECIFICATIONS

General characteristics

  • Reference number 65458061
  • Dimension H x W x D (mm) 1400 x 360 x 240
  • Casing material Steel 2,2 mm
  • Standard colour Body: Ral 6018 / Cover: Ral 9016
  • Steel treatment Anti-corrosion (KTL) and powder coating
  • Weight (kg) 75 kg
  • Number of charging points 2
  • Socket Type 2
  • Cable Type 2

Electrical characteristics

  • Power output per socket 0 to 22kW
  • Operating voltage (Ue) / Current rates (In A, In C) Single-phase cabling, phase + N 230V~ from 0 to 32A (determined at 20°C)
  • Three-phase cabling, 3 phases + N 400V~ from 0 to 32A (determined at 20°C)
  • Impulse voltage (Uimp) 4kV
  • Insulation voltage (Ui) 230V single-phase 500V three-phase
  • Frequency (fn) 50Hz/60Hz
  • Rated voltage 1 phase + N: 230V – 3 phases + N: 400V
  • Voltage tolerance (V) regardless of vehicle requirements 195V – 265V
  • Integrated protection system on charging station Main switch 125A
  • Integrated protection system per charge point MCB 40A curve C
  • RCD 40A 30mA Type B
  • Conditional short-circuit 6000A IEC/EN 60898-1 10kA IEC/EN 60947-2
  • Allowable thermal stress in Short Circuit 16 000 A²s
  • Connection to the mains Phase/Neutral, rigid cable, 2.5 to 35 mm², screw terminals H07 V R/U Earth, rigid cable, 2.5 to 35mm², screw terminals H07 V R/U
  • Type of load Mode 3 charging terminal equipped with a locking system for Mode 3
  • Vehicle connection Mode 3 connector socket Type 2 3P+N (single-phase compatible) with pilots compliant with IEC 62191-1 and IEC 62196-2.
  • Use only a manufacturer-approved plug with silver-plated contacts.
  • Use of extension and adapter prohibited.
  • Phase rotation on channel 2 (Rightside). In the case of monophase cabling (Ph+N) on the power source. Channel 2 will not be able to start charging sessions, until the phase rotation between contactor and socket are manually undone.
  • AC meters MID certified, Class B according to EN 50470-1, -3
  • Back office protocol OCPP 1.6 Json
  • Positioning GPS
  • Connectivity Ethernet RJ45 connector

Environment

  • Operating temperature -25°C / +50°C
  • Storage temperature -25°C / + 80°C
  • Relative humidity 0 to 90% without condensation
  • Protection rating IP 54 (IEC 60529), IK 10 (EN 62262) Plugged in or not
  • Noise level < 40 dBA at 1m
  • Product IEC 61851-1, IEC TS 61439-7 (AEVCS)
  • Installation Interior or exterior, limited access zone, intended for use by ordinary persons (DBO), assembly in cabinet (wall mounted),
  • Pollution Degree 3, TNS, TT,compatible earthing system.
  • In the event of an IT earthing system, this can be changed locally by adding an isolation transformer.
  • Electrical safety Class 1 IEC 61140

Electromagnetic compatibility

  • European standards Low Voltage Directive 2014 / 35EU / EMC Directive: 2014 / 30 / EU
  • Radio technology type GSM 2G/3G/4G, GPRS, RFID
  • Suitable charging cards Mifare, Ntag and iCODE SLI cards (more info)

CONTACT DETAILS SUPPLIER
Ecotap® B.V.
Kruisbroeksestraat 23
5281RV Boxtel – The Netherlands
Tel.: 0031 (0) 411-210210
E-mail:[email protected]

EC DECLARATION OF CONFORMITY

EC Declaration of Conformity for machines
(Directive 2014/35/EU, Annex II page 96/369) Ecotap® B.V. Industrieweg 4 5281RW Boxtel, The Netherlands, hereby declares that the charging stations stated below comply with the Machinery Directive and other regulations and standards mentioned.
Name : Ecotap® Charging station DUO Wide Plus Designed in: 2021

EC directives applied:

  • Machinery Directive 2014/35/EU
  • EMC Directive 2014/30/EU

Standards used as reference:

  • EN/IEC 60950-22:2017
  • EN/IEC61851-1:2017
  • EN/IEC61851-22:2002
  • EN/IEC 62196-2:2017
  • EN/IEC 61000-6-2:2016
  • EN/IEC 61000-6-3/2007 + A1:2011
  • EN/IEC 60335-1/2012 + A13:2017
  • EN/IEC 60364-4-41:2017
  • NEN/EN/IEC 60529
  • IEC 62262
  • NEN/EN/IEC 61439-1
  • IEC/TS 61439-7
  • Boxtel, March 2021

Ecotap B.V.
Kruisbroeksestraat 23
5281 RV Boxtel
The Netherlands
+31(0) 411 210 210
[email protected]
www.ecotap.nl

Documents / Resources

| ecotap 65458061 Duo Wide Charging System [pdf] User Manual
65458061 Duo Wide Charging System, 65458061, Duo Wide Charging System, Charging System, System
---|---

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

ecotap User Manuals

Related Manuals