marco SP9 Single Serve Undercounter Precision Brewer Instruction Manual

June 27, 2024
marco

marco SP9 Single Serve Undercounter Precision Brewer

Product Information

Specifications

  • Name: SP9 Single/Twin
  • Order Codes: 1000832US, 1000832(W)US, 1000833US, 1000833(W)US
  • Power: 2.4kW immediate @ 230V draw off
  • Boiler Capacity: 1 gallon
  • Cups per Hour: 50
  • Head Dimensions: 7.5 x 5.2 x 16.5 inches
  • Undercounter Boiler Dimensions: 15.5 x 6 x 22.2 inches
  • NEMA: L6-20P
  • Tap to Counter: 8.8 inches
  • Plumbing Requirements: Compression or 3/8 John Guest

Product Usage Instructions

  • When installing the machine, always observe the local regulations and standards.
  • The appliance is supplied with a NEMA L6-20P power cord.
  • A suitable mains power supply socket should be available within easy access of the appliance so that it can be disconnected easily after installation.
  • Ensure proper plumbing connections are made according to the provided specifications.
  • Compression or 3/8 John Guest fittings are recommended for plumbing installation.

NOTE: Because the machine is electronically controlled, no priming is necessary. Follow the startup procedures outlined in the manual.

FAQ

  • Q: How should I handle the packaging upon receiving the SP9 Single/Twin brewer?
  • A: SP9 Single/SP9 Single White models are packed and shipped in two boxes, while SP9 Twin/SP9 Twin White models are packed and shipped in three boxes. Carefully unpack and assemble the components following the provided instructions.
  • Q: What are the ventilation requirements for the SP9 brewer?
  • A: A clearance of 50mm/1.9 inches is required at each side and back of the machine if installed in an enclosed cabinet to ensure proper ventilation.

Overview

SP9 HEAD

  • 1000830

SP9 BOILER

  • 1000831US

DIMENSIONS

SPECS

PACKAGING

NAME

ORDER CODE

| PACKED WEIGHT| PACKAGING DIMENSIONS

(L x W x H inches)

| QTY / PALLET
---|---|---|---
SP9 Single

1000832US

| 13.2lb (head)

25.7lb (boiler)

Total: 38.9lb (2 boxes)

| ****

23 x 11.25 x 8.5 (head)

20 x 10.5 x 28 (boiler)

| 12
SP9 Single (White)

1000832(W)US

SP9 Twin

1000833US

| 13.2lb (per head)

25.7lb (boiler)

Total: 52.1lb (3 boxes)

| ****

23 x 11.25 x 8.5 (head x2)

20 x 10.5 x 28 (boiler)

SP9 Twin (White)

1000833(W)US

GOOD TO KNOW

  • SP9 Single / SP9 Single White [1000832 / 1000832(W)] is packed and shipped in two boxes.
  • SP9 Twin / SP9 Twin White [1000833 / 1000833(W)] is packed and shipped in three boxes.

SP9 SINGLE-SERVE PRECISION BREWER

COUNTER CUT-OUT

  • SP9 SINGLE 1000832US
  • SP9 TWIN 1000833US

VENTILATION REQUIREMENTS

  • 50mm/1.9” clearance is required at each side and back of machine if installed in an enclosed cabinet.

ELECTRICAL INSTALLATION

ELECTRICAL INSTALLATION PROCEDURE

  • When installing the machine, always observe the local regulations and standards.
  • The appliance is supplied with a NEMA L6-20P power cord.
  • A suitable mains power supply socket should be available within easy access of the appliance so that it can be disconnected easily after install.

PLUMBING INSTALLATION PROCEDURE

  • Ensure that the equipment is installed according to local plumbing & water regulations.
  • Mains water pressure required (limits): 14.5-145psi (100 -1000kPa, 0.1 – 1MPa).
  • Requires an inline water filter within your water specifications.
  • The machine is supplied with a 3/8” Compression or 3/8” John Guest.
  • Turn on the water to flush any impurities, dust, etc from the inlet hose and water pipe. Allow several liters through. Especially for new installations.
  • Connect the hose to the inlet valve of the boiler.
  • Make sure a sealing washer is fitted.
  • Turn on the water and check for leaks.
  • The SP9 Head has a drip tray attached with a drain outlet which should be plumbed to waste.

OPERATING BOILER FOR THE FIRST TIME

  • Check that all installation procedures have been carried out.
  • Ensure the water valve is on.
  • Plug in the SP9 Boiler to an appropriate electrical supply and press the power button on the front of the machine.
  • The light will glow green and the machine will fill to a safe level, above the elements, before heating.
  • The “Ready/Status” light will cycle two red flashes while the machine is filling to the safe level.
  • After this amount of water has heated to the set point the machine will draw more water in until the temperature drops by 1 or 2 degrees. The machine will then heat again. This heat fill cycle continues until the SP9 Boiler is full.
  • Whilst the machine is above the safe level and filling, the “Ready/Status” light will remain blank.
  • The “Ready/Status” light will glow green when the machine is both full and up to normal operating temperature.
  • The SP9 Boiler takes 15 minutes to heat up initially.
  • The SP9 Boiler is now ready for use.

NOTE: Because the machine is electronically controlled no priming is necessary.

For more information visit www.marcobeveragesystems.com.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals