marco 1000940 POUR’D Control Box Instruction Manual
- June 6, 2024
- marco
Table of Contents
marco 1000940 POUR’D Control Box
Connections
This equipment must be installed with adequate backflow protection to comply with all applicable federal, state and local codes.
Place on top of MIX boiler or on shelf make sure rubber feet are only points of contact
VITOP BIB connector
Remove red plastic seal from tap
HOT/COLD WATER, DILUTED CONCENTRATE & CONCENTRATE SHOT
3 button connections (1000942 3b concentrate)
Control box setup
Boiler setup
volumes or ratios
Control box setup
Connecting Hoses
Single Source Ready to Drink (3B font, 3 volumes3
Concentrate Shot
Multiple Source Ready to Drink
Engineering Setup & Calibration
3 finger press long hold Set mode UC MIX BOTH Set all temperatures the same
Button Setup
Programmable buttons
Program and change buttons accordingly
Cleaning
- Disconnect Beverage source from silicone tubing.
- Put tubing into a bucket of cleaning solution.
- Press cleaning option on control box.
- Replace cleaning solution with clean hot water.
- Press cleaning option on control box.
- Reconnect BIB to silicone tubing.
- Press any button on font 5 times to fully clear tubing/pump of any residual water. Cleaning takes approximately 60 seconds.
- Font is now ready to operate.
Operating Font
- Push & Hold
- Push & Release
RISK OF SCALDING
- If using a boiler, turn off before cleaning to prevent accidental triggering of a dispense.
- Beware of accidentally operating the control box especially when cleaning around the push buttons.
- Do not use abrasive cloths or creams, as this will spoil the finish of the control box.
Marco Beverage Systems Limited. 63d Heather Road, Sandyford Industrial Estate, Dublin 18 t: +353 (0)1 295 2674 f: +353 (0)1 295 3715 e: sales@marco.ie www.marcobeveragesystems.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>